This assessment provides a scenario on how to Manage Project Procurement. It covers procurement requirements, procurement management plan, procurement procedures, legal obligations of contracts, and more.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Assessment 1 of 2 To be administered by the Trainer/Assessor after the completion of all formal information presentation Course and Code:BSB50815Diploma of International Business Unit/s of Competency:BSBPMG518 Manage Project Procurement *Student Name: Assessment Type:Scenario, Assignment, Report *Student No:Your Submission date will be what is shown in ACCIT Moodle after it is submitted for grading. (Not the draft submission date). *Assessor Name: *This fields are required to be filled ALLQUESTIONSMUSTBEANSWERED. TOANSWERTHEQUESTIONS,USETHISDOCUMENT. Assessment 1 –BSBPMG518: Manage Project Procurement Please completethis assessment and submit for marking. This forms part of your assessment for BSBPMG518 Manage Project Procurement. The following documents are related to this unit. BSBPMG518 Unit of Competency BSBPMG518Learner Guide Word count ABN:80 126 576 896National Provider Code:91412CRICOS Code:02978C Version:3.0Doc ID:SPAI-1305050396- 8050 Page1of37
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
In this assessment some of the questions include a word count. This is a guideline only, but your answers should not vary substantially (i.e. +/- 10%) from the word count provided. Microsoft Word includes a word count tool. Reasonable Adjustment Whilstreasonableadjustmentscanbemadeintermsoftheway inwhichevidenceof performance is gathered, the evidence criteria for making competent/not yet competent decisions (and/or awarding grades) cannot be altered in any way. That is, the standards expected are the same irrespective of the group and/or individual being assessed; otherwise comparability of standards will be compromised. Please consult your trainer or the Director of Studies if you have any questions or special needs. Instructions to the Student Please read all the information given to you before you start this assessment. If you do not understand some or all the questions, please discuss them with your trainer/ assessor. Answer all questions in your own words. The questions are designed to assess your understanding of the unit as well as your underpinning knowledge. Please follow the below mentioned instructions before starting the assessment. This is not a group assessment. Submit the assessment individually unless instructed otherwise. Submitted documents must have the following criteria. Font must be Times New Roman, Font Size needs to be 12, line spacing must be Single line. Assessment Requirements Students must answer all questions and demonstrate all required skills to a satisfactory standard. If you do not answer some questions, and are therefore deemed to beNot Yet Satisfactory, your trainer/ assessormay ask you supplementary questions to determine your competence. Should you still be deemedNot Yet Satisfactory,you will have the opportunity to undertake a supplementary assessment or appeal the result. ABN:80 126 576 896National Provider Code:91412CRICOS Code:02978C Version:3.0Doc ID:SPAI-1305050396- 8050 Page2of37
This assessment is intended to be equitable, fair and just.If you feel that the college should change any aspect of this assessment to be fair, equitable or just, immediately contact your assessor who will attempt to make alterative arrangements. Submission details When you are ready to submit your assessments, upload the files in ACCIT Moodle, either by dragging and dropping your assessment into the space provided or browsing the files on your computer. Upload this assessment online in ACCIT Moodle once you have completed your assessment with all required evidence attached. It is important that you keep a copy of all electronic assessments submitted to ACCIT Moodle. Note:Please submit all assessment components in one file, or with as few attachments and separate documents as possible; i.e. do not include templates or emails in separate documents – place them all in the one document. Performance objective The students need to understand how to determine procurement requirements, establish agreed procurement processes, conduct procurement activities, implement and monitor procurement, and manage procurement finalisation procedures. Assessment description ABN:80 126 576 896National Provider Code:91412CRICOS Code:02978C Version:3.0Doc ID:SPAI-1305050396- 8050 Page3of37
This assessment provides a scenario on how toManage Project Procurement. To complete this assessment successfully answer the questions in as much detail as possible. Scenario The scenario will be a continuation of the case study from the previous unit in which the student has to solve tasks related to managing the project scope. This unit will take us one step further into researching and managing the procurement of required services.The services are requiredto realize the project of updating the information system database with the goal of establishing better control over the condition and status of the stock material for the TruEco’s retailers. It has been decided that the task will fall onto an outsourced software development team which will then develop a solution. Question 1 ObjectivesIdentify procurement requirements with input from stakeholders as basis for procurement planning Work with others to determine procurement requirements and ABN:80 126 576 896National Provider Code:91412CRICOS Code:02978C Version:3.0Doc ID:SPAI-1305050396- 8050 Page4of37
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
produce a procurement management plan for a project Carry out procurement and contracting activities according to agreed processes Monitor activities across a project's life cycle and resolve issues that could affect achievement of project objectives Document a review of procurement management processes and procedures Organise, evaluate and critique ideas and information from a range of complex texts Develop plans using vocabulary, structure and conventions appropriate to text Create documents for external use using required format and vocabulary suitable for audience Draft requests for approvals using organisational formats Participate in verbal exchanges using clear language to seek and provide information, or request approvals Use active listening and questioning techniques to confirm understanding Recognise cost parameters and interpret numerical information accordingly Select and use appropriate conventions and protocols when communicating with internal and external stakeholders to seek or share information Sequence and schedule complex activities, monitor implementation and manage relevant communication Make decisions based on analysis of options against set criteria Describe the general features of a procurement management plan Summarise procurement procedures and required documentation Explain the general conditions and legal obligations of contracts as they relate to project procurement ABN:80 126 576 896National Provider Code:91412CRICOS Code:02978C Version:3.0Doc ID:SPAI-1305050396- 8050 Page5of37
