Abstract
This report is based on system analysis and design of Toys management system. The below
assignment covers the introduction of this project, time management plan, TO-BE process,
Comparing “As IS” and “TO-BE” process, suggesting a network, software testing, training
and system change over. After completing this project, a person can get a complete idea of
system design and analysis of Toys management system.
Toys Management       System_2

SYSTEMS ANALYSIS AND DESIGN
2
Table of Contents
Introduction:...............................................................................................................................3
Time Management Plan including WBS....................................................................................3
TO-BE process:..........................................................................................................................6
Comparing “AS IS” and “TO BE” Process................................................................................6
Physical and Logical Network...................................................................................................7
Testing:.......................................................................................................................................7
Training:.....................................................................................................................................7
System Changeover....................................................................................................................8
Report to Top Management.......................................................................................................8
Conclusion:................................................................................................................................8
Bibliography:..............................................................................................................................9
Toys Management       System_3

SYSTEMS ANALYSIS AND DESIGN
3
Introduction:
Mr. and Mrs. Toys want to implement an information system that can automate many
works. The old system is manual-based; to increase the work efficiency, they are
implementing a new system. In this report, the system analysis and design of this system are
defined. In the existing system, a staff member named Janice taking phone calls and note
down every customer information. After getting information, Janice searches for a product
and pack the merchandise and sends it to the customer. The new system will automate this
process and eliminate the challenges. This report can produce a detailed overview of the
organization’s project plan. The time management plan can describe how much time is
required to complete tasks within a development phase. WBS can produce the work break
down the structure of projects. To-BE process can provide a work process that can be
happened when the project development is completed. The comparison of AS IS and TO BE
is provided in this report. The network is one of the essential parts of this project. Most of the
time, this system will be dependent on the net. Network security is one of the important
aspects of these projects. Different testing method and the employee training process is
described in this project. System changeover can increase the productivity of the
organization.
Time Management Plan including WBS
The work break down the structure of this projects is provided below:
Toys Management       System_4

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Toys Business in 2008 at Toowoomba
|12
|1640
|8

Project Management of DAD Project
|12
|1152
|263

System Analysis and Design for Toyota Cars - SAP Implementation
|21
|3687
|228

CIS2000 Systems Analysis and Design Assignment
|14
|2443
|129

Project Management Project Management 22 Project Management: Victoria Construction Pty Ltd
|24
|2591
|319

Assignment on Design and Implementation
|15
|2862
|58