Engineering Project Documentation and Progress
VerifiedAdded on  2020/04/13
|13
|2918
|194
AI Summary
This assignment focuses on documenting and evaluating the progress of various engineering projects. It requires students to provide detailed accounts of their roles and contributions within these projects, highlighting their adherence to professional conduct and effective teamwork. The submission includes specific examples from three distinct career episodes (CE 1, CE 2, and CE 3), showcasing the student's involvement in project design, implementation, material management, reporting, and issue resolution.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
SUMMARY STATEMENT
ELZUBAIR RODWAN ABDELMAJID
ELZUBAIR RODWAN ABDELMAJID
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Professional Engineering: Summary Statement
Competency Element A brief summary of how you
have applied the element
Paragraph number in the
career episode(s) where the
element is addressed
PE 1 KNOWLEDGE AND SKILL BASE
PE1.1 Comprehensive,
theory based
understanding of the
underpinning natural and
physical sciences and the
engineering fundamentals
applicable to the
engineering discipline.
I) This project has been based
on the idea for the development
of a micro air vehicle with
flapping wings for aerial flight
II) I was asked to work for their
company in order to find the
drawbacks in their production
line and for the installation of
new production lines in the
factory floor.
III) I had provided the business
partners with the efficient
amount of training based on the
technical theory.
Career Episode 1: CE 1.2.1, CE
1.3.1 and CE 1.3.2
Career Episode 2: CE 2.3.1 and
CE 2.3.3
Career Episode 3: CE 3.2.1, CE
3.3.1 and CE 3.3.2
Competency Element A brief summary of how you
have applied the element
Paragraph number in the
career episode(s) where the
element is addressed
PE 1 KNOWLEDGE AND SKILL BASE
PE1.1 Comprehensive,
theory based
understanding of the
underpinning natural and
physical sciences and the
engineering fundamentals
applicable to the
engineering discipline.
I) This project has been based
on the idea for the development
of a micro air vehicle with
flapping wings for aerial flight
II) I was asked to work for their
company in order to find the
drawbacks in their production
line and for the installation of
new production lines in the
factory floor.
III) I had provided the business
partners with the efficient
amount of training based on the
technical theory.
Career Episode 1: CE 1.2.1, CE
1.3.1 and CE 1.3.2
Career Episode 2: CE 2.3.1 and
CE 2.3.3
Career Episode 3: CE 3.2.1, CE
3.3.1 and CE 3.3.2
PE1.2 Conceptual
understanding of the
mathematics, numerical
analysis, statistics, and
computer and information
sciences which underpin
the engineering discipline.
I) Based on the study of the
literature of the previously
completed project, I had worked
on the design phase for the
project.
II) I had used my knowledge of
a mechanical engineer, which I
had learned during my bachelor
degree and during my work
experience.
III) I had learnt the working of
the HVAC equipment’s for the
teaching of the business
executives and also used the
process of software training for
the meeting of all the
requirements of the client.
Career Episode 1: CE 1.3.1
Career Episode 2: CE 2.3.2, CE
2.3.3 and CE 2.3.4
Career Episode 3: CE 3.3.2
PE1.3 In-depth
understanding of specialist
bodies of knowledge within
the engineering discipline
I) The mimicking of a two
winged bird or insect would
become impossible as they have
a very hard method of flying. I
found that the use of a clap and
fling method of flight can be
Career Episode 1: CE 1.3.1
understanding of the
mathematics, numerical
analysis, statistics, and
computer and information
sciences which underpin
the engineering discipline.
I) Based on the study of the
literature of the previously
completed project, I had worked
on the design phase for the
project.
II) I had used my knowledge of
a mechanical engineer, which I
had learned during my bachelor
degree and during my work
experience.
III) I had learnt the working of
the HVAC equipment’s for the
teaching of the business
executives and also used the
process of software training for
the meeting of all the
requirements of the client.
Career Episode 1: CE 1.3.1
Career Episode 2: CE 2.3.2, CE
2.3.3 and CE 2.3.4
Career Episode 3: CE 3.3.2
PE1.3 In-depth
understanding of specialist
bodies of knowledge within
the engineering discipline
I) The mimicking of a two
winged bird or insect would
become impossible as they have
a very hard method of flying. I
found that the use of a clap and
fling method of flight can be
Career Episode 1: CE 1.3.1
useful for the designing of the
vehicle.
II) The feasibility study of the
new machines and parts were
shared with my managers to
make them understand as to
what extent changes needed to
be carried out.
