Analyzing the Success of the Bandra Worli Sea Link Project
Verified
Added on  2022/12/01
|13
|2789
|428
AI Summary
This report analyzes the success of the Bandra Worli Sea Link project, including its planning, execution, and impact on transportation in Mumbai.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Running head:ANALYSING THE SUCCESS OF THE BANDRA WORLI SEA LINK PROJECT ANALYSING THE SUCCESS OF THE BANDRA WORLI SEA LINK PROJECT Name of the student: Name of the university: Author Note:
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
1ANALYSING THE SUCCESS OF THE BANDRA WORLI SEA LINK PROJECT Table of Contents 1.0 Introduction..........................................................................................................................2 2.0 Evidence of Research...........................................................................................................2 3.0 Development of Discussion.................................................................................................5 4.0 Improvements or Innovation................................................................................................8 5.0 Conclusion............................................................................................................................9 6.0 References..........................................................................................................................10
2ANALYSING THE SUCCESS OF THE BANDRA WORLI SEA LINK PROJECT 1.0 Introduction The success or failure of a project depends on significant constraints that are associated with the project from the planning of the project until its execution. These constraints are identified as the project planning phases, necessary scope of the project, resourcesassociatedwiththeproject,riskmanagementtechniques,controllingand monitoring, communication and the overall management of the project. The success as well as the failure of the project significantly depends on these factors. This report will deal with the overall analysis of a successful project that is theBandra Worli Sea Linkproject(BOSE 2019). This project is identified to be successful in terms of significant facts that are associated with the overall planning of the project until its successful completion. This projectissignificantlyidentifiedasasuccessprojectinaccordancetotheproject managementtriangleortheIronTriangle.Thistrianglestatesthattherearecertain constraints, which are very important in respect to the success of a project. The further sections of the report will deal with the overall aspects that will justify the project as a successful one. 2.0 Evidence of Research Some of the significant researchers with the stated project depicts this project to be an engineering marvel as well as architectural wonder too. This bridge is one of its kind present withinthecountryofIndia(Othman&Ahmed2015,p.730-746).Thesignificant specificationsoftheprojectisdepictedasthelengthoftheoverallbridgeandthe infrastructure of the bridge, which is very unique that it is open sea project. The length of the bridge is about 5.6 km with eight connecting lanes. The approximate budget that was required
3ANALYSING THE SUCCESS OF THE BANDRA WORLI SEA LINK PROJECT for the completion of the overall project is Rs. 1600-crore. This bridge connects Bandra and Worli and is built on the Arabian Sea. The construction of the bridge accompanied around 2850 workers as well as 150 extremely knowledgeable and skilled engineers that helped in the overall construction of the project (Wissink 2015, p. 1-11). This project took a total time of approximately 8 years thus providing a successful bridge that helped the end users to avail this bridge from Bandra to Worli in just 8 minutes whereas before this took 45 minutes. This bridge mainly consists of twin concrete continuous box GirderBridge for the specified traffic of individual directions. Each individual bridge section except the portion of the cable strayed is identified to be supported on the piers that are significantly spaced around 50 meters apart. The steel that is required for the construction of the bridge mainly was provided by the potential organization of Steel Authority of India Limited (O Oliomogbe & J Smith 2014). The bridge is identified as one of the longest bridge in South East Asia. The significant success of the project depends on certain factors most likely is the appropriate planning of the project. The ground study of the project was well analysed by the skilled and knowledgeable engineers. The requirements of the project was duly identified by the engineers thus adhering the fact that the project does not gets interrupted while its in execution. The next success factor is depicted as the excellence of the construction in respect to the civil engineering field. The cable-stayed towers that are gracefully structured skywards is the most innovative technology that has accompanied in respect to the project, thus adhering the success of the overall project (Chouhan, Parthasarathy & Pattanaik 2017, p. 971-985). This project intended to upgrade the transportation system of the city and this intention is also successfully achieved in respect to the project. The project significantly brought a potential
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
