Discussion on project case study
Name of the Student:
Name of the University:
Advanced Project                        Management_1

1PROJECT MANAGEMENT PRACTICES
Contributed to the issues
Many issues are identified for the lecture capture upgrade project conducted by the
Australian University. The project was initiated in the year of 2017 and the main objective of the
project is to upgrade the lecture capturing facilities in the lecture rooms globally or throughout 5
of the campuses and across 160 classrooms. Some of the lecture rooms were remained unlocked
even during the lecture session. Apart from that, the security measures considered for the campus
was not enough tight.
Besides this, the university authority was incapable to inform all the security officers
about how to improve the security of the campus area. Multiple devices were implemented for
successfully upgrading the lecture capture project. However, it is identified that some of the
devices failed to give response on the upgrade codes. In fact some rooms were used only when
the project staffs were arrived. Apart from that, project schedule is the other project knowledge
area which contributed to the issues. The project schedule was negatively impacted because at
the beginning stage the team it will be completed in only 4 days.
Actions can be prevented
There are some remaining actions needed to be taken by the project staffs and supervisor.
Feasibility analysis, cost and time management plan are the different actions to be taken to
mitigate the identified issues. The project team is facing issues with security risks. In order to
mitigate security risks the campus security officer needs to be informed about situations and
activities to be taken. There were some devices those failed to give immediate response on
upgrade codes. Manual intervention is the best suited action that can improve the issue.
Related actions
Advanced Project                        Management_2

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Project Management Practices Report 2022
|9
|1568
|14

Lecture Capture Upgrade Project 2022
|7
|1358
|20

Instructional Feedback Technique
|7
|1416
|22

Journal of Teaching in Physical Education
|7
|1361
|25

Contextual Analysis of Three Construction Cases
|13
|938
|13

Development of Information System for Small Scale Supermarket Assignment 2022
|20
|3544
|18