IT511 Information System Project Management Plan: Ecommerce Project

Verified

Added on  2022/09/14

|17
|761
|14
Project
AI Summary
This project plan addresses the key elements of information systems project management, focusing on the development of an ecommerce website and application. The plan encompasses scope management, detailing the task hierarchy through a Work Breakdown Structure (WBS). Time management is addressed by specifying task durations and sequencing. Human resource management is covered by defining resource needs and associated costs, while cost management planning is illustrated through a Gantt chart showing activity costs. The plan incorporates milestones for each level 1 activity in the WBS, highlights critical tasks on the critical path, and simulates the completion of approximately one-fourth of the project's work. This plan is designed to guide the execution and supervision of the project, ensuring efficient resource allocation, timely completion, and adherence to budget constraints.
Document Page
Running head: PM
Information System Project Management
Name of Student
Name of University
Author Note
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
1PM
Table of Contents
Introduction..........................................................................................................................2
1. Scope Management..........................................................................................................2
2. Time Management...........................................................................................................4
3. Human Resource Management........................................................................................6
4. Cost Management Planning.............................................................................................6
5. The Task Milestones........................................................................................................8
6. Critical Tasks.................................................................................................................10
7. Completed Tasks...........................................................................................................12
Conclusion.........................................................................................................................15
Bibliography......................................................................................................................16
Document Page
2PM
Introduction
A formal document that is mainly prepared to guide and supervise the execution process
of any project is termed as project plan. Four important elements of a project management plan
include the scope management, management of time, management of the human resources and
cost management of a project. A project of website development (ecommerce) and development
of an application for a company is undertaken to discuss the main elements of a project plan. In
the following section, the management of the scope, time, cost and human resource have been
highlighted.
1. Scope Management
The WBS created as the task Hierarchy of the undertaken project is indicated in the table
below-
Document Page
3PM
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
4PM
Figure 1: Showing the Task Hierarchy
2. Time Management
The start date of each task along with their duration is shown in the table below-
Document Page
5PM
Document Page
6PM
Figure 2: Illustrating the duration and the relationship between each Task
3. Human Resource Management
The human resource needs for this undertaken project are indicated in the following
picture-
Figure 3: Illustrating the Resource sheet and their cost
4. Cost Management Planning
The cost of each activities for the undertaken project are represented in the Gantt chart
below-
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
7PM
Document Page
8PM
Figure 4: Representing the Cost of the Project
5. The Task Milestones
The milestones of the task are marked by inserting the “milestone” column in MS
Project-
Document Page
9PM
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
10PM
Figure 5: Representing the Milestones
6. Critical Tasks
The Gantt chart view in the picture below represents the critical tasks of the undertaken
project. The Critical path is auto generated in MS project and is marked in red.
Document Page
11PM