Running head: ADVANCED PROJECT MANAGEMENT Advanced Project Management Name of Student: Name of the University:
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
1ADVANCED PROJECT MANAGEMENT Executive Summary This paper defines the roles and impact of combining project management and change manage plan together. It will help the project owners and the organization to meet the project objectives. It also motivates the project manager and project team members.
2ADVANCED PROJECT MANAGEMENT Table of Contents Introduction......................................................................................................................................3 Link between project management and change control management.............................................3 Conclusion.......................................................................................................................................9 References......................................................................................................................................11 Appendix........................................................................................................................................14
3ADVANCED PROJECT MANAGEMENT Introduction A structural business process approach is always defines as a combination of change management plan and project management plan. Mostly it is found that the project owners are failing to integrate the project management approaches to the change management plan. Very often it is determined that people’s lives are either positively or negatively getting impacted through projects but roles, tasks and jobs are not accurately considered. In order to successfully implement any project within estimated time and budget professional project management practices are needed to be followed by the project managers. Besides project management practices change management plan is the other knowledge area that requires major focus. This paper demonstrates the link between project management and change management or lack of. However, it is the role of the project manager to follow and establish project management methodologies to achieve project success and objectives. Though, in most of worldwide projects some of the failures are evident and one of the important reason for such failure are project implements change management but forget to introduce the important project managementparameters.Whileimplem3ntingsuchchangemanagementtherolesand responsibilities that the project manager needs to follow are recommended in this paper. Link between project management and change control management According toKerzner and Kerzner (2017) successful accomplishment of any structural business approach needs combination between project management and change management. Successful change can be manipulated with different types of factors that can affect the change results and project objectives. For individual’s transition change management is applied as a
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
4ADVANCED PROJECT MANAGEMENT structured and strategic approach.Hornstein (2015) stated that, the combinations of project management change management are very often considered as integrated transition activity. Change management plan is referred to as a systematic approach that is used to deal with internal and external business changes from both the organizational and individuals perspectives. The ambiguous term change management is used for three different aspects in terms of adoption of change management plan, controlling changes and effecting changes. In other words,Binder (2016) opined that change management is a formal process where changes in projects are introduced and also approved respectively. Again,Cameron and Green (2015) stated that, change management is a set of process employed to make sure that all significant changes are orderly implemented and controlled as well to affect the needful organizational changes. Whenever an organization introduces change with any project that change should be effectively managed from both the people and technical perspectives. Focus on the technical side makes sure that the changes are designed, developed and deliveredaccurately(Rosemannandvom Brocke 2015). On theotherhand, the project management discipline gives project structures, tools and process required to accomplish any project. Project management and change management are collectively aimed to increase the probability which projects and initiatives deliver the planned results as well as outcomes. According toCummings, Bridgman and Brown (2016) each of the project management and changemanagementdisciplinearefunctionallyindependent.Howeverthemosteffective approach is to combine the change management and project management together to generate an amalgamated approach for change implementation in both the fronts.
5ADVANCED PROJECT MANAGEMENT Value of such integration The combined form of project management and change management can create values on any given initiatives or projects for different reasons and theses reasons are as follows: Shared objectives: whenever a link is created between project management and change management the integrated efforts put its focus on the single shared project objective (Binder 2016). The combined focus will help the project manager and project owner to meet the objectives determined by the client. It also improves the individual’s and overall organizational performance while implementing the change which delivers the expected outcome or predictable result. Proactive steps:According toHeckmann, Steger and Dowling (2016) while change management and project management prcatices are integrated together the efforts required for managing the people of change could identify as well as resolve the potential risks ina much proactive manner. In other words, it will help to identify or address the potential obstacles as well as resistance to develop commitment and buy in for the identified changes. Sequencing and business alignment: While activities of the project associates and technical activities are integrated the correct action can be undertaken at the accurate time in project management lifecycle for helping all the employees embrace the changes and produce expected outcome of the project (Niaziet al. 2016). In other words, the structured combination of change management and project management mostly develops strategies that are aligned to the project objectives.
