Project Management Essentials: Smart City OS Case Study
Verified
Added on 2022/12/30
|23
|6636
|85
AI Summary
This report provides a consultancy report on the Smart City OS case study, focusing on project management essentials. It covers the skills of a project manager, relevant stakeholders, project triangle parameters, resource requirements, risk analysis, conflict management, and building a diverse team.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Table of Contents INTRODUCTION...........................................................................................................................3 TASK 1............................................................................................................................................3 The Project Manager..................................................................................................................3 TASK 2...........................................................................................................................................5 Problem Solving and Decision Making.....................................................................................5 TASK 3...........................................................................................................................................7 The Project Triangle...................................................................................................................7 Importance of Various Project Triangle Parameters.......................................................................7 TASK 4............................................................................................................................................9 Provide advice to the project manager on what resources may be required for this project and what could be an effective cost estimation technique for the Smart City OS project and explain why.................................................................................................................................9 TASK 5..........................................................................................................................................11 Develop a risk analysis by constructing a risk register for the Smart City OS project.............11 TASK 6..........................................................................................................................................15 Identify at least six conflicts that may arise when running the Smart City OS project and their sources. Critically discuss which actions can be taken by the project manager to resolve conflicts and suggest appropriate conflict management or negotiation strategies to address these...........................................................................................................................................15 TASK 7..........................................................................................................................................18 Critically discuss what the project manager can do to build a highly successful team for the Smart City OS project. In particular focus on the importance of how a diverse team can increase project performance. Critically reflect on what actions the project manager can take to build a diverse team for the Smart City OS project and what are some of the challenges of working in diverse teams..........................................................................................................18 CONCLUSION..............................................................................................................................20 REFERENCES..............................................................................................................................21
INTRODUCTION Project management is a process of keeping check on all the actions and activities undertaken for making the project a success and attaining all the agendas. In order to manage a project there are certain skills, knowledge, behaviours, methods, actions and related practices are implied by the project manager and the related stakeholders assigned to the work. Hence, the present report is a Consultancy Report on the The Smart City OS case study. According to the information provided in the case is based on a city in United Kingdom known as Hall which is trying to become Smart city from past many years and now with appropriate measures and practice the city has become the first fully fibre city of the UK. Now through the case it is identified the objective of the project is to increase and enhance data sharing and decision making activities which will allow the Council to deliver more effective services across the board from traffic management to health and social care. Thus, the project needs to be critically conducted and require number of areas to be evaluated and operated for attaining the aim of the assignment. Beginning with the skills of the project manager will be determined that are essential for making the project a success. Moving along stakeholder are identified and a stakeholder map is constructed as well as the project triangle parameters are discussed for knowing their impact on the project and succeeding in the motive of the Smart City OS. Furthermore, the resources required for the completion of the project from the initial stage to the end are determined and a risk register is constructed for seeking approaches to mitigate them and on the completion of the project. Lastly, some conflicts which can arise while completing the Smart City OS project are discussed along with similar approaches are suggested to management for reducing them and then the focus is made over the practices management will take in favour of developing a strong and diverse team to work on the project. TASK 1 The Project Manager The role of the Project Manager is remarkable in each and every sector. Project Manager is a individual who is responsible for the planning, organising, designing, executing and controlling the overall activities of a specific project and also ensure that they control the risk and minimise all the uncertainty(Arantes do Amaral, et. al., 2018).Project Manager need to be
