1 Question 1
1.1 Part A
Builders Licence 444412
ABN: 1415161718
M: 123568989
Email: jonhs@xyzconstruction.com.au
Dear All;
It is with deep pleasure to inform you that XYZ construction company has been awarded
contract on Strathfield Apartments. The project is scheduled to take 12 months and the
commencing date shall be 13th Jan, 2014, effective completion date scheduled on 12th Dec,
2014.
A kick off meeting is scheduled on Friday 11th Jan, 2014 at 9:00 am at XYZ boardroom. In
this regard, the following personnel shall be required to attend the meeting without failure.
Name Company
Frank Lampard XYZ construction
John Kerry XYZ construction
Beddy J. EEE electrical.
Jezzy W Twin Plumbers
T. Mountain APM concrete
S. Twain Sure contractors
Trade Contract Sum Complete Claim_2
CPCCBC5010B: Assessment 6
In addition to this, site meetings are scheduled as per the table below. Kindly note that site
meetings shall be held 8 am each Monday.
Serial No. Agenda Responsible Status Special Remarks
1 Safety meeting
1.1 Induction JM open
1.2 Risk Assessment JK open
2 Program
2.1 Updates
2.2 Delays
2.3 EOT’s
3 Construction
3.1 Updates
3.2 Compliance
3.3 Authority update
4 Correspondence
4.1 Subcontractors
4.2 Consultants
7 Any other business
XYZ would like to give special thanks to all members and therefore, we expect total
cooperation until the end of project.
Regards,
John K,
XYZ construction contracts manager
Trade Contract Sum Complete Claim_3
CPCCBC5010B: Assessment 6
2 Question 2
2.1 Part A- First aid requirement
XYZ cares for life of workers on site. The company is working to ensure that there are zero
incidences at the construction site. The company has a dedicated WHS manager who works
on site fulltime. The company plans to employ 40-50 workers on the site each day on
Strathfield Apartment project. The company intends to employ 3 trained and experienced first
aiders on site who shall uphold Safe Work Australia guidelines in conjunction with Work
Health Safety Act.
As per Safe Work Australia, it is a requirement to employ at least one first aid for every 50
works in areas which are termed as low-risk such as offices, for 25 workers in workplaces
that are considered as high risk such as construction sites, and for 10 workers in workplaces
that are remote and have a high risk, such as mine site.
The XYZ company will be in close consultation with the QHSE manager in matters regarding
subcontractors and employees in regard to safety matters. The manager shall identify all
hazards related to any task, assess the possibility and risk, provide necessary trainings and
safety induction and revise the requirement depending with the situation at hand.
All records related to subcontractors and employees shall be kept by the site manager. The
Health Records Act dictates that the records should include;
a. Name and job title of the worker
b. Date and time of when he or she was injured
c. Location
d. Situation description
e. Witnesses
f. Body part that was injured
Trade Contract Sum Complete Claim_4

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Managing Construction Work: Site Meetings, First Aid, Materials, Payment
|16
|2575
|146

Construction Site Regulations: Codes and Regulations to be Observed
|10
|745
|334

AKM Developments Limited Construction Checklist
|7
|763
|168

CPCCBC5005A- Institutional Affiliation in Subcontractors
|21
|3797
|12

Site Inspection Report for WHS Management Plan Assessment
|15
|2909
|54

Assessment 6: Civil Engineering Project
|14
|2360
|225