6ADVANCED PROJECT MANAGEMENT Information sharing:Kerzner and Kerzner 2017) stated that the flow of information becomes much improved when the change management plan is integrated to project management plan. This integrated process makes sure that on the front end the impacted working employees are getting all accurate information. On the opposite side, in back end the combines process make sure that all associate project team members are receiving appropriate feedback regarding the adoption, use and reaction for changes. Recognition of values and roles of change management:Before integrating project management and change management their roles and values are to be acknowledged by the project managers and project associate team members.Bresnen (2016) stated that, the change management should be valued as well as viewed as an essential component for successful project delivery. The concept of change management and project management are different but the goal of the combines approach is similar. Three individual responsibilities are served by the change control process in project management lifecycle and these are as follows: Addressing possible changes in terms of impact that will have on the complete project the entirechangedefinitionandtheprojectmodulesthoseareaffected.Foranykindof discrepancies, the assumed changes are to be reviewed. The changes should be approved after the stringent analysis considering all the project management perspectives. In order to implement the identified and assumed organizational and project changes if proper change management plan is not implemented then the complete project will be interrupted (Hornstein 2015). The process of change management must not lag the project management prcatices. It has been defined that change control is referred to as a point where most projects are found in risks from the initial
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
7ADVANCED PROJECT MANAGEMENT inception. In order to meet any kind of identified project changes the combination of change management and project management are very essential. Recommendation to project manager It is found that both the change management as well as project management generally aims to enhance the likelihoods of the projects by delivering proper initiatives that further intends proper outcomes as well as results. As each of the discipline can be able to properly function the most important approach in order to properly integrating the change management withintheproject,itisnecessarytocreateproperunifiedapproachforsuccessfully implementing the change. In order to integrate both the change management as well as project management, it is recommended that the project managers must adopt the following steps that are generally elaborated below: Focus on the need and value of change management in project:It is identified that before the integration of the change management and project management, there is a requirement to properly acknowledge the role as well as the change management value. It is found that change management can generally be viewed as well as valued as a proper crucial component for thedeliveryoftheproject.Properinformationaswellasknowledgeaboutthechange management can be gained within the project during the progress of the project so that the integration of change management within the project can be done quite successfully which further helps in keeping the entire project on track and helps in avoiding the slippage of schedule. The project manager must also focus on the connection of the change management with the success of the project. As there are a number of approaches that helps in making connection by properly applying the change management then it would generally create impact
8ADVANCED PROJECT MANAGEMENT by properly realizing the benefits as well as for achieving proper results and outcomes within the project. Carrying out change assessment:The project manager must focus on the change request in detailand then assess itsimpacton schedule,documentation,budget, quality measures, scope as well as availability of resources. In addition to this, it is necessary to check the documents as well as other training manuals. In some of the cases, it is identified that changes cannot be implemented as the benefit that is perceived is quite less After proper analysis, the decision of making changes within the project must be made. This step that is taken by the project manager helps in controlling the changes. Utilization of change management control tools:It is found that there are a number of change management control tools that are necessary for controlling the changes. The project manager must utilize the project change request form, template for change request as well as a checklist for checking the process map in order to control the changes within the project so that the progress of the project does not get affected. With the help of the change request form, the requested changes within the project are verified for making sure that the changes that are needed will be needed or rejected as per the requirement. Structuredaswellasrigorousapproachtochangemanagement:Theproject manager must take the responsibility of structuring the entire procedure into proper set of deliverables. It is necessary to bring proper structured procedure with proper set of project deliverables to the people. The utilization of structured approach for properly integrating the change management with project management generally assists in increasing the accessibility as well as credibility of the project sponsor, project teams as well as the project managers. In