A)Identify the objectives of your project.(within 60-80 words) B)Identify all the stakeholders within TruEco’s project and document their expectations and suggestions for the procurement requirements.(within 80-100 words) C)What will you need to consider prior to planning procurement?(within 60-80 words) D)Explain what is meant by the following procurement requirements: Analysis of work breakdown structure Budget review Organisational procurement policy and procedures Resource analysis Resource types Service level agreements Specifications and performance requirements for goods and services Statement of work Vendor supply options available (within 60-80 words for each) A)The project is based on the development and upgrading of a new system for understanding the processes in which they could keep a track of their stock levels and monitor the activities of the retail store. The other most important objective set for the project is to provide a notification to the store manager whenever the stock of a certain product would get replenished. B)The different stakeholders within the project are: 1.The Retail Store Manager– They would expect that the new system would be able to bring about massive kind of changes with upgrading of the system infrastructure. 2.Logistics Departmental Manager– They would expect a simplified information database system, which would help in understanding the levels of stock within the retail store. 3.Database Developers– The database developers would expect that the project would be able to meet to the requirements provided by the retail store manager. This ABN:80 126 576 896National Provider Code:91412CRICOS Code:02978C Version:3.0Doc ID:SPAI-1305050396- 8050 Page6of37
information system should have some kind of automation features that would add capability to the managers for producing relevant information about stocks. C)Before the plan for making procurement, some of the needs that should be considered are: 1.Needs of the retail store– The current problems should be analysed and hence the database developers should proposed solutions. 2.Budget– After planning over the possible solutions, the budgetary considerations should be made efficiently. 3.Suitable technologies– The database developers should design the necessary documents for providing update to the retail manager about the most possible technology. D)1. The analysis of work breakdown structure for procurement requirements helps in understanding the factors based on which the different items would be procured before the progress over the project. The WBS also helps in understanding the different levels within the working factors within the industry. 2. Budgetary considerations form an important factor for procuring of required items. The items that need to be procured for the store should be purchased within a certain budget. Any kind of out-of-scope budget should be reported immediately to the retail store manager for taking into consideration. 3. The procured items should meet according to the policy and procedures set by the organisation. Any of the procured items, which would not be following according to the norms of the organisation should be returned immediately. 4. After the business requirements have been set, an analysis should be made about the different type of resource that would be set for the project. 5. The different type of resources should be mentioned properly. This could be in the type of human resource, material resource or budgetary resource. These different resource types should be selected properly and should be provided to the approval over the resource types. 6. During procuring of the required items, a certain kind of SLA should be signed between the retailer who is procuring the items and supplier of goods and other ABN:80 126 576 896National Provider Code:91412CRICOS Code:02978C Version:3.0Doc ID:SPAI-1305050396- 8050 Page7of37
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
services. The SLA also provides an assurance that each of the procured items would be meeting with the standards expected by the retail store. Any kind of discrepancy should be reported to the supplier as per the set norms of the policy. 7. Each of the goods and services that would be procured should be checked for their specifications and the requirements necessary for meeting with the performance standards. 8. A SOW can be defined as routine document that would help the project manager to understand the working capabilities of different people employed over a certain task. Specific activities, timelines and deliverables that would be provided to the vendor would also help in improving the services that would be offered to the client. 9. The different vendor supply options that are available should be selected in advance. The options that would be available for procurement of resources should be collected from vendors. ABN:80 126 576 896National Provider Code:91412CRICOS Code:02978C Version:3.0Doc ID:SPAI-1305050396- 8050 Page8of37
Question 2 ObjectivesEstablish and maintain, within delegated authority, agreed procurement-management plan Work with others to determine procurement requirements and produce a procurement management plan for a project Carry out procurement and contracting activities according to agreed processes Monitor activities across a project's life cycle and resolve issues that could affect achievement of project objectives Document a review of procurement management processes and procedures Understand responsibilities and boundaries of own role Sequence and schedule complex activities, monitor implementation and manage relevant communication Make decisions based on analysis of options against set criteria Describe the general features of a procurement management plan Summarise procurement procedures and required documentation Explain the general conditions and legal obligations of contracts as they relate to project procurement A)In accordance with the delegated authorities within the TruEco’s project, document your agreed procurement management plan, using diagrams if applicable, including information on the following areas: How procurement arrangements are communicated to stakeholders Process to be used for procurement of resources Process for monitoring and evaluating procurement related to the project Procurement objectives, strategies and time lines Resources to be obtained against a time line and budget Responsibilities for staff/team members. ABN:80 126 576 896National Provider Code:91412CRICOS Code:02978C Version:3.0Doc ID:SPAI-1305050396- 8050 Page9of37
