This presentation explores various types of civil engineering techniques used in construction projects, such as tunnelling methods, hydraulic structures, marine structures, and highway and railway works. It discusses the advantages and disadvantages of each technique and highlights the importance of proper planning and execution in ensuring successful construction projects.
tabler-icon-diamond-filled.svg

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Document Page
Advanced Civil Engineering
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Introduction
This presentation will depict different types of civil engineering
techniques in various areas of applications. The project is based
on construction of a new tunnel and other associated civil
structures for decreasing the traffic issues and congestion at
Blackwall Tunnel and other river crossings which currently
exists.
Document Page
Task 1
There are three types of
tunnelling methods:
Bored tunnelling
Cut and cover
Drill and Blast
Document Page
Continued...
The proposed project for Balfour Beatty can be efficiently
accomplished without much disturbances to the local people and
the problem of overcrowding in the Blackwall Tunnel shall also be
reduced to some extent with the developed design.
For the proposed project, the tunnelling method selected is drill and
blast.
The environmental impacts which are experienced when other
techniques are implemented are significantly reduced.
There is less noise and dust generated.
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Task 2
There are three basic types of
hydraulic structures which
are depicted as follows:
Dams
Hydroelectric plants
Flood Barriers
Document Page
Continued...
The Thames Flood Barrier is a type of movable flood barrier
and is operational from 1984.
The advantage of this flood barrier is that it notifies about 9
hours before the high tide could reach the city.
An automated system can be integrated with the hydraulic
structure which is developed as flood barrier.
Despite of the fact, that such a system will have to be
maintained at certain costs but the efficiency of an automated
structure is far more than usual one.
Document Page
Task 3
Marine structures are larger
installations which are projected
offshore for different purposes
like:
Generation of renewable energy.
Oil spilling.
These are constructed through
onshore manufacturing and
offshore installation.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Continued...
A strategic method of construction of marine structure is
manufacturing different parts of the entire system and then
assembling the same at the installation base.
This type of construction method is not much adopted and is
considered to be less feasible because of its high transportation
cost.
The use of power generating marine structures shall help in
minimising the negative impact caused on the environment and
will also increase power production capabilities for the country
with respect to the proposed project.
Document Page
Task 4
Following are the
techniques for preparing
the highways and railway
works:
Asphat
Concrete
Composite
Telescopic
Mechanical
Document Page
Continued...
Construction of a highway between Silvertown and North
Greenwich can be done by using popular methods.
Current methods use to build highway in London is composite
method of constructing highway which is very durable and
requires low cost of maintenance.
Railway track are constructed using mechanical method of building
track.
In mechanical method track laying machine is used in which track
is carried out by material.
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Task 5
The issues experienced in civil
engineering projects
include:
Rising costs
Inappropriate quality
Environmental implications
Legal complications
Document Page
Continued...
Rising costs: Use of financial resource management and strategic
planning can help in managing rising costs.
Quality: Pre-planning and supervised designing is one solution to
this issue.
Environment: Quality check of the materials and follow up of
environmental regulations shall help in reducing the environmental
impact.
Legal complications: The company should follow Codes and
permits so that no such consequences arise.
Document Page
Conclusion
There has to be proper planning and execution of the respective
construction activity so that Balfour Beatty doesn't
experience any sort of complications in the future. The use of
appropriate technique and taking into consideration
respective solution shall help in better execution of the
project.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
References
Books and Journals
Elshafie, M.Z.,and et.al., 2015. A tale of two tunnels–understanding
the performance of existing and new tunnels during construction
works.
Fang, Q., and et.al., 2016. Ground surface settlements due to
construction of closely-spaced twin tunnels with different geometric
arrangements. Tunnelling and Underground Space Technology. 51.
pp.144-151.
Online
How does the Thames Barrier stop London flooding?. 2014.
[Online]. Available
Through:<http://www.bbc.com/news/magazine-26133660>.
[Accessed on 6th June, 2017].
Document Page
chevron_up_icon
1 out of 15
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]