III) I had completed a research
based on the requirements of the
training module and produced
notes and distributable
pamphlets for the training of the
business partners.
Career Episode 2: CE 2.3.1, CE
2.3.4, CE 2.2.5 and CE 2.4.2
Career Episode 3: CE 3.3.1,
CE 3.3.3
PE1.4 Discernment of
knowledge development
and research directions
within the engineering
discipline
I) I had worked on the process
of developing the designing of
the complete vehicle.
II) The research had delayed the
working of the project by quiet a
lot of time. The requisition had
to be cleared out by the
managers of the company before
proceeding with the placing of
Career Episode 1: CE 1.2.5,
CE 1.3.1 and CE 1.4.2
Career Episode 2: CE 2.3.2,
CE 2.3.4 and CE 2.4.1
vehicle.
II) The feasibility study of the
new machines and parts were
shared with my managers to
make them understand as to
what extent changes needed to
be carried out.
III) I had completed a research
based on the requirements of the
training module and produced
notes and distributable
pamphlets for the training of the
business partners.
Career Episode 2: CE 2.3.1, CE
2.3.4, CE 2.2.5 and CE 2.4.2
Career Episode 3: CE 3.3.1,
CE 3.3.3
PE1.4 Discernment of
knowledge development
and research directions
within the engineering
discipline
I) I had worked on the process
of developing the designing of
the complete vehicle.
II) The research had delayed the
working of the project by quiet a
lot of time. The requisition had
to be cleared out by the
managers of the company before
proceeding with the placing of
Career Episode 1: CE 1.2.5,
CE 1.3.1 and CE 1.4.2
Career Episode 2: CE 2.3.2,
CE 2.3.4 and CE 2.4.1
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
the order of the products.
III) I had learnt the working of
the HVAC equipment’s for the
teaching of the business
executives and also used the
process of software training for
the meeting of all the
requirements of the client.
Career Episode 3: CE 3.3.2, CE
3.3.3 and CE 3.4.1
PE1.5 Knowledge of
contextual factors
impacting the engineering
discipline.
I) During our research on the
process to follow for the
development of this project, I
had come across many other
completed MAVs implemented
by others. The research helped
in the better understanding of
the process to follow for this
project.
II) The major objectives, which
were followed by me, were to
increase the number of
production lines in the company
and to increase the amount of
production per day on the
Career Episode 1: CE 1.2.1, CE
1.2.2,
Career Episode 2: CE 2.2.1, CE
2.2.2
III) I had learnt the working of
the HVAC equipment’s for the
teaching of the business
executives and also used the
process of software training for
the meeting of all the
requirements of the client.
Career Episode 3: CE 3.3.2, CE
3.3.3 and CE 3.4.1
PE1.5 Knowledge of
contextual factors
impacting the engineering
discipline.
I) During our research on the
process to follow for the
development of this project, I
had come across many other
completed MAVs implemented
by others. The research helped
in the better understanding of
the process to follow for this
project.
II) The major objectives, which
were followed by me, were to
increase the number of
production lines in the company
and to increase the amount of
production per day on the
Career Episode 1: CE 1.2.1, CE
1.2.2,
Career Episode 2: CE 2.2.1, CE
2.2.2
existing systems.
III) For the completion of the
project I had worked for
providing the technical training
to the individuals of the
Dunham-Bush business partners
for the HVAC products being
developed by the company.
Career Episode 3: CE 3.2.1,
CE 3.2.3
PE1.6 Understanding of
the scope, principles,
norms, accountabilities
and bounds of
contemporary engineering
practice in the specific
discipline
I) The designing was crucial for
the project as it needed to be as
light as possible so that the
vehicle can fly with the help of
the wind force applied from the
wings of the vehicle.
II) I had worked on the process
of development of new
production lines and
improvement of the existing
production lines in the factory.
III) I was also asked to manage
the relationships with the
business partners from the
Middle East and North Africa
Career Episode 1: CE 1.2.3, CE
1.3.3, CE 1.3.4 and CE 1.3.2
Career Episode 2: CE 2.2.3, CE
2.3.1 and CE 2.3.2
Career Episode 3: CE 3.2.3, CE
3.3.1 and CE 3.3.2
III) For the completion of the
project I had worked for
providing the technical training
to the individuals of the
Dunham-Bush business partners
for the HVAC products being
developed by the company.
Career Episode 3: CE 3.2.1,
CE 3.2.3
PE1.6 Understanding of
the scope, principles,
norms, accountabilities
and bounds of
contemporary engineering
practice in the specific
discipline
I) The designing was crucial for
the project as it needed to be as
light as possible so that the
vehicle can fly with the help of
the wind force applied from the
wings of the vehicle.
