MN621 Advanced Network Design: Human Factors in Network Design
VerifiedAdded on 2023/06/11
|7
|1681
|134
Report
AI Summary
This report presents an advanced network design, beginning with questionnaires for gathering requirements from users, management, and other staff. It outlines the purpose of each question in eliciting specific needs for network design and implementation. The report details a step-by-step approach to network design, including analyzing goals and technical constraints, estimating the project budget, creating application profiles, defining service level agreements (SLAs), establishing performance and availability standards, and implementing service level definition monitoring and metric collection. The design incorporates Cisco package tracer to identify potential issues and ensure network performance, using diverse associations for interface redundancy. The report also provides network design diagrams and justifications for the chosen configuration, emphasizing adaptability and reliability. Desklib offers a wealth of similar solved assignments and study tools for students.

Running Head: ADVANCED NETWORK DESIGN
ADVANCED NETWORK DESIGN
Name of the Student:
Name of the University:
Author’s Note:
ADVANCED NETWORK DESIGN
Name of the Student:
Name of the University:
Author’s Note:
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

2
Table of Contents
PART I....................................................................................................................................................3
1.1 Questionnaires for gathering requirement from Users...............................................................3
1.2. Questionnaires for gathering requirement from management staffs........................................3
1.3. Questionnaires for gathering requirement from other staffs.....................................................3
1.4. Purpose of each question...........................................................................................................4
PART II...................................................................................................................................................4
Step#1: Analysis of the goals and the technical constraints..............................................................4
Step#2: Estimation of the project budget.........................................................................................4
Step#3: Application profile creation and related to the network application...................................4
Step#4: SLA creation including the availability, response, fault tolerance, threshold, upgradation..4
Step#5: Standards of performance and availability...........................................................................5
Step#6: Service level definition monitoring and metric collection....................................................5
JUSTIFICATION.......................................................................................................................................6
Bibliography...........................................................................................................................................7
2 | P a g e
Table of Contents
PART I....................................................................................................................................................3
1.1 Questionnaires for gathering requirement from Users...............................................................3
1.2. Questionnaires for gathering requirement from management staffs........................................3
1.3. Questionnaires for gathering requirement from other staffs.....................................................3
1.4. Purpose of each question...........................................................................................................4
PART II...................................................................................................................................................4
Step#1: Analysis of the goals and the technical constraints..............................................................4
Step#2: Estimation of the project budget.........................................................................................4
Step#3: Application profile creation and related to the network application...................................4
Step#4: SLA creation including the availability, response, fault tolerance, threshold, upgradation..4
Step#5: Standards of performance and availability...........................................................................5
Step#6: Service level definition monitoring and metric collection....................................................5
JUSTIFICATION.......................................................................................................................................6
Bibliography...........................................................................................................................................7
2 | P a g e

