Construction Project Report: Work Arrangements and Resource Planning
VerifiedAdded on 2022/11/13
|7
|1350
|351
Report
AI Summary
This report provides a comprehensive overview of key aspects in construction project management, addressing work arrangements, resource planning, and workplace safety. It details various methods for informing stakeholders, including verbal communication, meetings, and electronic communication, while also identifying both internal and external stakeholders affected by the project. The report emphasizes the consequences of inadequate information, such as project underestimation and cost escalation. It further explores techniques for agreeing on work programs, organizing work activities, and identifying required resources, including people, tools, and materials. The report also discusses strategies for controlling the workplace to ensure safety and maintain a tidy environment, highlighting the positive impact of a safe environment on the organization's image. Special considerations, their recording, and communication are addressed, along with methods for organizing work area layouts, efficient material storage, and use. This report offers valuable insights for effective project management in the construction industry.

1.2 Explain different methods of informing the people affected of the work
arrangements
The management of the construction industry needs to be responsible and highly cautious
during any kinds of ongoing constructions. The developer of the construction project has an
increased responsibility. The responsibility comes from the fact that the person has to
maintain different perspectives of the new construction site. The arrangements to inform and
consult means that there is an ongoing communication process between the employer and the
employees. The different methods of informing the people affected by the work performance
includes the likes of;
a. Verbal Communication process
b. Meetings and conferences
c. Notices
d. Electronic communication
1.3 List the types of people, internal and external to the project, who could be affected
by work relevant to typical projects.
The internal stakeholders of the projects are as follows;
a. Board members
b. Staff members
c. Volunteers
d. Former board and staff members
The external stakeholders of the projects are as follows;
arrangements
The management of the construction industry needs to be responsible and highly cautious
during any kinds of ongoing constructions. The developer of the construction project has an
increased responsibility. The responsibility comes from the fact that the person has to
maintain different perspectives of the new construction site. The arrangements to inform and
consult means that there is an ongoing communication process between the employer and the
employees. The different methods of informing the people affected by the work performance
includes the likes of;
a. Verbal Communication process
b. Meetings and conferences
c. Notices
d. Electronic communication
1.3 List the types of people, internal and external to the project, who could be affected
by work relevant to typical projects.
The internal stakeholders of the projects are as follows;
a. Board members
b. Staff members
c. Volunteers
d. Former board and staff members
The external stakeholders of the projects are as follows;
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

a. Clients of the company
b. Leaders from public and private sectors
c. Partners of the different communities involved in the project
d. Non company members
1.4 Describe the consequences of providing inadequate information to those affected by
the work.
The absence of a proper and adequate information in the project process can be
seriously problematic for the organization. The absence of information in case of the
engineering or construction projects can be really too much harmful. The different
consequences for providing inadequate information requires the likes of the;
a. The project may be underestimated and constructed in an improper manner
b. The absence of proper communication will surely escalate the costs of the project
c. The absence of proper and effective communication can lead to the failure of the
project as the project will not be able to achieve its objectives
2.2 Explain different methods and techniques of agreeing programmes and methods of
work with those who will be carrying out the work.
The methods that helps to create a proper maintenance and carrying out of the works
includes the likes of;
a. Proper communication
b. Proper link ups
c. Proper use of technology
d. Implementation of the proper strategy at the proper time
b. Leaders from public and private sectors
c. Partners of the different communities involved in the project
d. Non company members
1.4 Describe the consequences of providing inadequate information to those affected by
the work.
The absence of a proper and adequate information in the project process can be
seriously problematic for the organization. The absence of information in case of the
engineering or construction projects can be really too much harmful. The different
consequences for providing inadequate information requires the likes of the;
a. The project may be underestimated and constructed in an improper manner
b. The absence of proper communication will surely escalate the costs of the project
c. The absence of proper and effective communication can lead to the failure of the
project as the project will not be able to achieve its objectives
2.2 Explain different methods and techniques of agreeing programmes and methods of
work with those who will be carrying out the work.
The methods that helps to create a proper maintenance and carrying out of the works
includes the likes of;
a. Proper communication
b. Proper link ups
c. Proper use of technology
d. Implementation of the proper strategy at the proper time

