ProductsLogo
LogoStudy Documents
LogoAI Grader
LogoAI Answer
LogoAI Code Checker
LogoPlagiarism Checker
LogoAI Paraphraser
LogoAI Quiz
LogoAI Detector
PricingBlogAbout Us
logo

Agile Method Adoption Literature Review 2022

Verified

Added on  2022/09/28

|13
|1527
|21
AI Summary

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Document Page
Running head: AGILE METHOD ADOPTION
AGILE METHOD ADOPTION
Name of the Student:
Name of the University:
Author Note:

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
1
AGILE METHOD ADOPTION
1 a.
Literature 1
Gandomani, T. J., & Nafchi, M. Z. (2016). The essential prerequisites of Agile transition and
adoption: A grounded theory approach. Journal of Internet Computing and Services (JICS), 5,
173-183.
In this paper the major complexity that is present includes issues related to issues related
to traditional methodology. There has been an increase in challenges in ATP due to the presence
of the traditional methodology. Inefficient human interaction in the processing of the software
development has been acting as the complexity, leading to implementation of Agile
methodology.
Literature 2
Rigby, D. K., Sutherland, J., & Takeuchi, H. (2016). Embracing agile. Harvard Business
Review, 94(5), 40-50.
In today’s society, increase in dependence of digital platform. This ensures the fact that
software development has been the major concern. This requires constant updating of the file.
Hence wise the other PMMs will not be capable enough to perform the updates other than Agile
methodology. Hence requirement in adoption of Agile PMM will be beneficial.
Literature 3
Vacari, I., & Prikladnicki, R. (2015). Adopting agile methods in the public sector: a systematic
literature review. In Embrapa Informática Agropecuária-Artigo em anais de congresso (ALICE).
Document Page
2
AGILE METHOD ADOPTION
In: INTERNATIONAL CONFERENCE ON SOFTWARE ENGINEERING AND
KNOWLEDGE ENGINEERING, 27., 2015, Pittsburgh. Proceedings... Pittsburgh: Pittsburgh
University, 2015..
In this paper the major complexity is considered includes the fact that there has been an
issue related to job satisfaction of the employees in the software development industry. This is
the main reason that efficiency of the functional process might be getting affected in a negative
manner. This is the major reason of Agile methodology implementation.
Literature 4
Ahimbisibwe, A., Daellenbach, U., & Cavana, R. Y. (2017). Empirical comparison of traditional
plan-based and agile methodologies: Critical success factors for outsourced software
development projects from vendors’ perspective. Journal of Enterprise Information
Management, 30(3), 400-453.
As per this literature the major complexity in the functional process of software related
projects. The main aspect that is considered in this case is that it is seen that issues related to
budgeting and timeline of the project execution. It is seen that in case of using the traditional
PMM, there is a rigidity in the processing and hence wise an increase in complexity. With Agile
PMM adoption this issue can be mitigated.
Literature 5
Papadopoulos, G. (2015). Moving from traditional to agile software development methodologies
also on large, distributed projects. Procedia-Social and Behavioral Sciences, 175, 455-463.
Document Page
3
AGILE METHOD ADOPTION
Initially in the business organization, traditional PMM were used. Due to the usage of the
traditional PMM usage, the main aspect that is used includes the fact that dynamicity of
functional process is hampered. Issue regarding customer requests are also not met in a dynamic
manner as rigidity of the entire system is very high. Changes that are to be brought in are not
well introduced due to this PMM. With the help of Agile PMM, these issues can be mitigated.
b.
Themes Issue 1 Issue 2 Issue 3
Business Case ATP introduction
Organization Transforming to
digital platform
Quality Requires Iteration High rigidity in
functionig
2 a.
1980
Pac-Man
In the year 1980, projects regarding game development was performed. Arcade game Pac-Man
was released.
Critical Risk
Failure in budget planning