a excellent and effective entrepreneurial mindset so that manager can support in context of technologies and maintain appropriate disciplines. Hull city considered the first full fibre city of United Kingdom which constantly upgrade itself over the last years to become the smart city and now maintain the position of fastest broadband city.There are many role and responsibilities which need to do by the project manager of smart city OS. Some basic roles and responsibilities such as resource planning, conducting and motivating the project team, time management, cost estimating and maintain the financial budget, managing project risk , deal with local authority and third party andmonitoring the whole process of project etc. are considered the main roles and responsibilities of project manager so there is a need to maintain each and every activities of project so its require some set of skills which are essential for project manager of smart city OS (Beerkens and Udam, 2017).The required skills which are mandatory for the Project manager of smart city OS are discussed below- Skills of Project ManagerEffective Communication –This skill is very demanding and appropriate for project managerofsmartcityOSbecauseprojectmanagerneedtocommunicatewith stakeholders and also conduct meeting time to time to provide and receive the appropriate details regarding the project of smart city. It is considered that 90 % work of project manager depend upon their communication so its communication skills are one of the most appropriate skills which need to develop.Balancing Creativity & Practicality –Project manager need to be very creative and well known all the practical aspects. Project manager need to maintain all the technological requirements and its resources and also design all the installations prospective of automation technologies and need to balance it(Brymer, Wulfhorst and Brunson, 2018).Negotiation –Project manager need to know the negotiation skills which helpful to deal with the suppliers and local and third parties which helpful to deal with conflicts and issues. Negotiation skills useful to improve the parties content and also work toward goals at all the specific time to make smart city. Risk Management –Project manager require to know how to manage risk properly. Project manage is responsible to identify the potential risk so that manager can maintain it in a appropriate way to make the smart city OS. Skills of Project ManagerPossible Actions
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Effective CommunicationSomepracticesarehelpfultodevelopeffective communicationskillsfortheprojectmanagerof smart city OS.. Listening, Hearing, Absorbing and alsoconsiderationareconsideredassomeuseful practices which need to use to become an effective communicator(Darling and Whitty, 2016). Balancing Creativity & PracticalityProject manager need to take some kind of possible actions like become a effective explainer, practice openness and keep asking relevant and new questions are helpful to develop the balancing creativity & practical skills. NegotiationProjectmanagerneedtostudysomecasestudy related to negotiation, consider the both parties view points and recognise the final goal clarity helpful to learn this skill. Risk ManagementProject need to consider some activities to develop risk management skills. These activities are technical awareness, ability to stay calm, strategic thinking, financial knowledge , ability to create relationship (Fadun and Saka, 2018). TASK 2 Problem Solving and Decision Making Identify Relevant Stakeholders in Smart city OS project There are many appropriate and relevant stakeholders in Hull smart city OS project which identified and also considered as a main reason of development of smart city. All the stakeholders contribution and their efforts are beneficial for the success of Hull smart city OS. The description of relevant stakeholders and their Engagement of these stakeholders in Hull smart city OS are given below -
The Council–In hull smart city OS, use internal stakeholders to engaging the public and also managing the stakeholders properly(Fionov and Mustafayev, 2018).Hull city engage with their internal stakeholder in a proper manner so that city easily encourage all the business and start ups to create the new and advanced technologies which also helpful to pull Hull into effective smart city. Some internal stakeholders such as assistant director of ICT for Hull city council , council members, other organisation like humberside Fire, Rescue service and university of Hull considered as the internal stakeholder of this smart city project.Investors –Hull smart city OS had a investor named as KCOM which invested £85 M in the Hull city and provide full fibre network. KCOM considered as a local telecom organisation which invest on Hull city to become the smart city in a specific way.Suppliers– Hull smart city also have many suppliers such as Connexin, Teletrac Navman, Citilogik System. In which Connexin smart Bin is the most effective suppliers which provide best services, Teletrac Navman serves GPS technologies and Citilogik system help in monitor the people movements. Pitney Bowes is one of them company which provide the facility of asset management software for the street furniture.Employees- All the employees which give their contribution in development of Hull smart City OS are essential and helpful to improve the conditional aspects of the design and infrastructure of the city and help to develop the Hull as a programmable city and useful to improve the service of technological delivery(Martens and Carvalho, 2017) . Population –The population of Hull city is around 260,000. All the population provided their acceptance to adopt some changes and make possible to become the Hull first Full Fibre City so the contribution of Hull city population to make that full smart city is valuable and significant. Stakeholder Map Stakeholders map considered as a visual representation of the appropriate relationship that stakeholders have with their project. But the relationship of stakeholders evolves over the time and can show on both side on stakeholders and project. Stakeholders map also called as stakeholder map matrix. Stakeholders map is helpful to identify the Hull smart city stakeholders involved and engagement which the project of hull smart city OS. The explanation of how Hull smart city engage their stakeholders with their smart city OS project are given below-
