logo

7 POINT LIKERT SCALE SURVEY 2.

   

Added on  2022-12-12

6 Pages471 Words81 Views
7 POINT LIKERT SCALE SURVEY 1
7 POINT LIKERT SCALE SURVEY
By (Firstname Lastname)
Course Name
Professor (Tutor)
Name of College
June 20, 2019

7 POINT LIKERT SCALE SURVEY 2
7 Point Likert Scale Survey Questionnaire
Introduction
In marketing research, client satisfaction studies, personality psychology, belief studies, and
many other areas, rating scales including Likert scales and semantine variable scales are
quite popular. Many types of graphical display of findings from research utilizing rating
scales are demonstrated, evaluated and recognised.
These graphical types involve tables, radar, split and ribbon plots, bar, pie, waffle, stacked
and grouped and conventional bar charts. Likert scales lead if participants in the study are
questioned to rate their consensus with survey components on a scale that involves strongly
disagreeing, slightly disagreeing, disagreement, neither agreeing or disagreeing, slightly
agreeing, and strongly agreeing.

7 POINT LIKERT SCALE SURVEY 3
The following table represents the Likert scale for the survey taken on the basis of agreement by the questionnaire ranging from strongly
disagreement to strongly agreement
Strongly Disagree Neither Strongly Agree
Question Disagree
Strongly
1
Disagree
2
Slightly
Disagree
3
Neither
Agree nor
Disagree
4
Slightly
Agree
5
Agree
6
Agree
Strongly
7
1 The engineer informs and talk to you regarding
the jobs to do when the machine going to be
service
x
2 The engineer keeps looking continuously for the
improvement of the machine.
x
3 The engineer advice regarding to the possibility
to gain more training and improve the service
for the users
x
4 The engineer completes the assertive manner
the function of service in the theatres
x
5 The service offer in house increase the quality
of the job in the unit or the job offer is the less
quality than the offered by dragger
x
6 In case of problem of the anaesthetic machine
the engineer is able to sort the problem in the
theatres
x
7 The routine of the inspection ebme engineers
going to do guarantee the good operation of the
x

End of preview

Want to access all the pages? Upload your documents or become a member.