9ADVANCED PROJECT MANAGEMENT additiontothis,theprojectmanagermusttakeproperinitiativeforproperlydesigning, developing as well as delivering the solution which is embraced, utilized as well as adopted by the employees. Both the change management as well as project management assists in providing roper unified approach in order to achieve the desired result as well as outcomes due to the organizational change. Proper focus on scope management:The project manager must take the initiative of managing the scope of the project as scope management is one of the procedure that helps in refining the activities that is generally necessary to execute and what is not necessary. The project manager must refine the requirement of changes within the project properly for making sure whether the changes are required or not which further helps in controlling the change management procedure. It is also necessary for the project managers to properly understand the PMBOK guide that reflects the significance of change control management within the project. Focusing on results:The project manager must take the responsibility of taking the accountability off delivering the outcomes as well as result so that meaningful integration must occur. The resources of the change management must define the issues in context to achievement of the project results for executing the change management procedure. On the other hand, it is found that if the changes that are demanded does not create any positive result then those changes must be avoided in the project for successfully completing the work of the project on time. Conclusion It can be concluded from the entire report that proper link between proper management as well as change control methods are generally necessary as both project management and change
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
10ADVANCED PROJECT MANAGEMENT management are collectively aimed to increase the probability of delivering the planned results as well as outcomes. It is found that the paper reviews a number of journal articles as well as scholarly papers that helps in elaborating the importance of the linkage that is generally required between change control management as well as project management. In addition to this, it is found that the most proper approach is to combine the change management and project managementtogethertogenerateanamalgamatedapproachforchangeimplementation. Furthermore, the paper also elaborates number of recommendations to the project manager that will not only help the project managers in linking the change control procedure and change management but also helps in reflecting on the steps that are helpful in controlling the change management within the project so that the project can be expected successfully on time and within the assumed budget
11ADVANCED PROJECT MANAGEMENT References Binder, J., 2016.Global project management: communication, collaboration and management across borders. Routledge. Bresnen, M., 2016. Institutional development, divergence and change in the discipline of project management.International journal of project management,34(2), pp.328-338. Cameron, E. and Green, M., 2015.Making sense of change management: A complete guide to the models, tools and techniques of organizational change. Kogan Page Publishers. Cummings, S., Bridgman, T. and Brown, K.G., 2016. Unfreezing change as three steps: Rethinking Kurt Lewin’s legacy for change management.Human relations,69(1), pp.33-60. Heckmann, N., Steger, T. and Dowling, M., 2016. Organizational capacity for change, change experience, and change project performance.Journal of Business Research,69(2), pp.777-784. Hornstein, H.A., 2015. The integration of project management and organizational change management is now a necessity.International Journal of Project Management,33(2), pp.291- 298. Hornstein, H.A., 2015. The integration of project management and organizational change management is now a necessity.International Journal of Project Management,33(2), pp.291- 298. Hughes,W.,Champion,R.,andMurdoch,J.2015.Constructioncontracts:lawand management. Routledge.
12ADVANCED PROJECT MANAGEMENT Istrate, M. G., Harrison, T. R., Valero, R., Morgan, S. E., Páez, G., Zhou, Q., ... and Manyalich, M. 2015. Benefits of Transplant Procurement Management (TPM) specialized training on professional competence development and career evolutions of health care workers in organ donation and transplantation.Experimental and Clinical Transplantation,13(1), 148-155. Jo, S. H., Lee, E. B., and Pyo, K. Y. 2018. Integrating a Procurement Management Process into Critical Chain Project Management (CCPM): A Case-Study on Oil and Gas Projects, the Piping Process.Sustainability,10(6), 1-22. Kerzner, H. and Kerzner, H.R., 2017.Project management: a systems approach to planning, scheduling, and controlling. John Wiley & Sons. Kerzner, H., and Kerzner, H. R. 2017.Project management: a systems approach to planning, scheduling, and controlling. Lines, B.C., Sullivan, K.T., Smithwick, J.B. and Mischung, J., 2015. Overcoming resistance to changeinengineeringandconstruction:Changemanagementfactorsforowner organizations.International Journal of Project Management,33(5), pp.1170-1179. Mir, F. A., and Pinnington, A. H. (2014). Exploring the value of project management: linking projectmanagementperformanceandprojectsuccess.Internationaljournalofproject management,32(2), 202-217. Niazi, M., Mahmood, S., Alshayeb, M., Riaz, M.R., Faisal, K., Cerpa, N., Khan, S.U. and Richardson, I., 2016. Challenges of project management in global software development: A client-vendor analysis.Information and Software Technology,80, pp.1-19.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
13ADVANCED PROJECT MANAGEMENT Rosemann,M.andvomBrocke,J.,2015.Thesixcoreelementsofbusinessprocess management. InHandbook on business process management 1(pp. 105-122). Springer, Berlin, Heidelberg. Sears, S. K., Sears, G. A., Clough, R. H., Rounds, J. L., and Segner, R. O. 2015.Construction project management. John Wiley and Sons. Whitaker, S. 2016. Procurement Management. InPass the PMP® Exam(pp. 405-444). Apress, Berkeley, CA.
14ADVANCED PROJECT MANAGEMENT Appendix Figure 1: Change management plan