II) I had worked on the process
of development of new
production lines and
improvement of the existing
production lines in the factory.
III) I was also asked to manage
the relationships with the
business partners from the
Middle East and North Africa
Career Episode 1: CE 1.2.3, CE
1.3.3, CE 1.3.4 and CE 1.3.2
Career Episode 2: CE 2.2.3, CE
2.3.1 and CE 2.3.2
Career Episode 3: CE 3.2.3, CE
3.3.1 and CE 3.3.2
regions, for the ensuring that the
contract between them was met
with regards to the margin and
the revenue for the program
PE 2 ENGINEERING APPLICATION ABILITY
PE2.1 Application of
established engineering
methods to complex
engineering problem
solving
I) I researched on the use of
different materials based on
their weight and would also be
durable for sustaining in flight.
II) The feasibility study of the
new machines and parts were
shared with my managers to
make them understand as to
what extent changes needed to
be carried out.
III) I had then coordinated the
working with the factory for
looking after the queries and the
input data for the logistics
system.
Career Episode 1: CE 1.2.4,
CE 1.3.1 and CE 1.4.2
Career Episode 2: CE 2.3.3,
CE 2.3.4 and CE 2.4.1, CE
2.4.2
Career Episode 3: CE 3.3.1, CE
3.3.2 and CE 3.4.2
PE2.2 Fluent application of
engineering techniques,
I) For the project designing form
I had divided the work in the
Career Episode 1: CE 1.3.3, CE
contract between them was met
with regards to the margin and
the revenue for the program
PE 2 ENGINEERING APPLICATION ABILITY
PE2.1 Application of
established engineering
methods to complex
engineering problem
solving
I) I researched on the use of
different materials based on
their weight and would also be
durable for sustaining in flight.
II) The feasibility study of the
new machines and parts were
shared with my managers to
make them understand as to
what extent changes needed to
be carried out.
III) I had then coordinated the
working with the factory for
looking after the queries and the
input data for the logistics
system.
Career Episode 1: CE 1.2.4,
CE 1.3.1 and CE 1.4.2
Career Episode 2: CE 2.3.3,
CE 2.3.4 and CE 2.4.1, CE
2.4.2
Career Episode 3: CE 3.3.1, CE
3.3.2 and CE 3.4.2
PE2.2 Fluent application of
engineering techniques,
I) For the project designing form
I had divided the work in the
Career Episode 1: CE 1.3.3, CE
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
tools and resources. following parts: Body, Wings
and Tail, Hinge, Drive Train,
Battery, Motor, Actuators and
Receiver, Transmitter, and
Microcontroller.
II) I had worked with my team
members for the completion of
the project work within the
timeline as well as keeping the
project within the budget
provided by the client.
III) I had completed a research
based on the requirements of the
training module and produced
notes and distributable
pamphlets for the training of the
business partners.
1.3.2 and CE 1.3.1
Career Episode 2: CE 2.3.1, CE
2.3.2 and CE 2.3.3
Career Episode 3: CE 3.3.1, CE
3.3.2 and CE 3.3.3
PE2.3 Application of
systematic engineering
synthesis and design
processes.
I) The major portion was the
designing was to work on the
transmitter and receiver section
of the vehicle for the controlling
of the device while in flight
II) I had to make the managers
Career Episode 1: CE 1.2.3, CE
1.3.1 and CE 1.3.2
Career Episode 2: CE 2.3.3 and
and Tail, Hinge, Drive Train,
Battery, Motor, Actuators and
Receiver, Transmitter, and
Microcontroller.
II) I had worked with my team
members for the completion of
the project work within the
timeline as well as keeping the
project within the budget
provided by the client.
III) I had completed a research
based on the requirements of the
training module and produced
notes and distributable
pamphlets for the training of the
business partners.
1.3.2 and CE 1.3.1
Career Episode 2: CE 2.3.1, CE
2.3.2 and CE 2.3.3
Career Episode 3: CE 3.3.1, CE
3.3.2 and CE 3.3.3
PE2.3 Application of
systematic engineering
synthesis and design
processes.
I) The major portion was the
designing was to work on the
transmitter and receiver section
of the vehicle for the controlling
of the device while in flight
II) I had to make the managers
Career Episode 1: CE 1.2.3, CE
1.3.1 and CE 1.3.2
Career Episode 2: CE 2.3.3 and
understand the benefits of using
such materials and they were
ready to use the requested
products.
