Running head: CASE STUDY OF ROYALE PIZZA
Case Study of Royale Pizza
Name of the Student
Name of the University
Author Note
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
1CASE STUDY OF ROYALE PIZZA
Executive Summary
The following paper analyses the given case study on Royale Pizza and provides a brief scope
statement on the renovation project. The concept of SMART goal has been implemented in order
to provide a set of achievable and relevant goals. In addition to that, a detailed discussion on the
project methodologies has also been emphasized throughout the paper.
Document Page
2CASE STUDY OF ROYALE PIZZA
Table of Contents
Project Scope Statement......................................................................................................3
Project delivery methodologies...........................................................................................6
Task schedule for the project...........................................................................................8
Project delivery life cycle....................................................................................................9
The initiation phase..........................................................................................................9
The planning phase..........................................................................................................9
The execution phase........................................................................................................9
The closure phase..........................................................................................................10
SMART Goals...................................................................................................................10
Specific..........................................................................................................................10
Measure..........................................................................................................................10
Attainability...................................................................................................................10
Realistic.........................................................................................................................11
Time...............................................................................................................................11
Precedence diagram...................................................................................................12
Conclusion.........................................................................................................................12
References..........................................................................................................................14
Document Page
3CASE STUDY OF ROYALE PIZZA
Project Scope Statement
Scope Description
In order to enhance the company’s profitability by increasing its annual sales, Royale
Pizza has proposed an internal renovation project. Royale pizza is a pizza company that was
established in the year 2007 and now it delivers around 40 different types of classic and
gourmet pizzas. The renovation project involves buying new equipment in order to completely
reconstruct the pizza shop which will help the company to expand its businesses (Ahern,
Leavy and Byrne 2014). Furthermore, SMART goal concept and case study information can
be used to list the specifics of the project requirements that comprises of the following:
Installation of air conditioning systems
Flooring
Increasing the capacity of the compressor
Dust free painting
Point of Sale (POS) system with required hardware and software configurations installed.
A thorough cleaning of the kitchen’s exhaust system
3 deep fryers
2 boilers
2 chairs
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
4CASE STUDY OF ROYALE PIZZA
2 portable tables
One dough roller
Point of Sale (POS) system with required hardware and software configurations installed.
Project Deliverables
The renovation project of Royale Pizza is estimated to bring around 25% hike in the
company profitability. In addition to that, the main purpose of this project is to increase the
business boundaries of the company. Royale pizza has decided to serve not only pizzas but
several other types of foods as well, that includes pastas and chips. Furthermore, the
measuring aspect of SMART goal concept can be used to take suggestive inputs from the
customers regarding their preferable foods. There are several tools and techniques can be used
for the potential measurement of this aspect (Crawford 2014). The deliverables of this project
comprises of the following services:
Reconstruction of the shop
Procurement
Sourcing
Successful installation of new equipments
The proper implementation of these deliverables will have a huge positive impact on
the company’s economy graph. 25% is the estimated profit percentage that may get exceeded
further with the proper incorporation of the required systems. Also, with the renovation project
a reconstructed mainframe can be attained which will serve more than one type of food to its
customers. Using the concepts of SMART goal, almost all the deliverables of the renovation
project are attainable. Therefore, the stakeholders have to be completely ensured about the
Document Page
5CASE STUDY OF ROYALE PIZZA
project.
Project Acceptance Criteria
Although the deliverables of the project are pretty clear, there are certain criteria that
are needed to be fulfilled in order to achieve the goals (Harrison and Lock 2017). Without
fulfilling the acceptance criteria, achieving a successful completion of the renovation project is
not possible. One of the prime acceptance criteria that is needed to be followed is that the
equipment installation has to be done after the completion of construction processes. Since
more space is required in terms of food preparation the rear stairs of the shop must be
removed.
Project Exclusions
It is to be noted that the renovation project does not include any kind of reconstruction
in the company’s refund policies (Hák Janoušková and Moldan 2016). This is one aspect that
the company needs to work on in the near future. The billing of the shop has a poor refund
system as it involves refunds in coupon forms that may create huge complexities for the
customers later.
