Advanced Project Management for 94WBR-shed project in Geelong

   

Added on  2023-06-11

10 Pages2067 Words212 Views
Leadership ManagementLanguages and Culture
 | 
 | 
 | 
Running head: ADVANCED PROJECT MANAGEMENT
Advanced Project Management
Name of the Student
Name of the University
Author’s note
Advanced Project Management for 94WBR-shed project in Geelong_1

1ADVANCED PROJECT MANAGEMENT
Table of Contents
1.Brief definition of the 94WBR-shed project...........................................................................2
2.Scope/Deliverables of 94WBR-shed project..........................................................................2
3.Waterfall methodology for effective management of the 94WBR-shed project in Geelong..3
4.Tools and techniques for addressing 10 knowledge areas of PMBOK...................................4
5.Scope, risk, communication and procurement management...................................................6
6.Management of integration, stakeholders, HR, safety, quality, time, cost of 94WBR-shed
project in Geelong......................................................................................................................7
7.References...............................................................................................................................8
Advanced Project Management for 94WBR-shed project in Geelong_2

2ADVANCED PROJECT MANAGEMENT
1. Brief definition of the 94WBR-shed project
CPB Contractors has been given the responsibility to construct the 94WBR-shed. The
project manager will prepare the plan and will assign the stakeholders for the project. The
shed project work will contain the list of activities demolition works in the backyard at first.
After the demolition work gets completed, the stakeholders will perform the site work, after
the site work they will work on building the floor, after that they will carry out the Wall
construction work, framing of roof, installation of doors and windows. Later they will work
on the painting and the cleaning work. CPB Contractors stakeholders will work on the norms
and strategy of CPB Contractors and will accomplish the project within given time. The
project plan will contain all the activities that need to be performed along with the budget and
the time schedule. The shed project contains the list of stakeholders- the civil engineer, wood
machinist, and builder, subcontractor, cleaning staff and lastly painter and decorator. It will
also contain the sponsor and the content writer.
2. Scope/Deliverables of 94WBR-shed project
94WBR-Shed Project will contain the list of activities that need to be performed by the
project team. The tasks initially contain the minor demolition-construction work initially. The
demolition work involves the cutting down of trees, removing section of the boundary wall
using 341 high reach demolition excavators. It also involves cutting down of small plants and
grass. It also involves clearance of backyard lot. The construction work contains the site
work, building of floor step. The mason will use the wooden frame to mark the boundary of
the shed; the builder will dig the hole for the first block. Gravel adding and the installation of
block are part of the site work. The building of floor step involves the marking of joist
locations on long front joists, marking of joist locations on rear rim joists. The building of
floor joists consists of the doubling front joists, addition of plywood floor. The wall
Advanced Project Management for 94WBR-shed project in Geelong_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Advanced Project Management for 94WBR-Shed Project
|12
|2571
|464

Advanced Project Management Project Description of 94WBR-shed Project
|16
|3539
|199