KeepInformed–Thisisconsideredasthefirststep ofstakeholdermapwhich demonstrate that hull smart city OS project keep informed some stakeholders such as the council , internal stakeholders and their investors because all these stakeholders engaged with each and every small and large activities of this smart city project. Internal stakeholder like assistant director and some investor KCOM local telecom company and most important suppliers likeConnexin helpful to provide their services time to time so that Hull smart city project need to keep informed and shared all the information with them(Mills and Tilley, 2020).Manage Closely –Some other stakeholders like Government, Local and national bodies, publicadvisorycommitteesandserviceprovidersconsideredasathatkindof stakeholders which need to manage closely. The involved of these stakeholders is big for the development of Hull smart city OS.Keep into account –Hull city maintained and kept some stakeholder in account. These stakeholderslikeemployees,investors,directors,boardsofdirectors,elected representatives. These stakeholders considered as a important stakeholders which need to keep in account list of the Hull smart city OS project. Meettheirneeds–Somestakeholderslikepopulationnearproject,jobseekers, vulnerable groups, universities and educational sectors considered as a that kind of stakeholders which helpful to meet the need of the Hull smart city OS project. The Hull smart city project maintains the specific relationship with their stakeholders so that city can easily convert into an effective smart city(Radujković and Sjekavica, 2017). TASK 3 The Project Triangle Importance of Various Project Triangle Parameters The task so that time to time systematically all the activities complete. The process includes some accurate estimation of time that specially needed to finish each and every task. Through Work Breakdown structure, Hull smart city project manager documents all the work efforts for each and every assign task roll .Cost is comes under the most essential element of this project
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
triangle. Project manager of Hull smart city OS estimated all the cost and prepared budget according to the expenses on the development of smart city. Some cost stated and some cost flexible according to the project. In this smart city project, project manager estimated many cost such as staff costs, subcontractor costs, machinery costs , resources costs, equipment rental costs and fixed and variable cost also generalised(Tabassi,et. al., 2016).Scope of the project of smart city also more because this generation belong to technologies. The time of the smart city project also essential because project manager need to complete all the project activities on time. Impact of possible changes to this smart city OS project Project Triangle Parameters also known as Triple Constraint or Iron Triangle. It is considered as a model and approach of the constraints which manage the project management activities. In project triangle parameters, 3 elements are containing which manage the smart city OS project of the Hull city. There are 3 elements involved in this project triangle which are discussed below-Time Constraint-Hull smart city OS project broken down into many tasks which required to complete on given time period and also create a good relationship between all the task so that time to time systematically all the activities complete. The process includes some accurate estimation of time that specially needed to finish each and every task. Through Work Breakdown structure, Hull smart city project manager documents all the work efforts for each and every assign task roll .Cost Constraints –Cost is comes under the most essential element of this project triangle. Project manager of Hull smart city OS estimated all the cost and prepared budget according to the expenses on the development of smart city. Some cost stated and some cost flexible according to the project. In this smart city project, project manager estimated many cost such as staff costs, subcontractor costs, machinery costs , resources costs, equipment rental costs and fixed and variable cost also generalised. Scope Constraint –Scope is considered as a formal statement of the Hull smart city OS project that is basically a combination of high level of requirement which set out and fixed in the original one which worked with both project chapter and also project plan. Scope is not easy and advisable task for the Hull smart city project manager. Changes in scope lead the changes in Work Breakdown Structure so that project cost can be affected