Contract administration Contract closure processes Statement of work Procurement statement of work Potential risks and constraints Key performance indicators for procurement activities (within 100-120 words) A)1. The procurement arrangements that would need to be communicated to stakeholders could occur in the following ways – increasing the visibility factor for procurement activities and improving the engagement of stakeholders. 2. In the case of the particular case of procuring of goods for the retail store, the suppliers of goods should be negotiated and then the logistics providers should be contracted who would transport the goods to the retail store. 3. The procured materials should be monitored and evaluated based on meeting with the needs of the organisation. The materials, which have been procured should meet with the law and ethical standards set by the industry. 4. The retail manager who would be mainly responsible for managing the stock of items and procuring of new stocks should set certain kind of objectives, timelines and strategies. A strategy should be formed by the retail store manager based on procuring of the best kind of items for the store. Question 3 ObjectivesObtain information from suppliers capable of fulfilling procurement requirements Work with others to determine procurement requirements and produce a procurement management plan for a project Carry out procurement and contracting activities according to agreed processes Create and maintain procurement records and documentation according to requirements of project and organisation Document a review of procurement management processes and ABN:80 126 576 896National Provider Code:91412CRICOS Code:02978C Version:3.0Doc ID:SPAI-1305050396- 8050 Page10of37
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
procedures Organise, evaluate and critique ideas and information from a range of complex texts Develop plans using vocabulary, structure and conventions appropriate to text Create documents for external use using required format and vocabulary suitable for audience Draft requests for approvals using organisational formats Participate in verbal exchanges using clear language to seek and provide information, or request approvals Use active listening and questioning techniques to confirm understanding Select and use appropriate conventions and protocols when communicating with internal and external stakeholders to seek or share information Sequence and schedule complex activities, monitor implementation and manage relevant communication Make decisions based on analysis of options against set criteria Describe the general features of a procurement management plan Summarise procurement procedures and required documentation Explain the general conditions and legal obligations of contracts as they relate to project procurement A)What sort of suppliers will you need to use within the procurement processes and why? (within 60-80 words) B)How will you intend to obtain information from potential suppliers in order to determine selection and what information will you request? How does this link to the project’s objectives?(within 60-80 words) C)What are your selection criteria for selecting suppliers? List in order of importance and explain the reasons for this order. Are there any criteria essential criteria and if so, which and why?(within 80-100 words) A)In order to manage the procurement processes, wholesalers and distributors should be ABN:80 126 576 896National Provider Code:91412CRICOS Code:02978C Version:3.0Doc ID:SPAI-1305050396- 8050 Page11of37
selected. The primary reason behind this is that they would firstly have a strong supply of products from which the process of procurement would be made easy. This is due to the fact that the stock of goods would be replenished soon by the wholesalers whenever the retail store manager would place a request for an order. B)In order to obtain information about a certain product from the potential suppliers, a particular criteria should be set. The vendors would then show the different products, which would be requested. Based on the goods shown, the retail store manager would select the goods and then finalise the selection of goods with a proper pricing. Thus, the demands of customers from the store would also be need to be taken care of during the procurement process. C)The selection criteria for the selection of suppliers are discussed as: 1.Safety and Quality of supplied goods– The quality of goods supplied would determine the authenticity of the supplier. Hence, the supplier should provide high quality of goods to customers in order to maintain their reputation. 2.Risk Responsibility– Any kind of defective product that would be supplied to retail stores would be the sole responsibility of the vendor. Hence this factor should also be greatly considered during selecting the supplier. Question 4 ObjectivesDetermine or adopt established selection processes and selection criteria, and communicate to vendors to ensure transparency Obtain relevant approvals for procurement processes to be used Work with others to determine procurement requirements and produce a procurement management plan for a project Carry out procurement and contracting activities according to agreed processes Create and maintain procurement records and documentation ABN:80 126 576 896National Provider Code:91412CRICOS Code:02978C Version:3.0Doc ID:SPAI-1305050396- 8050 Page12of37