3
PART I
1.1 Questionnaires for gathering requirement from Users
What are exactly the activities that must be set up on the floor of the workstations?
What numbers of social affairs of customers are using the system?
What kind of equipment is utilized for the partner and working up the framework
and allowing correspondence among the clients related to the system?
What are the limitations looked at some point or another in using the front line sort
out system?
What can be the applications and the locales occasionally used inside the place of
business?
1.2. Questionnaires for gathering requirement from management staffs
What can be the anticipated grouping of customers having the get right of entry of
the present framework establishment?
What number of floors are there inside the building, which can be ought to have
been joined through the framework?
What number of servers must be utilized for control of the innovative development
of the customers related to the framework?
What is the cost appropriated for the progression of the framework react in the due
request with respect to the recreations practices caught?
Which foundation of customers must recognize the get segment of the coordinators
mounted in the framework?
Is there any level of future enlargement of the system for the settlement of the
change of the structure?
1.3. Questionnaires for gathering requirement from other staffs
What are the guidelines makes usage of the framework for the control of the data?
What sorts of locales and groups are gotten to or trapped inside the handling
contraption and used for the control of the device?
What kind of utilities call for web arrange for its working?
Which staffs are required to be related to the framework for its running?
What sorts of chronicles are shared and saved inside the zone server for building up
the flexibility of the structure?
3 | P a g e
PART I
1.1 Questionnaires for gathering requirement from Users
What are exactly the activities that must be set up on the floor of the workstations?
What numbers of social affairs of customers are using the system?
What kind of equipment is utilized for the partner and working up the framework
and allowing correspondence among the clients related to the system?
What are the limitations looked at some point or another in using the front line sort
out system?
What can be the applications and the locales occasionally used inside the place of
business?
1.2. Questionnaires for gathering requirement from management staffs
What can be the anticipated grouping of customers having the get right of entry of
the present framework establishment?
What number of floors are there inside the building, which can be ought to have
been joined through the framework?
What number of servers must be utilized for control of the innovative development
of the customers related to the framework?
What is the cost appropriated for the progression of the framework react in the due
request with respect to the recreations practices caught?
Which foundation of customers must recognize the get segment of the coordinators
mounted in the framework?
Is there any level of future enlargement of the system for the settlement of the
change of the structure?
1.3. Questionnaires for gathering requirement from other staffs
What are the guidelines makes usage of the framework for the control of the data?
What sorts of locales and groups are gotten to or trapped inside the handling
contraption and used for the control of the device?
What kind of utilities call for web arrange for its working?
Which staffs are required to be related to the framework for its running?
What sorts of chronicles are shared and saved inside the zone server for building up
the flexibility of the structure?
3 | P a g e
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

4
1.4. Purpose of each question
The extras can be joined with the social event for the conspicuous check of the necessities
and the game plan of studies helps in lessening the effort for examination of the substance of the
endeavour. The customers for seeing the request should eat up less time and the right reaction to
the request can help in getting a perfect result from the survey [1]. The unquestionable certification
of the need helps in reducing the mix-ups in the advance of the correct inverse thing and it helps in
expanding the continuing on the thought of the entire system.
PART II
In the event that there ought to be an event of the circumstance that the staffs are not
prepared to give, meet or go to social occasions the going with propels should be considered for the
change of the framework course of action.
Step#1: Analysis of the goals and the technical constraints
The plan and the traditions that must be used must be perceived and it ought to be agreed
with the contemporary circumstance for the difference in the system topology. The number of
customers and the numerous the system ought to also be seen for the introduction of different
report channel for sharing stores of the records packages going from specific wellsprings of the
undertaking [2].
Step#2: Estimation of the project budget
The undertakings must be productive if the cost is seen precisely and the extra esteem go is
disseminated to the questionable parts, which may catch up on the mission [3]. The social order
dressmaker is moreover responsible for the character of the needs of the business and changes the
framework layout with the propelled try to such a degree, to the point that the recreations practices
complex control does not deny any inconvenience even as the use of the framework structure.
Step#3: Application profile creation and related to the network application
The society chief must be fit for exploring the system for recognizing confirmation of the
plan and trouble searching for the course of action of the framework gadget. The extents of the
customer using the records gadget must be seen and accumulated dependably with the customer
course of action for the presence of the utility of the profile [4].
Step#4: SLA creation including the availability, response, fault tolerance, threshold, upgradation
The various segments influencing the general execution of the framework should be secured
inside the transporter level settlement and it must have remained mindful of the genuine target that
4 | P a g e
1.4. Purpose of each question
The extras can be joined with the social event for the conspicuous check of the necessities
and the game plan of studies helps in lessening the effort for examination of the substance of the
endeavour. The customers for seeing the request should eat up less time and the right reaction to
the request can help in getting a perfect result from the survey [1]. The unquestionable certification
of the need helps in reducing the mix-ups in the advance of the correct inverse thing and it helps in
expanding the continuing on the thought of the entire system.
PART II
In the event that there ought to be an event of the circumstance that the staffs are not
prepared to give, meet or go to social occasions the going with propels should be considered for the
change of the framework course of action.
Step#1: Analysis of the goals and the technical constraints
The plan and the traditions that must be used must be perceived and it ought to be agreed
with the contemporary circumstance for the difference in the system topology. The number of
customers and the numerous the system ought to also be seen for the introduction of different
report channel for sharing stores of the records packages going from specific wellsprings of the
undertaking [2].
Step#2: Estimation of the project budget
The undertakings must be productive if the cost is seen precisely and the extra esteem go is
disseminated to the questionable parts, which may catch up on the mission [3]. The social order
dressmaker is moreover responsible for the character of the needs of the business and changes the
framework layout with the propelled try to such a degree, to the point that the recreations practices
complex control does not deny any inconvenience even as the use of the framework structure.
Step#3: Application profile creation and related to the network application
The society chief must be fit for exploring the system for recognizing confirmation of the
plan and trouble searching for the course of action of the framework gadget. The extents of the
customer using the records gadget must be seen and accumulated dependably with the customer
course of action for the presence of the utility of the profile [4].
Step#4: SLA creation including the availability, response, fault tolerance, threshold, upgradation
The various segments influencing the general execution of the framework should be secured
inside the transporter level settlement and it must have remained mindful of the genuine target that
4 | P a g e
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

