logo

Air Deployable Amphibious Vehicle: Design and Implementation of Fast Response Multiagency System

Assignment 3 is about system integration plan and system validation plan for the AIR DEPLOYABLE AMPHIBIOUS VEHICLE (ADAV) project.

13 Pages2833 Words53 Views
   

Added on  2023-06-11

About This Document

This document discusses the design and implementation of Air Deployable Amphibious Vehicle (ADAV), a fast response multiagency system that operates on land and water. It covers the specifications of the firefighting module, modular configuration, and system verification and validation plans. The document also includes information on the requirements of the system, such as being air deployable and having a modular configuration.

Air Deployable Amphibious Vehicle: Design and Implementation of Fast Response Multiagency System

Assignment 3 is about system integration plan and system validation plan for the AIR DEPLOYABLE AMPHIBIOUS VEHICLE (ADAV) project.

   Added on 2023-06-11

ShareRelated Documents
AIR DEPLOYABLE AMPHIBIOUS VEHICLE
Name of Student
Institution Affiliation
Air Deployable Amphibious Vehicle: Design and Implementation of Fast Response Multiagency System_1
Contents
INTRODUCTION.....................................................................................................................................3
Methodology.........................................................................................................................................3
The scope of the research.....................................................................................................................4
THE REQUIREMENT OF THE SYSTEM.....................................................................................................4
Air Deployable...................................................................................................................................4
Amphibious Vehicle...........................................................................................................................4
Modular configuration.......................................................................................................................4
The specifications of the firefighting module....................................................................................5
Generals............................................................................................................................................5
Specification of the pump..................................................................................................................5
Plumbing............................................................................................................................................5
WATER TANK.....................................................................................................................................6
Storage units......................................................................................................................................7
The storage of fuel.............................................................................................................................8
Chain Saw..........................................................................................................................................8
Suction Hose Stowage.......................................................................................................................8
Liter Esky...........................................................................................................................................8
The appliance trays............................................................................................................................8
Electrical and the Instrument............................................................................................................8
Work Lights........................................................................................................................................9
Summary...........................................................................................................................................9
THE SYSTEM VERIFICATION PLAN..........................................................................................................9
Inspection requirements.......................................................................................................................9
Testing requirements............................................................................................................................9
The analytical requirement..................................................................................................................10
Certification requirements..................................................................................................................10
SYSTEM VALIDATION PLAN..................................................................................................................10
System engineering management plan...............................................................................................10
The general proposal...........................................................................................................................11
REFERENCES........................................................................................................................................12
Air Deployable Amphibious Vehicle: Design and Implementation of Fast Response Multiagency System_2
INTRODUCTION
There has been a request by the authorities of the Australia to have in the existence a design
and the implementation of those fast response multiagency systems. This system has come to
be known as the Air Deployable Amphibious Vehicle, ADAV. This vehicle is designed in
such away that it can operate both on the land and in the water. It is usually introduced into
the field through the crafts and the preferred craft has been 22 RAAF airbases that is in the
Australia. The deployment of the ADAV is done through the delivery system that is called a
sled. The sled can be from the cargo, truck or the helicopter. The agencies have modules each
attached to the ADAV using the mounting system. This mounting system allows the
government agencies to respond with necessary equipment’s and tools during the
emergencies.
Methodology
The principle of the system engineering will be used to design and to facilitate the
development and bvarification of the ADAV system.
Figure 1: INCOSE engineering standard systems
Air Deployable Amphibious Vehicle: Design and Implementation of Fast Response Multiagency System_3
The scope of the research
The document focuses on the investigation of the Fire Fighting Module that can be
effectively be fitted into the ADAV.In the past the system requirements had been made for
the similar system but to ensure that the clarity purposes within the documents are achieved,
there will be second mentioning the lists.
There will be the development of the system verification plan
There will be the development of the system validation covered in the same document.
THE REQUIREMENT OF THE SYSTEM
The firefighting module of the Advowsons requirements have been developed in the
assignment two documents and required one is as shown below.
Air Deployable
It must be able to withstand the forces that are encountered during the deployment using the
aircraft. This is per the documentation of the assignment two.
Amphibious Vehicle
The vehicle is expected to operate on the land, water and this includes the adaptability to the
variation of the land and water terrain while making the reference to the assignment two. All
the ADAV connecting systems and the modules have IP66 ratings. The other characteristic
considered here is the durability of the ADAV systems to MIL-STD-810 while concentrating
on the vibration and shock profiles which are deemed fit for the terrain movement.
Modular configuration
The desired features included the systems with the mating faces or the points. The mounting
and the quick release systems in the ADAV are very important. This is a self-contained
module. The system also functions in such a way that it can accept firefighting module and
the other three personals.
Air Deployable Amphibious Vehicle: Design and Implementation of Fast Response Multiagency System_4

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
System Conceptual Design - PDF
|12
|3146
|219

Software Engineering: SRS Document, Process Model, Use Cases, and More
|35
|8787
|395