according to requirements of project and organisation Document a review of procurement management processes and procedures Develop plans using vocabulary, structure and conventions appropriate to text Create documents for external use using required format and vocabulary suitable for audience Draft requests for approvals using organisational formats Participate in verbal exchanges using clear language to seek and provide information, or request approvals Use active listening and questioning techniques to confirm understanding Select and use appropriate conventions and protocols when communicating with internal and external stakeholders to seek or share information Describe the general features of a procurement management plan Summarise procurement procedures and required documentation Explain the general conditions and legal obligations of contracts as they relate to project procurement A)From whom within the organisation do you have to obtain approvals for the procurement processes you wish to use for the project?(within 40-60 words) B)Describe the procedure in place within TruEco’s project for obtaining approvals including information, where applicable, about: The format of the proposal (written, verbal, electronic, paper-based) To whom it is directed (this may depend on a designated cost ceiling) The form on which it is submitted (possibly a standard template–please refer to the Appendix) The time scale in which it must be submitted The content of the proposal which may include: Reasons for the specific procurement processes requested Cost implications and whether they adhere to the budget you were given for ABN:80 126 576 896National Provider Code:91412CRICOS Code:02978C Version:3.0Doc ID:SPAI-1305050396- 8050 Page13of37
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
procurement processes and if not, why not? How they relate to the project objectives Selection criteria and how it relates to the project objectives and the organisation’s business ethics Any legal compliance or regulations Potential risks, constraints and relevant contingency plans Ethical considerations Environmental impact Transparency Time lines for selection processes Market restrictions Benefits to the project of these processes Prepare a report addressing all the above points.(within 80-120 words) A)In order to gain an approval over the procurement processes for the retail store, approval should be sought from the retail store manager. A list of the procurable items would be made and thus a final budget would be procured accordingly. Based on their approval, the list would be sent to the warehouse or the vendor who would supply the goods. B)The proposal for obtaining approvals for the procurement of items would be presented in a paper-based format. It would be directed to the Retail store manager. The procurement processes within the organisation would be mainly aimed at replenish the stock of items that would be in demand by customers. In order to handle the entire process of keeping a record of the stock of the items, a proper computerised system should be set at the retail store. The database would store the items that would be present within the store. In case any item that would be nearing towards ‘out of stock’ status, the system would automatically provide notifications. The aspect of regulations and legal compliance would also be put in order to maintain the quality of products. ABN:80 126 576 896National Provider Code:91412CRICOS Code:02978C Version:3.0Doc ID:SPAI-1305050396- 8050 Page14of37
Question 5 ObjectivesIdentify and act according to probity and project-governance constraints Work with others to determine procurement requirements and produce a procurement management plan for a project Carry out procurement and contracting activities according to agreed processes Document a review of procurement management processes and procedures Organise, evaluate and critique ideas and information from a range of complex texts Understand responsibilities and boundaries of own role Sequence and schedules complex activities, monitor implementation and manage relevant communication Make decisions based on analysis of options against set criteria Describe the general features of a procurement management plan Summarise procurement procedures and required documentation Explain the general conditions and legal obligations of contracts as they relate to project procurement Explain probity and project governance constraints that relate to project procurement in a project and industry context A)What does the standard code of ethics outline in relation to procurement? (within 40-60 words) A)A standard code of ethics in relation to procurement of goods would be considered as to be useful as it outline the particular laws during procurement of goods from suppliers. Based on this code of ethics, a supplier and retailer would be bounded within a certain ethical way in order to supply goods. This ethical code would also be required to maintain the quality of goods. ABN:80 126 576 896National Provider Code:91412CRICOS Code:02978C Version:3.0Doc ID:SPAI-1305050396- 8050 Page15of37
Question 6 ObjectivesCommunicate agreed proposals and/or specifications to prospective vendors to ensure clarity of understanding of project objectives Solicit vendor responses according to proposal requirements Work with others to determine procurement requirements and produce a procurement management plan for a project Carry out procurement and contracting activities according to agreed processes Document a review of procurement management processes and procedures Develop plans using vocabulary, structure and conventions appropriate to text Create documents for external use using required format and vocabulary suitable for audience Draft requests for approvals using organisational formats Participate in verbal exchanges using clear language to seek and provide information, or request approvals Use active listening and questioning techniques to confirm understanding Select and uses appropriate conventions and protocols when communicating with internal and external stakeholders to seek or share information Sequence and schedules complex activities, monitors implementation and manages relevant communication Makes decisions based on analysis of options against set criteria Describe the general features of a procurement management plan Summarise procurement procedures and required documentation Explain the general conditions and legal obligations of contracts as they relate to project procurement A)List all the information for prospective vendors that could be included in any request for quotation. ABN:80 126 576 896National Provider Code:91412CRICOS Code:02978C Version:3.0Doc ID:SPAI-1305050396- 8050 Page16of37
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