III) I had analysed the
preparation of the project
procedure for the writing of the
final technical bids.
CE 2.3.4
Career Episode 3: CE 3.2.5
PE2.4 Application of
systematic approaches to
the conduct and
management of
engineering projects
I) I also had to work on the
thinking of the financial budget
for making the vehicle of low
cost.
II) I had helped in the breaking
down of the work for the
technicians and the monitoring
of the job status of the workers.
III) Based on the requirement
for the client I had planned out
the complete training profile to
be taught to the Dunham-Bush
business partners.
Career Episode 1: CE 1.3.1 and
CE 1.3.2
Career Episode 2: CE 2.2.3, CE
2.3.1, CE 2.3.2 and CE 2.3.3
Career Episode 3: CE 3.3.1 and
CE 3.3.2
PE 3 PROFESSIONAL AND PERSONAL ATTRIBUTES
such materials and they were
ready to use the requested
products.
III) I had analysed the
preparation of the project
procedure for the writing of the
final technical bids.
CE 2.3.4
Career Episode 3: CE 3.2.5
PE2.4 Application of
systematic approaches to
the conduct and
management of
engineering projects
I) I also had to work on the
thinking of the financial budget
for making the vehicle of low
cost.
II) I had helped in the breaking
down of the work for the
technicians and the monitoring
of the job status of the workers.
III) Based on the requirement
for the client I had planned out
the complete training profile to
be taught to the Dunham-Bush
business partners.
Career Episode 1: CE 1.3.1 and
CE 1.3.2
Career Episode 2: CE 2.2.3, CE
2.3.1, CE 2.3.2 and CE 2.3.3
Career Episode 3: CE 3.3.1 and
CE 3.3.2
PE 3 PROFESSIONAL AND PERSONAL ATTRIBUTES
PE3.1 Ethical conduct and
professional Accountability
I) The materials were tested for
the weight which they would be
putting in on the vehicle and
then considered to be used in the
project.
II) I had also raised the
corrective action planning for
the report based on the
breakdown of the work.
III) Once I was able to assess the
amount of work that I had been
assigned with I had worked for
the development of the training
plan for the project.
Career Episode 1: CE 1.2.3, CE
1.3.3 and CE 1.4.1
Career Episode 2: CE 2.2.3, CE
2.3.5 and CE 2.4.2
Career Episode 3: CE 3.3.3, CE
3.4
PE3.2 Effective oral and
written communication in
professional and lay
domains
I) The design process of the
project was followed as per the
research and the theory gathered
from the study of the previous
projects.
II) I had taken care of the follow
up of the parts in the stock of the
warehouse and the purchase
requisitions.
Career Episode 1: CE 1.2.3, CE
1.3.3 and CE 1.4.1
Career Episode 2: CE 2.2.3, CE
2.3.5 and CE 2.4.2
professional Accountability
I) The materials were tested for
the weight which they would be
putting in on the vehicle and
then considered to be used in the
project.
II) I had also raised the
corrective action planning for
the report based on the
breakdown of the work.
III) Once I was able to assess the
amount of work that I had been
assigned with I had worked for
the development of the training
plan for the project.
Career Episode 1: CE 1.2.3, CE
1.3.3 and CE 1.4.1
Career Episode 2: CE 2.2.3, CE
2.3.5 and CE 2.4.2
Career Episode 3: CE 3.3.3, CE
3.4
PE3.2 Effective oral and
written communication in
professional and lay
domains
I) The design process of the
project was followed as per the
research and the theory gathered
from the study of the previous
projects.
II) I had taken care of the follow
up of the parts in the stock of the
warehouse and the purchase
requisitions.
Career Episode 1: CE 1.2.3, CE
1.3.3 and CE 1.4.1
Career Episode 2: CE 2.2.3, CE
2.3.5 and CE 2.4.2
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
III) I then looked after the
working of the logistics of the
project
Career Episode 3: CE 3.3.3, CE
3.4
PE3.3 Creative, innovative
and pro-active demeanor
I) I had worked with my team
for the timely completion of the
project with in the deadline.
II) I had studied the old
production lines for adding the
new improvement for the
increase in the quality as well as
the speed of the production line.
III) I had requested my
managers to arrange for me a
software where I will be able to
keep a track of all the equipment
and materials being requested.
Career Episode 1: CE 1.3, CE
1.4 and CE 1.4.2
Career Episode 2: CE 2.3.5, CE
2.4, CE 2.2.5 and CE 2.4.2
Career Episode 3: CE 3.2, CE
3.3
PE3.4 Professional use and
management of
information
I) The major portion was the
designing was to work on the
transmitter and receiver section
of the vehicle for the controlling
of the device while in flight.