5
the framework is in no way, shape or form at all, down and kept up for acquiring the decision yield
from the framework [5]. The structure downtime should be unimportant and no encounters need be
lost again in the meantime as sending from various resources of the system.
Step#5: Standards of performance and availability
The restrictions involving nonappearance of records groups, stop up, divide ought to be
cleared to such a degree, to the point that the framework device is open and the misunderstandings
inside the assignment must be abstained from [6]. The switches must be masterminded with great of
the organization to such a degree, to the point that the framework performs best continually and it
does not have any terrible impact on the customers associated with the framework.
Step#6: Service level definition monitoring and metric collection
The supplier degree definition is accumulated and the general execution and throughput
inconveniences are gathered for getting together the targets of the network [8]. The succeeding
design tends to develop the records site guests inside the system empowers inside the character of
the dream issues and the related issue for building up the network foundation.
Figure 1: The design of the network for the Complex of the Sports 7.1
(Source: Created by the author)
5 | P a g e
the framework is in no way, shape or form at all, down and kept up for acquiring the decision yield
from the framework [5]. The structure downtime should be unimportant and no encounters need be
lost again in the meantime as sending from various resources of the system.
Step#5: Standards of performance and availability
The restrictions involving nonappearance of records groups, stop up, divide ought to be
cleared to such a degree, to the point that the framework device is open and the misunderstandings
inside the assignment must be abstained from [6]. The switches must be masterminded with great of
the organization to such a degree, to the point that the framework performs best continually and it
does not have any terrible impact on the customers associated with the framework.
Step#6: Service level definition monitoring and metric collection
The supplier degree definition is accumulated and the general execution and throughput
inconveniences are gathered for getting together the targets of the network [8]. The succeeding
design tends to develop the records site guests inside the system empowers inside the character of
the dream issues and the related issue for building up the network foundation.
Figure 1: The design of the network for the Complex of the Sports 7.1
(Source: Created by the author)
5 | P a g e

6
Figure 2: The stimulation of the network
(Source: Created by the author)
JUSTIFICATION
The framework is made in Cisco package deal tracer that focuses the stumbles and the
execution of the social event. distinctive incompetent associations are used for interfacing the trade
with each uncommon to this sort of acknowledgement, to the calculate that the occasion that one
association misses the mark the substances package course of action can accomplish the experience
spot direct after the duplicate relate [7]. The trade interfaces ought to be framed which develops as
per the given IP that tends to devise and its miles related to the trade for the movement of the get-
together to the pc related to the superb LAN of the structure. The framework course of action has
endeavoured sooner than sending inside the genuine closeness for the clearing of the hazard related
to the capability in the social affair game plan.
6 | P a g e
Figure 2: The stimulation of the network
(Source: Created by the author)
JUSTIFICATION
The framework is made in Cisco package deal tracer that focuses the stumbles and the
execution of the social event. distinctive incompetent associations are used for interfacing the trade
with each uncommon to this sort of acknowledgement, to the calculate that the occasion that one
association misses the mark the substances package course of action can accomplish the experience
spot direct after the duplicate relate [7]. The trade interfaces ought to be framed which develops as
per the given IP that tends to devise and its miles related to the trade for the movement of the get-
together to the pc related to the superb LAN of the structure. The framework course of action has
endeavoured sooner than sending inside the genuine closeness for the clearing of the hazard related
to the capability in the social affair game plan.
6 | P a g e
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