B)What additional questions could be asked of prospective vendors in a more in-depth request for proposal, and what specific questions in relation to your project? (within 100-120 words) C)What are the guidelines for preparing an RFQ/RFP?(within 100-120 words) D)What other instructions/assistance should you provide to prospective vendors in the RFQ/RFP?(within 100-120 words) A) The date of closing for submission, issuing date and RFQ number The issuer name, location, address and contact details The contact details of the person based on solving of queries based on commercial and technical The detailed delivery instructions and delivery address B) Is there a project lead or project manager for the project? Are the key project evaluators and stakeholders have been chosen clearly? Is a proper budget established for the project? Is a proper kind of RFP request being placed? Who would be the crucial kind of deal-breakers? What are the end goals of the entire procurement processes? What are the certain determining factors that would determine the success criteria of the entire process of procurement? What are the certain processes of audit based on the determining that proper products are being procured? Are proper kind of sub-contractors being hired for the procurement processes and during the logistics part? C) There should be an inclusion of deadlines, the mailing address of the company, queries regarding the contact person during the preparing of an RFP An executive summary and an introduction should be provided. ABN:80 126 576 896National Provider Code:91412CRICOS Code:02978C Version:3.0Doc ID:SPAI-1305050396- 8050 Page17of37
Each of the sections that would be included within the RFP should have a detailed explanation and justification The assumptions for the procurement processes should be listed. The constraint for the vendors should be provided within the guidelines. Any kind of terms and conditions that would be set for the procurement process should be listed and followed up accordingly. D) The requirements as defined by the retailer should be matched accordingly to the number of items within the warehouse. Each of the items that would be sent to the retail stores should be secured in advance whenever a request is placed. The logistics team should be hired after the items have been arranged for transportation. Each of the items that have been seen selected for transportation should be packed properly so as not to dispose them. The budget breakdown of each of the items that have been procured and the costs of logistics should be put together and sent to the retailer for calculating of bill and paying off. Question 7 ObjectivesEvaluate responses and select preferred vendors according to current legal requirements and agreed selection criteria Work with others to determine procurement requirements and produce a procurement management plan for a project Carry out procurement and contracting activities according to agreed processes Document a review of procurement management processes and procedures Organises, evaluates and critiques ideas and information from a range of complex texts ABN:80 126 576 896National Provider Code:91412CRICOS Code:02978C Version:3.0Doc ID:SPAI-1305050396- 8050 Page18of37
Develops plans using vocabulary, structure and conventions appropriate to text Creates documents for external use using required format and vocabulary suitable for audience Drafts requests for approvals using organisational formats Understands responsibilities and boundaries of own role Sequences and schedules complex activities, monitors implementation and manages relevant communication Makes decisions based on analysis of options against set criteria Describe the general features of a procurement management plan Summarise procurement procedures and required documentation Identify criteria that could be used to select vendors or suppliers Explain the general conditions and legal obligations of contracts as they relate to project procurement A)Using the table from theAppendix, evaluate the responses based on quality-quantity, price and delivery time from prospective vendors. For each product/service you require, select preferred vendor based on legal and ethical requirements, agreed selection criteria and added value. Compile a report to the relevant authority who makes the final decision on preferred vendors within your project or organisation detailing your recommendations for preferred vendors and your reasons for this selection. (within 150-200 words) A)The most preferred vendors who would be selected would be signed with a particular kind of contract. A certain recommendation that would be put for the preferred vendors is that the listed items would be procured in the best possible manner. The vendors should carefully check each of the items that would be requested from them. In case any item would not be present within the warehouse, a certain notification about the stock availability of the items would be sent to the retailer. After each of the items have been sorted, they would be packed together. They would also contain the logistics provider about the supply of goods to the retailer. ABN:80 126 576 896National Provider Code:91412CRICOS Code:02978C Version:3.0Doc ID:SPAI-1305050396- 8050 Page19of37
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Question 8 ObjectivesNegotiate with preferred contractor or supplier, to agree on terms and conditions of supply Work with others to determine procurement requirements and produce a procurement management plan for a project Carry out procurement and contracting activities according to agreed processes Document a review of procurement management processes and procedures Participates in verbal exchanges using clear language to seek and provide information, or request approvals Use active listening and questioning techniques to confirm understanding Select and use appropriate conventions and protocols when communicating with internal and external stakeholders to seek or share information Describe the general features of a procurement management plan Summarise procurement procedures and required documentation Explain the general conditions and legal obligations of contracts as they relate to project procurement A)Of the preferred vendors you have selected following your evaluation of their suitability, select the type of supply contract you intend to use and the terms and conditions of supply you desire from three of the vendors. Use the template from the Appendixand research and select at least three potential vendors for the project. (within 80-100 words) B)Identify the terms and conditions with which each vendor is not in agreement and with what they wish to replace them.(within 80-100 words) C)What, if any, are the terms and conditions your organisation is adamant must be in the supply contract.(within 60-80 words) ABN:80 126 576 896National Provider Code:91412CRICOS Code:02978C Version:3.0Doc ID:SPAI-1305050396- 8050 Page20of37