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
4
AGILE METHOD ADOPTION
Failure in Resource Allocation
Issue
The programmers were inexperience
Resource strength was low
Challenge
It was the very first game being developed
Licensing issues
Schedule planned was highly professional and the budget it had was very limited. Cost Quality
was very high and the skills were very high as well but the experience was a concern.
Space Invaders
Critical Risk
The budget that was initially set was very low
The game that was being designed was highly indifferent
Issue
Improper gameplay
Inefficient microcomputers in Japan to play the game
Challenge
Make it compatible to the Japanese microcomputers
Reduce complexity in the game
Document Page
5
AGILE METHOD ADOPTION
Scope of the project is to provide proper entertainment to the clients. Schedule, cost, quality of
the products have been very high. The skill set was very high and the roles are diversified.
Unix to Unix copy
Critical Risk
Error in copied data will be resulting in improper result
Improper alignment from peer to peer networks
Issue
Presence of minority of newsgroup
Lot of information is required in RFD.
Challenge
RFC 850 was the first formal specification and hence specification setting was a problem Budgeting is also an issue.
1990
Adobe Photoshop
Critical Risk
It is the very first version and hence risks were unpredictable
X86-64 implementation
Issue
Gaining license
Document Page
6
AGILE METHOD ADOPTION
Performing photo shop mix.
Challenge
Schedule was tight
Implementation of android handset
The scope of the projects is to provide better assessment in editing purpose and the budget as
well as the scope was met. The employees were highly skilled.
Windows 3.0
Critical Risk
Revamped User Interface
Usage of list based file manager
Issue
High system requirement
Requirement of MS DOS version higher than 3.1
Challenge
Installation of VGA drivers
Alignment of memory modes
The budget that is stated was robust and the process was completed in the meantime.
World Wide Web
Critical Risk

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
7
AGILE METHOD ADOPTION
Improper functioning of HTML
Performing Linking
Issue
Improper scheme specifiers
Improper web server linking
Challenge
Modelling SGML
Signing off of SGML ISO
Budget was well maintained and the schedule was well maintained.
2000
PlayStation
Critical Risk
Return of investment
Acceptance of the product
Issue
Cost of the product manufacturing was high
Usage of Emotion engine for the first time
Challenge
Providing dual shock handling
Document Page
8
AGILE METHOD ADOPTION
Creating lighter versions of the gaming console
There was an issue regarding the scheduling process and hence wise budgeting issue was also
present.
E-book
Critical Risk
Acceptance of the book
Excess dependency on internet
Issue
Accessibility issue
Direct competition with traditional books
Challenge
Staying in the budget
Increasing accessibility
Schedule and budget was well maintained. Employees were well trained as per the job roles.
Facebook launch
Critical Risk
Data privacy risk
Data base management system risk
Issue
Document Page
9
AGILE METHOD ADOPTION
Low resources
Lack of personal privacy
Challenge
Dependent on Internet
Lack of accessibility
There was no schedule or budget present in case of Facebook development. Roles were not
properly aligned as well.
2010
Automated cars
Critical Risk
Sensor functioning
Decision making
Issue
Excess cost incurred in manufacturing
Requires proper scheduling and planning
Challenge
Marketing of the product
Acceptance of the product
Scheduling is performed in a proper manner and so is the budget.

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
10
AGILE METHOD ADOPTION
AI
Critical Risk
Following the schedule
Providing required data
Issue
Lack of control in decision making
Poor performance in decision making
Challenge
Reliability on the technology
Managing the resources
The budgeting and scheduling section is performed in a proper manner. Resources are highly
viable.
Machine learning
Critical Risk
Excess data reception
Improper data analysis
Issue
Programmers have no control
Resources need to be highly skilful
Document Page
11
AGILE METHOD ADOPTION
Challenge
Requires complex framework for implementation of machine learning In case of inaccurate data provisioning decision making gets affected
Scheduling of the project is highly affected. Programmers were highly efficient.
Document Page
12
AGILE METHOD ADOPTION
References
Ahimbisibwe, A., Daellenbach, U., & Cavana, R. Y. (2017). Empirical comparison of traditional
plan-based and agile methodologies: Critical success factors for outsourced software
development projects from vendors’ perspective. Journal of Enterprise Information
Management, 30(3), 400-453.
Gandomani, T. J., & Nafchi, M. Z. (2016). The essential prerequisites of Agile transition and
adoption: A grounded theory approach. Journal of Internet Computing and Services
(JICS), 5, 173-183.
Papadopoulos, G. (2015). Moving from traditional to agile software development methodologies
also on large, distributed projects. Procedia-Social and Behavioral Sciences, 175, 455-
463.
Rigby, D. K., Sutherland, J., & Takeuchi, H. (2016). Embracing agile. Harvard Business
Review, 94(5), 40-50.
Vacari, I., & Prikladnicki, R. (2015). Adopting agile methods in the public sector: a systematic
literature review. In Embrapa Informática Agropecuária-Artigo em anais de congresso
(ALICE). In: INTERNATIONAL CONFERENCE ON SOFTWARE ENGINEERING
AND KNOWLEDGE ENGINEERING, 27., 2015, Pittsburgh. Proceedings... Pittsburgh:
Pittsburgh University, 2015..
1 out of 13
[object Object]

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]