Running head: ENTP40075 Management SkillsMAYFAIR RESTAURANT – EXPANSION PROJECTName of the StudentName of the UniversityAuthor Note
1ENTP40075 MANAGEMENT SKILLSTable of ContentsProject Planning.........................................................................................................................2Planning Documents..................................................................................................................2Work Breakdown Structure........................................................................................................2Schedule.....................................................................................................................................3Costing.......................................................................................................................................5Stakeholder Analysis..................................................................................................................9Communication Plan................................................................................................................10Risk Evaluation........................................................................................................................10Bibliography.............................................................................................................................11
2ENTP40075 MANAGEMENT SKILLSProject PlanningFor the completion of this project, the area was first assessed and then the process forthe initiation was discussed with the owner of the place. The place was to be analyzed andchanged into a secondary location for the restaurant. The area had been used as a storageplace for another user and had recently been leased to the owner. There is a floor area of 1200m2where new water supply is to be added and subsequently worked on the floor and thewalls. The complete redecoration of the work needs to be completed for the owner. Apartfrom this, the owner requires the floor to be divided up into 2 portions and install a TV ineach of the rooms. The owner also requested a lobby area along with sofa to be installed onthe floor. This report consists of the various planning documents which are to be needed forthe completion of the project within the timeline.Planning DocumentsWork Breakdown Structure
3ENTP40075 MANAGEMENT SKILLSScheduleWBSTask NameDurationStartFinish0MAYFAIR RESTAURANT -EXPANSION PROJECT124 daysWed 2/1/17Mon 7/24/171Start Off Meeting24 daysWed 2/1/17Mon 3/6/171.1Sponsor Review and Concept Planning2 daysWed 2/1/17Thu 2/2/171.2Feasibility Study3 daysFri 2/3/17Tue 2/7/171.3Stakeholder Identification2 daysWed 2/8/17Thu 2/9/171.4Sponsor Review and Acceptance2 daysFri 2/10/17Mon 2/13/171.5Document the Project3 daysTue 2/14/17Thu 2/16/171.6Research4 daysFri 2/17/17Wed 2/22/171.7Project Plan and Documentation6 daysThu 2/23/17Thu 3/2/171.8Sponsor Review and Acceptance2 daysFri 3/3/17Mon 3/6/171.9Project initialization complete0 daysMon 3/6/17Mon 3/6/172Execution of the Project39 daysTue 3/7/17Fri 4/28/172.1Assess the Area3 daysTue 3/7/17Thu 3/9/172.2Clear Out the Room5 daysFri 3/10/17Thu 3/16/172.3Gather Required Materials7 daysFri 3/17/17Mon 3/27/172.4Initial Work on the Floor5 daysTue 3/28/17Mon 4/3/172.5Work On the Walls7 daysTue 4/4/17Wed 4/12/172.6Installation of the Electrical Wiring12 daysThu 4/13/17Fri 4/28/172.7First phase of the project0 daysFri 4/28/17Fri 4/28/173Water Supply Activation29 daysMon 5/1/17Thu 6/8/173.1Contact the Specific Person for the Job1 dayMon 5/1/17Mon 5/1/173.2Submit the Required Papers2 daysTue 5/2/17Wed 5/3/173.3Clear Out the Inspection1 dayThu 5/4/17Thu 5/4/173.4Deposit the Money1 dayFri 5/5/17Fri 5/5/173.5Start Execution1 dayMon 5/8/17Mon 5/8/173.6Layout the Plan for the Water Lines12 daysTue 5/9/17Wed 5/24/173.7Buy Materials3 daysThu 5/25/17Mon 5/29/173.8Work On the Main Inlet of Water2 daysTue 5/30/17Wed 5/31/173.9Follow Up On The Basis Of the Plan6 daysThu 6/1/17Thu 6/8/173.10Installation of Water Works0 daysThu 6/8/17Thu 6/8/174Divide the Floor into Two Parts21 daysFri 6/9/17Fri 7/7/174.1Build Two Washrooms12 daysFri 6/9/17Mon 6/26/174.2Install TV into the Two Rooms3 daysTue 6/27/17Thu 6/29/174.3Design the Lobby Area2 daysFri 6/30/17Mon 7/3/174.4Assess the Area for the Sofa1 dayTue 7/4/17Tue 7/4/174.5Buy Sofa1 dayWed 7/5/17Wed 7/5/174.6Install Sofa2 daysThu 7/6/17Fri 7/7/174.7Division of the floor0 daysFri 7/7/17Fri 7/7/175Project Closing11 daysMon 7/10/17Mon 7/24/17