D)List and briefly explain a choice of five practices for good negotiation? A)The three potential vendors for the project are: 1. Vendors providing computer related applications such as hardware and software. 2. Vendors providing computer services 3. Vendors providing cell phones and related devices. B)The terms and conditions at which the vendor might not agree and might replace them are: 1. The logistics provider would not be recruited by the vendor or supplier of the product. Moreover, the logistic service provider should be appointed by the retailer and sent to the warehouse of the vendor. 2. The packaging of the goods would be done by the vendor. However, the cost of packaging would be included within the budget list. 3. The purchase order for the items should be provided in a bulk form. C)Any kind of terms and conditions that would need to be implemented within the supply contract would be implemented with a mutual kind of understanding between the vendor and retailer. This contract should be signed before making any kind of transactions. D) The power of listening during making good negotiation should be enhanced. The timing of making negotiations should be considered as to be highly important. A proper kind of approach should be made in order to frame the negotiation process. Question 9 ABN:80 126 576 896National Provider Code:91412CRICOS Code:02978C Version:3.0Doc ID:SPAI-1305050396- 8050 Page21of37
ObjectivesImplement established procurement-management plan and make modifications in line with agreed delegations Review progress and manage agreed variations to ensure timely completion of tasks and resolution of conflict within the legal framework of the supply agreement Work with others to determine procurement requirements and produce a procurement management plan for a project Carry out procurement and contracting activities according to agreed processes Organise, evaluate and critique ideas and information from a range of complex texts Document a review of procurement management processes and procedures Develop plans using vocabulary, structure and conventions appropriate to text Create documents for external use using required format and vocabulary suitable for audience Draft requests for approvals using organisational formats Participate in verbal exchanges using clear language to seek and provide information, or request approvals Use active listening and questioning techniques to confirm understanding Select and use appropriate conventions and protocols when communicating with internal and external stakeholders to seek or share information Describe the general features of a procurement management plan Summarise procurement procedures and required documentation Explain the general conditions and legal obligations of contracts as they relate to project procurement A)Use the tables from theAppendixto review and evaluate the objectives you set in your procurement management plan for effectiveness, highlighting areas for improvement and suggestions for modifications to the procurement processes in place. ABN:80 126 576 896National Provider Code:91412CRICOS Code:02978C Version:3.0Doc ID:SPAI-1305050396- 8050 Page22of37
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
B)For each modification, document the authorities or approvals required to implement the changes.(within 60-80 words) C)What, if any, disputes might arise from the modifications, including internally and externally?(within 80-100 words) D)What measures will you take to resolve the disputes?(within 80-100 words) E)Will there be any legal action required for any of the conflict resolution procedures? If so, what and why?(within 80-100 words) A)Mentioned in Appendix B)In the case of transportation to the final point of entry, it can be seen that the transportation would be made directly to the customers in case a certain customer would request for home delivery of services. C)Any kind of disputes that would be made to the modifications would be sought internally between the supplier and vendor. A contract would be signed previously based on making of modifications. In case, the violation of contract would be made, a court case could be claimed against the party making disputes and who would be at fault. D)In case of disputes, the retail store manager would be holding responsibility for resolving the cases of disputes. They would have to maintain a good communication and relationship with the supplier of goods so as to resolve the matter at the earliest and increase the business efficiency. On the other hand, the external disputes would have to be sought at court, which would be able to handle the cases. ABN:80 126 576 896National Provider Code:91412CRICOS Code:02978C Version:3.0Doc ID:SPAI-1305050396- 8050 Page23of37
E)During any kind of conflict resolution procedures, legal action could be sought in order to maintain a proper kind of law and order. Legal actions could be sought during cases of fraud and used products, if supplied to the retail store. Question 10 ObjectivesIdentify and report procurement-management issues and implement agreed remedial actions to ensure project objectives are met Work with others to determine procurement requirements and produce a procurement management plan for a project Carry out procurement and contracting activities according to agreed processes Document a review of procurement management processes and procedures Describe the general features of a procurement management plan Summarise procurement procedures and required documentation Explain the general conditions and legal obligations of contracts as they relate to project procurement A)Using the tables from theAppendixand the information from the review of your procurement management plan in Question 9, identify and report procurement management issues to the relevant authority and agree upon and obtain approvals for remedial action to resolve the issues. A)Mentioned in Appendix ABN:80 126 576 896National Provider Code:91412CRICOS Code:02978C Version:3.0Doc ID:SPAI-1305050396- 8050 Page24of37
Question 11 ObjectivesConduct finalisation activities to ensure vendor deliverables meet contracted requirements Work with others to determine procurement requirements and produce a procurement management plan for a project Carry out procurement and contracting activities according to agreed processes Document a review of procurement management processes and procedures Sequence and schedule complex activities, monitor implementation and manage relevant communication Make decisions based on analysis of options against set criteria Describe the general features of a procurement management plan Summarise procurement procedures and required documentation Explain the general conditions and legal obligations of contracts as they relate to project procurement A)Using each of the supply contracts, evaluate each vendor’s performance in relation to their contractual requirements. Identify any last-minute issues that may compromise the deliverables meeting the contracted requirements and put in place actions to ensure they do. Please use the tables provided in theAppendixsection. A)Mentioned in Appendix Question 12 ObjectivesReview project outcomes using available procurement records and information to determine effectiveness of procurement processes and procedures ABN:80 126 576 896National Provider Code:91412CRICOS Code:02978C Version:3.0Doc ID:SPAI-1305050396- 8050 Page25of37