3.2 Explain the methods of organising and co-ordinating work with other activities/
operations.
The methods and organization of coordinating the works with the other activities and
operations includes the likes of the;
a. Management control
b. Coordination of the employees
c. Administrative controls
d. Proper form of business evaluations
4.2 Describe ways of identifying and obtaining required resources for the project.
The best ways to identify and obtain the required resources for the project are as
follows;
a. Identification of the needs and purpose of the work
b. Planning different requirements in advance
c. Confirmation of the availability of the different resources
d. Identification and checking of the skills
e. Monitoring the process of the identification of the skills
4.3 Explain methods of planning for resources, in relation to: -people -tools -plant and
ancillary equipment -materials and components -information
The methods for the planning of the resources are as follows;
a. People- The people of the organization needs to be informed in a proper and efficient
manner about the details of the project and the planning as well as the characteristics
of the project.
b. Tools- The tools of the project needs to be identified by the project management.
operations.
The methods and organization of coordinating the works with the other activities and
operations includes the likes of the;
a. Management control
b. Coordination of the employees
c. Administrative controls
d. Proper form of business evaluations
4.2 Describe ways of identifying and obtaining required resources for the project.
The best ways to identify and obtain the required resources for the project are as
follows;
a. Identification of the needs and purpose of the work
b. Planning different requirements in advance
c. Confirmation of the availability of the different resources
d. Identification and checking of the skills
e. Monitoring the process of the identification of the skills
4.3 Explain methods of planning for resources, in relation to: -people -tools -plant and
ancillary equipment -materials and components -information
The methods for the planning of the resources are as follows;
a. People- The people of the organization needs to be informed in a proper and efficient
manner about the details of the project and the planning as well as the characteristics
of the project.
b. Tools- The tools of the project needs to be identified by the project management.
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

c. Plant and Ancillary equipment- The plants and ancillary equipment’s must be
assembled before the start of the project.
d. Materials and components- The materials and components of the projects needs to be
identified as well as assembled in the proper manner to answer the issues of the
organization.
e. Information- The information needs to be shared to all the parties involved in the
project.
5.2 Explain different ways of controlling the workplace and resources to create and
maintain safe conditions and a tidy workplace. Quals Direct Knowledge Task
Generated on 18/07/2019 Page 1 of 2
The main perspectives for the management and maintenance of the workplace
includes the likes of the;
a. Control of the facilities to present a good working environment
b. Controlling the employees in the workplace in an efficient manner
c. Presenting a safe and maintenance of the environment
5.3 Explain how a safe and tidy workplace creates a favourable image of the
organisation, its products and services, and the project.
The presence of a clean workplace is important for the business organization as
because,
a. The presence of happy employees ensures that they are equally successful in nature
b. Happiness helps to improve the performance of the business employees
c. Reduction of stress helps in the increase of the business productivity
d. Positive work environment encourages risk taking
assembled before the start of the project.
d. Materials and components- The materials and components of the projects needs to be
identified as well as assembled in the proper manner to answer the issues of the
organization.
e. Information- The information needs to be shared to all the parties involved in the
project.
5.2 Explain different ways of controlling the workplace and resources to create and
maintain safe conditions and a tidy workplace. Quals Direct Knowledge Task
Generated on 18/07/2019 Page 1 of 2
The main perspectives for the management and maintenance of the workplace
includes the likes of the;
a. Control of the facilities to present a good working environment
b. Controlling the employees in the workplace in an efficient manner
c. Presenting a safe and maintenance of the environment
5.3 Explain how a safe and tidy workplace creates a favourable image of the
organisation, its products and services, and the project.
The presence of a clean workplace is important for the business organization as
because,
a. The presence of happy employees ensures that they are equally successful in nature
b. Happiness helps to improve the performance of the business employees
c. Reduction of stress helps in the increase of the business productivity
d. Positive work environment encourages risk taking
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