Project Constraints
As raised by the technical manager during the first meeting with the company owners,
one of the prime constraints of this project is the installation and construction phases cannot be
done within the same period of time. In order to deal with this constraint, the tasks need to be
completed one at a time. Another minor constraint is that, the rear stairs have electric wires
Document Page
6CASE STUDY OF ROYALE PIZZA
beneath them. Therefore, the constructors need to be alert while removing those wires. The
installation phase gets followed after the completion of this phase. Approximately $40,000 is
needed for the successful completion of this project that will last for over 4 months (taking in
account, the installation and construction phases do not overlap).
Project Assumptions
Although there are uncertainties regarding the project completion in due time,
following and maintaining the project schedule mentioned in this report can help a lot in
avoiding it (Kerzner 2017). Since the shop will be closed during some of the phases, any
further delay in the project will lead to a penalty of $300 a day for the contractors. Therefore,
early precautions have to be taken in order to avoid such mishap.
Project delivery methodologies
There are several life cycle methodologies in the field of project management (Karaman
and Kurt 2015). Some of the popular methodologies are: Agile, Kanban, Scrum, Scrumban,
Waterfall, XP and Lean.
For this renovation project, agile methodology is to be used. The concepts of agile can be
used in the construction management of this project to enhance its flexibility. There are several
beneficial aspects of using this methodology over the particular project:
It helps in the further breakdown of the project delivery
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
7CASE STUDY OF ROYALE PIZZA
It takes time management as the prime concern of the project. In addition to that frequent and
regular reviews help in improving the financial management of the project specifically in
terms of profitability and productivity.
It also helps in encouraging the workers by grouping them in specific teams. Doors to
continual improvement are opened with the help of agile management throughout the project
that helps modification of the project easier.
Document Page
8CASE STUDY OF ROYALE PIZZA
Task schedule for the project
ID Task
Mode
Task Name Duration Start Finish Predecessors
0 Renovation
project of Royal
Pizza
87 days Fri 3/1/19 Mon
7/1/19
1 Design 37 days Fri 3/1/19 Mon 4/22/19
2 Hold meetings 10 days Fri 3/1/19 Thu 3/14/19
3 Scheduling
the
previously
completed
10 days Fri 3/1/19 Thu
3/14/19
4 Developing
the
deliverables
27 days Fri 3/15/19 Mon
4/22/19
5 Check list
for the
elements
12 days Fri 3/15/19 Mon 4/1/19 3
6 Briefing the
project and
business
case
6 days Tue 4/2/19 Tue 4/9/19 5
7 Cost plan 8 days Wed 4/10/19Fri 4/19/19 6
8 Report
submission
1 day Mon
4/22/19
Mon
4/22/19
7
9 Procurement
and delivery
7 days Tue
4/23/19
Wed
5/1/19
10 Assigning
contractors
5 days Tue
4/23/19
Mon
4/29/19
8
11 Submitting report2 days Tue 4/30/19Wed 5/1/19 10
12 Construction 36 days Thu 5/2/19 Thu 6/20/19
13 Switching off
the heat
1 day Thu 5/2/19 Thu 5/2/19 11
14 Certify area
clearence
15 days Fri 5/3/19 Thu
5/23/19
13
15 Reinstalling
all the areas
20 days Fri 5/24/19 Thu
6/20/19
14
16 Installation and
painting
7 days Fri 6/21/19 Mon 7/1/19
17 Making sure
the
deliverables
coincide
5 days Fri 6/21/19 Thu
6/27/19
15
18 Submit report 1 day Fri 6/28/19 Fri 6/28/19 17
19 Approval for
report closure
1 day Mon 7/1/19 Mon 7/1/19 18
20 Demobilizing
contractors
0 days Mon 7/1/19 Mon 7/1/19 19
Project consultant
Technical manager
Project consultant
Project consultant
Contractor
Certified bodies
Installers
Installers
Technica
Contrac
7/1
2/17 3/10 3/31 4/21 5/12 6/2 6/23 7/14
January 1 February 21 April 11 June 1 Jul
Source- Created by author
Document Page
9CASE STUDY OF ROYALE PIZZA
Project delivery life cycle
The renovation project of Royale Pizza needs to go through four stages throughout its life
cycle, namely initiation, planning, execution and closure of the project (Serrador and Turner
2015). There are certain tasks that are needed to be performed in each of these phases. These
tasks have been briefed below:
The initiation phase
1. Developing a detailed business case of the project
2. Undertaking a thorough feasibility study