7
Bibliography
[1]. Eskandarpour, Majid, Pierre Dejax, Joe Miemczyk, and Olivier Péton. "Sustainable supply chain
network design: an optimization-oriented review."
Omega 54 (2015): 11-32.
[2]. Fleischmann, Bernhard, and Achim Koberstein. "Strategic network design." In
Supply chain
management and advanced planning, pp. 107-123. Springer, Berlin, Heidelberg, 2015.
[3]. Green, Alison L., Aileen P. Maypa, Glenn R. Almany, Kevin L. Rhodes, Rebecca Weeks, Rene A.
Abesamis, Mary G. Gleason, Peter J. Mumby, and Alan T. White. "Larval dispersal and movement
patterns of coral reef fishes, and implications for marine reserve network design."
Biological
Reviews 90, no. 4 (2015): 1215-1247.
[4]. J. SIMMONS,
OPTICAL NETWORK DESIGN AND PLANNING. [Place of publication not identified]:
SPRINGER, 2016.
[5]. Nam, Young-Han, and Jin-Kyu Han. "Apparatus and method for channel-state-information pilot
design for an advanced wireless network." U.S. Patent 9,119,209, issued August 25, 2015.
[6]. Nawrat, K. Simek and A. Ś wierniak, Advanced technologies for intelligent systems of national
border security. Berlin: Springer, 2013.
[7]. R. Brewer, "Advanced persistent threats: minimising the damage", Network Security, vol. 2014,
no. 4, pp. 5-9, 2014
[8]. S. Subramaniam, M. Brandt-Pearce, P. Demeester and C. VijayaSaradhi,
Cross-Layer Design in
Optical Networks. Boston, MA: Springer US, 2013.
7 | P a g e
Bibliography
[1]. Eskandarpour, Majid, Pierre Dejax, Joe Miemczyk, and Olivier Péton. "Sustainable supply chain
network design: an optimization-oriented review."
Omega 54 (2015): 11-32.
[2]. Fleischmann, Bernhard, and Achim Koberstein. "Strategic network design." In
Supply chain
management and advanced planning, pp. 107-123. Springer, Berlin, Heidelberg, 2015.
[3]. Green, Alison L., Aileen P. Maypa, Glenn R. Almany, Kevin L. Rhodes, Rebecca Weeks, Rene A.
Abesamis, Mary G. Gleason, Peter J. Mumby, and Alan T. White. "Larval dispersal and movement
patterns of coral reef fishes, and implications for marine reserve network design."
Biological
Reviews 90, no. 4 (2015): 1215-1247.
[4]. J. SIMMONS,
OPTICAL NETWORK DESIGN AND PLANNING. [Place of publication not identified]:
SPRINGER, 2016.
[5]. Nam, Young-Han, and Jin-Kyu Han. "Apparatus and method for channel-state-information pilot
design for an advanced wireless network." U.S. Patent 9,119,209, issued August 25, 2015.
[6]. Nawrat, K. Simek and A. Ś wierniak, Advanced technologies for intelligent systems of national
border security. Berlin: Springer, 2013.
[7]. R. Brewer, "Advanced persistent threats: minimising the damage", Network Security, vol. 2014,
no. 4, pp. 5-9, 2014
[8]. S. Subramaniam, M. Brandt-Pearce, P. Demeester and C. VijayaSaradhi,
Cross-Layer Design in
Optical Networks. Boston, MA: Springer US, 2013.
7 | P a g e
1 out of 7
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.