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Work with others to determine procurement requirements and produce a procurement management plan for a project Carry out procurement and contracting activities according to agreed processes Document a review of procurement management processes and procedures Organise, evaluate and critique ideas and information from a range of complex texts Develop plans using vocabulary, structure and conventions appropriate to text Create documents for external use using required format and vocabulary suitable for audience Draft requests for approvals using organisational formats Sequence and schedule complex activities, monitor implementation and manage relevant communication Make decisions based on analysis of options against set criteria Describe the general features of a procurement management plan Summarise procurement procedures and required documentation Explain the general conditions and legal obligations of contracts as they relate to project procurement A)State all of the procurement records and information available to you to determine the effectiveness of procurement processes and procedures.(within 60-80 words) B)State the metrics you intend to use to measure the effectiveness of procurement processes and procedures. Please use the table provided in theAppendixsection. C)Using the tables ofQuestion 12, measure the effectiveness of your procurement processes and procedures with the metrics stated above and suggest ways in which they could be improved.(within 80-100 words) ABN:80 126 576 896National Provider Code:91412CRICOS Code:02978C Version:3.0Doc ID:SPAI-1305050396- 8050 Page26of37
A)Each of the procurement of items that would be performed should have an individual ID. The important documents that would be in relation to the procurement should be kept with the retail manager. On the other hand, a copy of the order list should also be kept at the vendor side. B)Mentioned in Appendix C)The measuring of the effectiveness within the procurement processes are: 1.Quality– The quality of the products that would need to be procured should be selected in advance. These products should be properly checked and thus quality should be matched with the standards set for quality. 2.Savings in cost– The products should be chosen in such a manner that it would lead to certain savings within cost based on transportation and packaging services. 3.Management speed– A certain checking system of each of the goods that would be managed and sent should be implemented. The team who would manage the shipment of products should be aware of the importance for delivery of goods. Question 13 ObjectivesDocument lessons learned and recommended improvements for application to future projects Work with others to determine procurement requirements and produce a procurement management plan for a project Carry out procurement and contracting activities according to ABN:80 126 576 896National Provider Code:91412CRICOS Code:02978C Version:3.0Doc ID:SPAI-1305050396- 8050 Page27of37
agreed processes Document a review of procurement management processes and procedures Develop plans using vocabulary, structure and conventions appropriate to text Creates documents for external use using required format and vocabulary suitable for audience Draft requests for approvals using organisational formats Describe the general features of a procurement management plan Summarise procurement procedures and required documentation Explain the general conditions and legal obligations of contracts as they relate to project procurement A)Using the evaluation of the effectiveness of your procurement processes and procedures from Question 12, write a lesson learned in a report format appropriate to the organisation, making recommended improvements for application to future projects.(within 150-200 words) A)Based on the understanding of the various strategies implemented during the procurement processes and the effectiveness required to manage each of the handling of items, it can be understood that such kind of procedures are highly critical in nature. Hence, the entire task of procurement, creating documents, signing of contracts and negotiations should be carried out properly. The understanding of the vendors and making negotiations with them would be considered as highly important. Approval and proper kind of signing of agreements should be done in advance before the goods would be sent to the retailers in advance and within deadlines. This wold help in replacing of goods before they would run out of stock. Based on the following certain kind of effective desired objectives, it could be concluded that it would be highly easy to impact the future of procurement services. It would also lead to improvement in the ways in which goods are received by customers from the retail stores. ABN:80 126 576 896National Provider Code:91412CRICOS Code:02978C Version:3.0Doc ID:SPAI-1305050396- 8050 Page28of37
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Question 4 Purchase Request Form Address:Company: TruEco Requested by: Retail Store Manager Date: 10.4.2019 Purchase order No.: 2345 Vendor Information: ItemQuantityDescriptionFundUnit PriceTOTAL Soap4Soaps are to be procured for stock replenishment $50$12$48 Hand wash6Hand wash are to be procured for stock replenishment $150$20$120 Shipping and Handling Cost: $5TOTAL: $183 Authorisation for Purchase: $10Final Approval: Retail Store Manager Bill To: VendorShip To: TruEco Question 7,8 Product/service required Potential supplier(s)Criteria in order of importance and score/weight Does supplier meet criteria? Overall score and any other added value information ABN:80 126 576 896National Provider Code:91412CRICOS Code:02978C Version:3.0Doc ID:SPAI-1305050396- 8050 Page30of37
1 2 3 4 5 6 7 8 9 10 1 2 3 Preferred suppliers in order of importance: Question 9 Procurement activityMet deadline/on schedule? If not, why not? Suggested modification to procurement management plan to meet deadline TenderingMet with deadlinesThese meetings should be performed in advance Selection of supplierMet with deadlinesThe supplier of goods should be ABN:80 126 576 896National Provider Code:91412CRICOS Code:02978C Version:3.0Doc ID:SPAI-1305050396- 8050 Page31of37
