logo

SRR782 Construction Procurement Assignment

9 Pages3639 Words118 Views
   

Research Methodology (SRR782)

   

Added on  2020-05-28

SRR782 Construction Procurement Assignment

   

Research Methodology (SRR782)

   Added on 2020-05-28

ShareRelated Documents
Running head: 2017 TRI 3 SRR782 ASSIGNMENT 2 TEMPLATEStudent name: _Last name, First nameStudent ID: 1234567Course you are enrolled in: EgMArchTopic: Research methodologies on Construction procurement
SRR782 Construction Procurement Assignment_1
2017 TRI 3 SRR782 ASSIGNMENT 2 TEMPLATE Title: Research methodology on Construction procurementSection 1: Research aim(s), rationale and objectivesIn order to gin success in any construction project the accurate choice for procurement path is very much important that has been identified. The Building Information model (BIM), is a major challenge for the dominant construction industries. BIM helps to investigate over the positive returns on investment on different construction industry. The aim of the project is to implement BIM to increase the speed of aslower process with focused decision making. Over the past three decades, the features of construction industry are changed completely. Different procurements methods those are widely use in the construction industry include management contracting, project management, designing and building. With the continuous growth of various procurement methods most of the researchers have started investigating on these approaches. Basically, the selection is done considering the performance in terms of triple constraints such as cost, time and quality. However, the researchers failed to identify the accurate relationship between the methods of procurements and relevant issues like supply chain, technology with innovation, lean construction, sustainability, build-ability etc. The aim of this research, rationale and objectives are elaborated below. 1.1 The aim of researchThe aim of the research is to understand the role of procurement management in BuildingInformation Model (BIM) in the construction industry. BIM helps to make proper coordination betweenthe public fund and the expected positive return. The construction industry already maintains BIM but itis aiming o develop the existing one with significant procurement process and design as well. Afteranalyzing different real world project it is defined that behind each successful construction projectstrong procurement team had been worked efficiently (Cho and Lee 2014). Based on the details of theproject, the most suitable method of procurement should be selected. Thus, collaboratively the aim ofthe research is to identify the most suitable method of procurement for the construction industry andthe ways through which an absolute procurement method can help a project to move towards successwith reputation, large size, proposal and timelines etc. Therefore, combined aims of the project are as follows:To emphasize the usage of technical methods needed in the construction industryTo endorse a valuable advancement in the construction industry To produce opportunities in the practical ambiance within the existing construction process1.2 Explaining the rationale After analyzing the details of the role of procurement management in the construction industryit has been found that it helps to improve the quality, speed and efficiency of the project with a reducedrate of cost. However, many businesses are also there who avoids the process of procurement methodsas they feel that it slow down the process dramatically by additional paper works. However, inconstruction industry, procurement management is referred to as one of the most important things tobe considered. In almost every construction industry, dedicated procurement team is needed to meet
SRR782 Construction Procurement Assignment_2
2017 TRI 3 SRR782 ASSIGNMENT 2 TEMPLATE the project requirements. The rationale of any project is to hire someone who would define the detailsof contractor’s requirements, suppliers demand and expected budget for the project implementation aswell. 1.3 Overall research objectives The research objectives are as follows:To gain enough productivity considering applicable resourcesTo allocate different resources based upon the construction project To apply all the required resources in appropriate places associated to the project activities To execute a speedy growth with all additional productive employment To increase the rate of productivity with each resource those are applicable in the constructionindustryTo analyze the details of the methods for blasting, creating and developing procurementproceduresSection 2: Research plan for one year of research 2.1 Preparing research plan A construction project would be referred to as successful if it is completed within estimatedbudget and allotted time as well. Other issues that might affect the general flow of the constructionproject include lack of proper communication, uncertainty, sudden change in environment, enhancedproject complexity changing priority and requirements of the consumers should be analyzed accuratelybefore the implementation of the project. It is expected that with the procurement management planthese issues could be minimized easily. While developing research methodology for this particularresearch topic, it is defined that there are some steps those should be identified accurately. In order toconduct the research topic there are certain steps those are required to be organized by the researchersaccurately. Following some steps the research on the topic could be done successfully and outline ofthe research planning are as follows:Development of research questions: In order to develop the research plan at the initial phasethe researcher should develop some research questions. The aim of the researcher is to completelyfocus on research questions. The research work will be considered as a successful one, if the researchersable to answer to all the questions. Select the research associates: In order to implement the research outcome accurately, peoplewho would be associated to the project must be selected. Based on the skills and knowledge of theassociates, the work pressures must be divided among the project team members. Time management of research work: Based upon the research requirements a timeline isneeded to be prepared by the researchers (Dumay and Cai 2015). If proper time division is done thenthe researcher would be able to implement the project successfully within accurate time and estimatedbudget as well. Research skills: The skills of the research associates should be analyzed accurately. It would helpthe researchers to ideate about the research details. Research skills are important things to beconsidered to end up the research work being biased.
SRR782 Construction Procurement Assignment_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Assignment On Determine The Suitability Of Using Bim In Design And Construction Firms
|3
|656
|14

Application of BIM Technology in Construction Risk Management
|17
|7972
|57

Construction Management: Procurement Method Report
|12
|2782
|251

Productive Construction Project.
|6
|1452
|13

Adoption of BIM Within the UK Construction Report 2022
|9
|4309
|31

Impact of Building Information Modeling (BIM) on People Management Processes in Construction SMEs
|11
|3491
|70