II) I had helped in the breaking
down of the work for the
Career Episode 1: CE 1.2.3, CE
1.2.5, CE 1.4.2
Career Episode 2: CE 2.2.3, CE
working of the logistics of the
project
Career Episode 3: CE 3.3.3, CE
3.4
PE3.3 Creative, innovative
and pro-active demeanor
I) I had worked with my team
for the timely completion of the
project with in the deadline.
II) I had studied the old
production lines for adding the
new improvement for the
increase in the quality as well as
the speed of the production line.
III) I had requested my
managers to arrange for me a
software where I will be able to
keep a track of all the equipment
and materials being requested.
Career Episode 1: CE 1.3, CE
1.4 and CE 1.4.2
Career Episode 2: CE 2.3.5, CE
2.4, CE 2.2.5 and CE 2.4.2
Career Episode 3: CE 3.2, CE
3.3
PE3.4 Professional use and
management of
information
I) The major portion was the
designing was to work on the
transmitter and receiver section
of the vehicle for the controlling
of the device while in flight.
II) I had helped in the breaking
down of the work for the
Career Episode 1: CE 1.2.3, CE
1.2.5, CE 1.4.2
Career Episode 2: CE 2.2.3, CE
technicians and the monitoring
of the job status of the workers.
III) I had also taken care for the
preparation of the reports for the
management of the open jobs on
a weekly basis.
2.2.5, CE 2.4.2
Career Episode 3: CE 3.2.3, CE
3.2.5, CE 3.4.2
PE3.5 Orderly
management of self and
professional conduct
I) We were able to complete the
project of designing and
implementing a flapping winged
bird with the capability of
vertical take-off as well as keep
the vehicle in flight.
II) I had helped in keeping track
of the material requisitions
placed for the project. I had
worked with my team members
for the completion of the project
on time.
III) I also looked after all the
issues of the company to resolve
them in less amount of time.
Career Episode 1: CE 1.4.1, CE
1.3.1 and CE 1.3.2
Career Episode 2: CE 2.4.2, CE
2.3.2, CE 2.3.3 and CE 2.3.4
Career Episode 3: CE 3.4.2, CE
3.3.1 and CE 3.3.2
PE3.6 Effective team
membership and team
I) I worked on the project
documentation to compile all the
Career Episode 1: CE 1.4.1, CE
of the job status of the workers.
III) I had also taken care for the
preparation of the reports for the
management of the open jobs on
a weekly basis.
2.2.5, CE 2.4.2
Career Episode 3: CE 3.2.3, CE
3.2.5, CE 3.4.2
PE3.5 Orderly
management of self and
professional conduct
I) We were able to complete the
project of designing and
implementing a flapping winged
bird with the capability of
vertical take-off as well as keep
the vehicle in flight.
II) I had helped in keeping track
of the material requisitions
placed for the project. I had
worked with my team members
for the completion of the project
on time.
III) I also looked after all the
issues of the company to resolve
them in less amount of time.
Career Episode 1: CE 1.4.1, CE
1.3.1 and CE 1.3.2
Career Episode 2: CE 2.4.2, CE
2.3.2, CE 2.3.3 and CE 2.3.4
Career Episode 3: CE 3.4.2, CE
3.3.1 and CE 3.3.2
PE3.6 Effective team
membership and team
I) I worked on the project
documentation to compile all the
Career Episode 1: CE 1.4.1, CE
leadership working materials and the
research which we had
conducted for the development
of this project.
II) I found that the purchasing of
the new equipment has allowed
the company to increase its
production in terms of quantity
as well as production rate.
III) I had taken care of the
writing of the progress report for
the manager to follow the
training progress and the work I
was doing for the company.
1.4.2
Career Episode 2: CE 2.4.1 and
CE 2.4.2
Career Episode 3: CE 3.4.1 and
CE 3.4.2
research which we had
conducted for the development
of this project.
II) I found that the purchasing of
the new equipment has allowed
the company to increase its
production in terms of quantity
as well as production rate.
III) I had taken care of the
writing of the progress report for
the manager to follow the
training progress and the work I
was doing for the company.
1.4.2
Career Episode 2: CE 2.4.1 and
CE 2.4.2
Career Episode 3: CE 3.4.1 and
CE 3.4.2
1 out of 13
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
 +13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024  |  Zucol Services PVT LTD  |  All rights reserved.