6.4 Explain different ways of identifying what are special considerations.
Special Consideration can be defined as the assessment that is done before the start of
the project to get a knowledge of the assessment paper of the learner with the same level of
standards and requirements of the assessment process.
6.5 Describe the methods of recording special considerations.
The records of meeting the special considerations is an important process that needs
to be conducted by the management of the construction companies. It is important for the
organization to ensure the best processes in order to make the most of the construction
project. The special constructions are recorded through the use of the legally enforceable
agreements in between the developers and the employees of the organization.
6.6 Explain ways information on special considerations can be passed on to the people
affected.
The special consideration is a unique case as the people can be affected by means of
the different kinds of the processes related to the changes in the construction industry. The
people can be informed through special ways like social media communication and other
special communication processes available to the management of the organizations.
7.3 Explain the methods and techniques used for passing on information about the work
area layout to people working in the workplace.
The methods and the techniques that are used for the passing of the information
requires the presence of a great management that can be essential for creation of the best
trained employees. Some of the best methods and techniques used for the passage of
information includes the likes of;
a. Traditional as well as contemporary training methods
Special Consideration can be defined as the assessment that is done before the start of
the project to get a knowledge of the assessment paper of the learner with the same level of
standards and requirements of the assessment process.
6.5 Describe the methods of recording special considerations.
The records of meeting the special considerations is an important process that needs
to be conducted by the management of the construction companies. It is important for the
organization to ensure the best processes in order to make the most of the construction
project. The special constructions are recorded through the use of the legally enforceable
agreements in between the developers and the employees of the organization.
6.6 Explain ways information on special considerations can be passed on to the people
affected.
The special consideration is a unique case as the people can be affected by means of
the different kinds of the processes related to the changes in the construction industry. The
people can be informed through special ways like social media communication and other
special communication processes available to the management of the organizations.
7.3 Explain the methods and techniques used for passing on information about the work
area layout to people working in the workplace.
The methods and the techniques that are used for the passing of the information
requires the presence of a great management that can be essential for creation of the best
trained employees. Some of the best methods and techniques used for the passage of
information includes the likes of;
a. Traditional as well as contemporary training methods

b. On the job training
c. Training of electronic communication
d. A feedback process
7.4 Explain different ways of organising/ arranging the work area layout for operational
purposes.
The organization and planning of the work design is one of the most important
components of the overall operations of the business organizations. In case of the
construction industries it is equally important for the business organization to prepare a work
layout for maintaining the smooth layout for the operational purposes of the business. The
different ways that can address the organization and arrangement values can be helpful for
the layout of the area. Some of the ways are as follows;
a. The ease of the future expansion or changes
b. The movement of the goods
c. Handling of the different products and services
d. Utilization of the available space and the resources
e. The use of the best forms of communication process
f. Impact of the morale of the employees on job satisfaction
8.3 Explain the factors, methods and considerations needed to organise the efficient
storage and use of materials and components.
It is important for the organization to understand the purpose of the efficient use and
storage of the materials as well as the different kinds of the equipment’s. The material
requirements planning helps in the process of proper synchronization of the material flow in a
systematic process. The MRP process helps to combine and highlight the elements like that
of;
c. Training of electronic communication
d. A feedback process
7.4 Explain different ways of organising/ arranging the work area layout for operational
purposes.
The organization and planning of the work design is one of the most important
components of the overall operations of the business organizations. In case of the
construction industries it is equally important for the business organization to prepare a work
layout for maintaining the smooth layout for the operational purposes of the business. The
different ways that can address the organization and arrangement values can be helpful for
the layout of the area. Some of the ways are as follows;
a. The ease of the future expansion or changes
b. The movement of the goods
c. Handling of the different products and services
d. Utilization of the available space and the resources
e. The use of the best forms of communication process
f. Impact of the morale of the employees on job satisfaction
8.3 Explain the factors, methods and considerations needed to organise the efficient
storage and use of materials and components.
It is important for the organization to understand the purpose of the efficient use and
storage of the materials as well as the different kinds of the equipment’s. The material
requirements planning helps in the process of proper synchronization of the material flow in a
systematic process. The MRP process helps to combine and highlight the elements like that
of;
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

a. Purchase orders
b. Due dates
c. Materials
d. Inventory
e. Forecasts and
f. Material storages
The processes of the Material Requirements Planning includes the likes of;
a. Identification of the quantity requirements
b. Calculating the MRP process
c. Completion of the orders
b. Due dates
c. Materials
d. Inventory
e. Forecasts and
f. Material storages
The processes of the Material Requirements Planning includes the likes of;
a. Identification of the quantity requirements
b. Calculating the MRP process
c. Completion of the orders
1 out of 7
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.