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
selected during procuring of items Transportation to final entry pointMet with deadlinesLogistics team should handle the handling of goods and services InsuranceMet with deadlinesInsurance should be covered for the project management team and logistics provider Services of InspectionMet with deadlinesAfter services have been restored, they should be continuously modified in order to support regular updates. Procurement activityWithin budget? If not, why not? Suggested modification to procurement management plan to meet budget requirements TenderingYesThe tendering should be set within the budget. Selection of supplierYesThe supplier should be selected based on rating and rate basis. Transportation to final entry pointYesThe transportation of the goods would be based on the logistics supplier InsuranceYesInsurance would be based on the kind of work being performed and the risk level impacts Services of InspectionYesInspection of procured goods should be done at a careful basis Procurement activityWithin budget? Yes/no On time? Yes/no Lessons learned TenderingYesYesThe tendering would be done after bids would be made over the project plan. ABN:80 126 576 896National Provider Code:91412CRICOS Code:02978C Version:3.0Doc ID:SPAI-1305050396- 8050 Page32of37
Selection of supplierYesYesThe selection of supplier of goods forms an important factor as this would help the retail store to replenish goods whenever it would be needed. Transportation to final entry point YesYesThis activity is highly crucial as based on this, the final output to customers would be provided. InsuranceYesYesInsurance should be present as this would help in protecting the security of work. Services of InspectionYesYesThe inspection services should be done in order to ensure that the quality of goods are highly maintained. Procurement activityProblem/issue faced or facing Reasons for issue Suggested modification to procurement management plan to resolve issue TenderingLate issuing of bidsAdvertisement should be set in regards to setting of bids Selection of supplierImproper filling of criteria’s for suppliers The supplier should be selected based on proper kind of analysis of their previous records Transportation to final entry pointUnavailability of logistic provider within budget The logistic provider should be selected based on their reputation and record history InsuranceLack of proper insurance provider company Insurance provider should be selected based on their reputation Services of InspectionGoods are not being inspected properly The inspection services should be selected based on their skill levels. Question 10 Procurement management issueProject objective not being metAuthority to whom the issue must be reported and format of report ABN:80 126 576 896National Provider Code:91412CRICOS Code:02978C Version:3.0Doc ID:SPAI-1305050396- 8050 Page33of37
Excessive cost of transportation of goods BudgetProject Lead Manager via email Improper items being sentCommunicationVendor via email Tender selection by vendorsCommunicationRetail store manager via direct communication. Procurement management issueRemedial action and agreement and approval from whom? Necessary procedure and time scale to resolve the issue Excessive cost of transportation of goods Budgetary planning and considerationQuality check meetings 1 week Improper items being sentChecking of items before transportation from warehouse Review meetings 2 days Tender selection by vendorsProper tender selectionQuality checking 1 day Question 11 Vendor No.: Contracted requirement not being met/unlikely to be met Action to be takenProcedure(s) necessary to implement action to be taken Inaccurate form of defined deliverables Setting of proper aims and objectivesThe needs of client and vendor should be sought clearly. Informal agreementsAgreements should be made before project plan The agreements that would be signed between the vendor and retailer. Inclusion of new assumptionsSetting of assumptions during project planning phase Inclusion of new assumptions would be done in accordance to the terms and conditions. Question 12 ABN:80 126 576 896National Provider Code:91412CRICOS Code:02978C Version:3.0Doc ID:SPAI-1305050396- 8050 Page34of37
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Metrics used to measure effectiveness SuccessesSuggested improvements to process QualityMeeting with the exact deliverables sent by retailer Quality of items should be checked carefully before sending to retail stores. Savings in costCost should be met properly and within the estimated budget The budgetary planning of each of the items that would be sought should have a proper cost estimation technique. Management speedManagement of listed orders in a quick speed with high accuracy level The speed of management of goods that would be shipped should be more accurate. Any further comments: Marking Sheet for Assignment: Manage Project Procurement Did the candidate Competent YesNo Answer all questions and address all the requirements specified in the Assessment Task? ☐☐ Student Submission Checklist: Assessor name is written on the first page☐ Student name is written on the first page☐ Student number is written on the first page☐ The student submits the assessment within the due date☐ ABN:80 126 576 896National Provider Code:91412CRICOS Code:02978C Version:3.0Doc ID:SPAI-1305050396- 8050 Page35of37
1.The student incorporates employability skills (such as communication, team work, problem solving, initiative, technology, self-management& learning) 2. ☐ The student usedthe required style for this document☐ Comments: Comments will be provided as feedback files or in ACCIT Moodle Result:☐Satisfactory☐Not Satisfactory ABN:80 126 576 896National Provider Code:91412CRICOS Code:02978C Version:3.0Doc ID:SPAI-1305050396- 8050 Page36of37
The declaration below will appear when you click submit in ACCIT Moodle assessment submission link. You must check the checkbox and click submit. A draft copy will not be accepted as submission. Student Declaration: This assignment is my own work, except where I have acknowledged the use of the works of other people. I have retained a copy for further reference. Assessor: I declare that I have conducted a fair, valid, reliable and flexible assessment with this student, and I have provided appropriate feedback Date: Signature: ABN:80 126 576 896National Provider Code:91412CRICOS Code:02978C Version:3.0Doc ID:SPAI-1305050396- 8050 Page37of37