Running head: IT PROJECT MANAGEMENTIT Project ManagementName of the StudentName of the UniversityAuthor Note

1 IT PROJECT MANAGEMENTTable of ContentsAbstract................................................................................................................................2Introduction..........................................................................................................................2IT project disasters: Reasons?.............................................................................................2Findings: Case Studies.........................................................................................................3Conclusion...........................................................................................................................4References............................................................................................................................5

2 IT PROJECT MANAGEMENTAbstractThe purpose of this report is to evaluate the issues and problems that certain IT projects faced.The reason of project failure is evaluated on basis of different IT projects failure and chaosreports. The main objective of this report is to analyze the objections or reasons of the chaos.Different chaos reports are analyzed in order to understand the main reason of IT project failureand the problems associated with those failed projects. Introduction The chaos reports on IT project failure for last few years are analyzed in order tounderstand the problems associated with the failed projects. Success of a project depends onmany variable, similarly there are different reasons behind failure of a project. Going through thechaos reports of project failure helps in analyzing the different risks associated with a project,which further helps in identifying the risk mitigation approaches for similar projects in future(Hussain & Mkpojiogu, 2016). For example, the ERP implementation project of Hershey, thatfailed due to improper project planning and project schedule. The findings of the chaos reportfrom Standish group are elaborated in the following paragraphs. IT project disasters: Reasons? The chaos report by Standish groups identifies the scope of the software project failures,the major factors associated with a project and the process by which the project failures can bereduced. According to a report of Standish group, it is found out that almost 52.7% of theprojects costs 189% of their original estimates while 31.1% of the projects are generallycancelled before their completion (The Standish Group Report, 2014). The main reason of costoverruns in the project is improper measurement and project planning. The research further show

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Boston's Central Artery/Tunnel Project: Analysis of Cost and Time Overruns
|16
|1242
|110

Executing and Closing Project Report 2022
|16
|4189
|37

Introduction to Object-oriented Analysis and Design
|39
|7485
|59

Journal of Advanced College of Engineering and Management Project 2022
|15
|9733
|45

CSM80001 Project Costing: Assignment
|16
|2885
|58

Problems of Adopting a New Software Development Process
|5
|778
|107