3. Establishing a project charter
4. Appointing a suitable team for the project
5. Reviewing the phase
The planning phase
1. Creating a detailed plan for the renovation project
2. Creating the resource plan
3. Risk assessment planning
4. Following the acceptance criteria of the renovation project
5. Establishing networks of connections
6. Creating the procurement plan
7. Contracting the suppliers and simplifying the tasks to them
The execution phase
1. Building the project deliverables
2. Controlling and monitoring the project properly
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
10CASE STUDY OF ROYALE PIZZA
The closure phase
1. Performing the closure of the renovation project
2. Reviewing the completion of the project
SMART Goals
The SMART goal approach can be incorporated within this renovation project to simplify
the objectives and purposes (Bjerke and Renger 2017). The SMART goals of this project have
been mentioned below:
Specific
The renovation project involves reconstructing the shop. The prime purpose of it is to
provide the customers with more than one type of food thus reducing the amount of foods getting
wasted on a regular basis. In that case, a detailed understanding on the needs of the customer is
needed to provide them with their preferred foods.
Measure
Using various kinds of project tracking tools and techniques in order to track and measure
the goals of the project. This will help Royale Pizza to review any kind of required changes.
Attainability
According to (Eskerod and Jepsen 2016) since all the tasks of this project can easily be
attained within the provided budget and time constraints, the associated stakeholders are needed
to be ensured regarding it.
Document Page
11CASE STUDY OF ROYALE PIZZA
Realistic
Ensuring that all the tasks that have been briefed within the project plan are doable. It has
to be done after taking in account the risk factors of the project.
Time
Time is one of the most important constraints when it comes to the successful completion
of a project (Kliem and Ludin 2019). Therefore, one of the prime objectives of this renovation
project is to make sure that the project gets successfully completed by 1st June.
Document Page
12CASE STUDY OF ROYALE PIZZA
Precedence diagram
Source: Created by author
Conclusion
To conclude, the renovation project of Royale Pizza can be successfully completed if the
tasks are performed in a sequential manner as proposed throughout the paper. In order to achieve
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
13CASE STUDY OF ROYALE PIZZA
the goals and objectives, SMART Goal approach can be implemented. In addition to that, a Gantt
chart has been provided within the report, consisting of all the deliverables of this project.
Furthermore, if the proposed methodology is followed, the profitability graph of royal pizza will
definitely experience a potential rise.
Document Page
14CASE STUDY OF ROYALE PIZZA
References
Ahern, T., Leavy, B. and Byrne, P.J., 2014. Complex project management as complex problem
solving: A distributed knowledge management perspective. International Journal of
Project Management, 32(8), pp.1371-1381.
Bjerke, M.B. and Renger, R., 2017. Being smart about writing SMART objectives. Evaluation
and program planning, 61, pp.125-127.
Crawford, J.K., 2014. Project management maturity model. Auerbach Publications.
Eskerod, P. and Jepsen, A.L., 2016. Project stakeholder management. Routledge.
Hák, T., Janoušková, S. and Moldan, B., 2016. Sustainable Development Goals: A need for
relevant indicators. Ecological Indicators, 60, pp.565-573.
Harrison, F. and Lock, D., 2017. Advanced project management: a structured approach.
Routledge.
Karaman, E. and Kurt, M., 2015. Comparison of project management methodologies: prince 2
versus PMBOK for it projects. Int. Journal of Applied Sciences and Engineering
Research, 4(4).
Kerzner, H., 2017. Project management metrics, KPIs, and dashboards: a guide to measuring
and monitoring project performance. John Wiley & Sons.
Kliem, R.L. and Ludin, I.S., 2019. Reducing project risk. Routledge.
Serrador, P. and Turner, R., 2015. The relationship between project success and project
efficiency. Project Management Journal, 46(1), pp.30-39.
chevron_up_icon
1 out of 15
circle_padding
hide_on_mobile
zoom_out_icon
logo.png

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]