4ANALYSING THE SUCCESS OF THE BANDRA WORLI SEA LINK PROJECT communication between the significant parts of the city thus decreasing the time as well as the traffic of the entire city. The cable stayed section that is used for the construction of the bridge is about 600m long that mainly possesses 250m cable with supported spans as well as two 50m approach spans that are depicted go be conventional. The significant smaller cable section is depicted to be 350m long as well as consists of 2 smaller cable stayed that possess 150m centrally spanned strings. There are 264 cables attached or associated within the infrastructure of the overall project. The overall planning of the project was distributed in the form of five packages that led to the effective planning of the project thus leading the project to be successful (Rai 2017). These packages are stated below: Package 1: The first step is associated with the construction of a flyover over the Love Grove junction at Worli. Package 2: The second step is associated with the construction of the cloverleaf interchange in respect to the Mahim Intersection. Package 3: The third step is associated with the construction of the solid approach road from the stated interchange to the Toll Plaza. Package 4: The fourth step is depicted to carry out the construction of the central cable stayed spans in respect to the northern as well as southern viaducts in respect to Worli until the Toll Plaza, which is present at the Bandra End. Package 5: Improvement in the Khan Abdul Gaffar Khan Road. The significant phase related with the package 4 is depicted as the large and main phase of the Bandra Worli Sea Link Project. The technical challenge faced by this phase is
5ANALYSING THE SUCCESS OF THE BANDRA WORLI SEA LINK PROJECT depicted as the usage of the Cable Stayed Bridge with the include of the viaduct approach thus extending them from Worli until the Toll Plaza present at the Bandra End. Moreover, the modern toll plaza construction was also a significant approach that is associated with the construction of this project. The primary structure of the overall bridge is depicted to use the two continuous box Girder Bridge that are made of concrete in regards to the traffic that are moving in particular directions(Jain,Grafe&Mieg2015,p.193-213).Thecable-stayedbridgeforthe construction of the project is depicted to be the important section associated with the project. 3.0 Development of Discussion The significant management of the overall project depicts that the project is a successful one. This implies the budget, the managing committee as well as the overall workers and engineers associated with the execution of the project (Koenig 2014, p. 126). This has led the project to be executed within the specified delivery as well as the post management of the bridge is also so efficient that the project is depicted to be a successful one. The overall budget of the project is identified as an approximate value of 1600 crores. The financing of the budget is stated to be very frequent in respect to the fact that the project did not faced any interruption in the overall procedure of execution (JUNQUEIRA & PMP 2016). This budget is used for the significant important resources such as the steel, concrete material, cable stayed components as well as the engineers and the workers that are implied are skilful as well as knowledgeable. This constraints and the usage of the budget in the perfect as well as proper manner helped the associated authorities to carry out the project in an effective way.
6ANALYSING THE SUCCESS OF THE BANDRA WORLI SEA LINK PROJECT The association of the significant stakeholders in respect to the different parts of the project is also emphasized as an important factors that helped in the success of the project. The association of the different government authorities like SAIL and knowledgeable engineers (associated with the pre planning or designing of the overall project) led the project to be a successful one. Moreover, the association of the electric supply corporations to provide a reliable as well as redundant power supply to the project in regards to the overall execution of the project also helped the construction procedure to be enhanced and amplified for the successful delivery of the project. The maintenance of the overall project is depicted to be one of the significant step associated with the success of the project. The overall toll collection procedure at the bridge emphasizes on the fact that the project will be maintained on the revenue generated by the vehicles that uses the bridge for commuting from Bandra to Worli. This project is one of the significant important project associated in the field of civil engineering as it consists of a unique planning and development procedure in respect to its design as well as the area in which it is being constructed (Othman 2014, p.73-84). This project is also stated to portray the concept of the Intelligent Bridge System with the help of the effective Toll management system. There are mainly three types of the toll
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
7ANALYSING THE SUCCESS OF THE BANDRA WORLI SEA LINK PROJECT stations associated within the project. The first one being the fully automated system that is online mode of payment is accepted while paying for the toll tax (Tikote et al. 2017). The second one being the semi-automated system that provides the facility of paying the toll tax with the use of smart cards. The third variant is depicted as the manual toll collection that means the mode of cash payment at the tool stations. The usage of the three types of toll collection procedure make the movement of the traffic within the bridge to be very easy thus decreasing the time of commuting from one place to another. This feature is identified to be one of the important characteristic, which makes this project to be a successful one. The foundation of the bridge includes the 604 large diameter shafts that are quite capable of adapting to the significant geotechnical conditions, which makes the bridge reluctant of any natural disaster to a certain extent. The bridge appears to possess a super structure with some significant spans as well as the horizontal and vertical curves (Sam 2017). The concept of any superstructure within the field of civil engineering lies in the fact of its foundation. The foundations laid by the project management committee helps the bridge to be enough strong for any challenges related to the natural disaster in future. This helped the bridge to be sustainable in terms of the natural disasters thus helping the commuters to be safe while they are travelling on this bridge. The overall structure for the foundation of the project is provided in the below stated figure.
8ANALYSING THE SUCCESS OF THE BANDRA WORLI SEA LINK PROJECT
9ANALYSING THE SUCCESS OF THE BANDRA WORLI SEA LINK PROJECT 4.0 Improvements or Innovation The significant improvement that can be made within the project is stated to be the fact of the improvement in environmental regulation that were not completely adhered while the project was executed. A relevant survey must be carried out and necessary steps are to be implied to cope with the necessary environmental regulations that must be adhered by the project. Moreover, the construction of the bridge may also help to be a tower of surveillance as it too big. A significant security system may be implied on the bridge that may focus on the overall parts of the bridge as well as to some extent of the city until the reach is possible. It may also help in the coastal securities with the help of the high-end security cameras installed in the bridge. These future scopes may be emphasized for making the significant project to be enhanced as well as advanced in respect to the management of the overall construction procedure. 5.0 Conclusion Thus, the overall report states the significant characteristics of the construction project that depicts the project to be a successful one. The emphasis of the report on the construction procedure of the overall bridge is depicted to be the important sector that leads the project to be a successful one. Moreover, the success of the project lies in the fact of the usage and satisfaction of the end users and the emphasis of this report helps to identify many factors that resembles that the users are satisfied with the project. The management as well as the competent authorities associated with the overall project construction helps the project to be a successful one. Thus, it can be concluded that theBandra Worli Sea Link Project is a successful one in regards to its construction, management as well as meets up the overall desire of the end user, hence stating it to have a great emphasis on the communication of the vehicles from one part of the city to the another.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
10ANALYSING THE SUCCESS OF THE BANDRA WORLI SEA LINK PROJECT
11ANALYSING THE SUCCESS OF THE BANDRA WORLI SEA LINK PROJECT 6.0 References BOSE,M.(2019).Bandra-WorliSeaLinkProject.[ebook]Availableat: http://nopr.niscair.res.in/bitstream/123456789/7515/1/SR%2047%283%29%2029-33.pdf [Accessed 5 Sep. 2019]. Chouhan, H.A., Parthasarathy, D. & Pattanaik, S., 2017. Urban development, environmental vulnerability and CRZ violations in India: impacts on fishing communities and sustainability implications in Mumbai coast.Environment, Development and Sustainability,19(3), pp.971- 985. Jain, J., Grafe, F.J. & Mieg, H.A., 2015. Mumbai, the megacity and the global city. InInstitutional and Social Innovation for Sustainable Urban Development(Vol. 193, No. 213, pp. 193-213). ROUTLEDGE in association with GSE Research. JUNQUEIRA, L.E. & PMP, M., 2016. SUCCESS AND FAILURE OF INFRASTRUCTURE CONSTRUCTION PROJECTS. Koenig, D., 2014. 7. Reconstructing and Improving Livelihoods among the Urban Displaced: Lessons from Mumbai, India.Lose to Gain, p.126. O Oliomogbe, G. & J Smith, N., 2014. Value in megaprojects.Organization, technology & management in construction: an international journal,4(Special Issue), pp.0-0. Othman,A.A.E.,2014.Aconceptualmodelforovercomingthechallengesofmega construction projects in developing countries.African Journal of Engineering Research,2(4), pp.73-84. Othman, E. & Ahmed, A., 2015. Challenges of mega construction projects in developing countries.Organization,technology&managementinconstruction:aninternational journal,5(1), pp.730-746.
12ANALYSING THE SUCCESS OF THE BANDRA WORLI SEA LINK PROJECT Rai, S., 2017. Making of Bandra-Worli Sea Link. InMobility Engineering(pp. 49-58). Springer, Singapore. Sam, S., 2017.Negotiating The Right To The City: A Case Study of the Koli Community in Mumbai(Doctoral dissertation). Tikote, R.H., Magdum, M.M., Khandare, M.A. & Student, P.G., 2017. Delay Analysis in Industrial Projects by Using Relative Importance Index Method.International Journal of Engineering Science,13214. Wissink, B., 2015. Enclave urbanism in Mumbai: An actor-network-theory analysis of urban (dis) connection.Geoforum,47, pp.1-11.