that's why its necessary to know about the appropriate scope of the project (Meredith and et. al., 2017). Interrelation of various project triangle parameters All three elements time, cost and scope are interrelated with each to make successful of smart city project. Project manager of hull smart city maintained each and every activities and it also ensured by the project manager that all the activities are interrelated with the process of smart city. Project manager set a suitable and appropriate time period which convenient for those employees who are part of this smart city project. Project manages set the cost of each and every factors on the basis of their applicability and demand. The scope of the smart city is wider now a day. Smart city helpful to generate many employment opportunities which give the positive impact on the growth of the city and country too(Heldman, 2018).So all these three elements are engaged with each other and work together to obtain the specific goal. All these triangle parameters are essential to compete the Hull smart city project in a proper way. All the elements are play a significant role to completion of this smart city project which managed the entire time requirement, cost requirements and other necessary resources which helpful to obtain the project goal successfully(Boyle, 2017). TASK 4 Provide advice to the project manager on what resources may be required for this project and what could be an effective cost estimation technique for the Smart City OS project and explain why. RESOURCE REQUIRED: Resourcesrefers to the set of different tangible and intangible things which are essential for the project to be completed in the respective manner assigned and to accomplish all the agenda related to it. Resources can be tangible that is those who can be touched and physically seen by people. On the other hand another form of resource is intangible which can only be felt emotionally and cannot be touched physically. Some of the resources which are essential for Hull City to complete the Smart City OS project are listed below:Infrastructure-The first and foremost resource which is essential for conducting and completing the project as per the requirements as per as according to the agendas is infrastructure within the Hull City. In order to make City a smart city and change it into a
highly programmed one the infrastructure of the city has to be in favour and according to the updated requirements and technological changes(Adeleke and et. al., 2019).Human Resource-The next resource which is essential and plays a significant role is Yun resource both skilled and unskilled. For completing the Smart City OS project The council needs n number of employees with appropriate skill sets that are necessary to complete the project as well as some of those who I will make sure that the plan is implemented and completed properly by supporting unbecoming the pillars of the whole project.Financial Resources-Next up is financial resources that are related to money and funds which are required and very essential for the project to be completed in time and as per the determined aims and objectives. KCOM and Connexin’s are the two key investors of the Smart City OS project in Hull City and who are fulfilling the financial requirements of the project by making investment in financial terms to it. Skills and Abilities of people-This is an intangible asset and a resource which is needed for the project to be a success. The skills and abilities of human resource is a very important asset which is required by the project to complete in time and in the most productive manner by using all the abilities of people involved in the project and divert it towards the success of it(Giao, 2020). COST ESTIMATION: Projects and other related undertakings require cost estimation in order to identify the resource requirements of the project. Tees cost estimations are obviously not accurate and up to mark but it provides the project managers appropriate idea about the resources they need to acquire. The accuracy of these cost estimations entirely depends upon the stages of the project which the cost is required and the resources are being collected. Thus, in accordance with the Smart City OS project the cost estimation technique which will be most suitable is presented underneath:Order of magnitude estimate-This is the cost estimation technique which is a very rough form and most probably used in the early stages of the project particularly when the evaluation and planning stage is going on(Abyad, 2017).This form of cost estimation technique will help the project manager of Smart City OS project to have a general idea total expenditure rather than itemizing the expanse.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Budget estimate-The second form of cost estimation is budget estimate which is also known as preliminary cost estimates. It is more accurate process then the magnitude estimation which will provide around 10 to 25% of accuracy to the project manager of theSmartCityOSprojectWHICHWILLHELPTHEMINDEVELOPINGA PRELIMINARY ITEMIZED LIST OF EXPENDITURE ON THE BASIS OF MAJOR COMPONENTS OF THE PROJECT. Definitive estimate-Third and the last one is definitive estimate which is also known as detail cost estimates. This form of cost estimation technique is the most accurate and provide more detailed information(Lauren and Schreiber, 2018). TASK 5 Develop a risk analysis by constructing a risk register for the Smart City OS project. Risk Analysisis a process which involves assessing and evaluating the likelihood of the adverse events known as risks which can occur in the surroundings of a project or an organisation. The actions taken to measure the risks and the procedure followed is known as the risk analysis. The main purpose behind conducting risk analysis is to make sure of that the organisation and the project management team responsible can be made aware of the unknown events and relevant actions can be performed to reduce its impacts and keep the project on track. In regards to the same a risk resister is developed in case of the Smart City OS project so that the manager can keep track of it and be sure to take proper measure to reduce it to minimal level (Wang and et. al., 2017). RISKRISK LEVEL (Low, Medium and High) LIKELIHOOD OF EVENTS MITIGATION STRATEGY Environmental Risk- The risk in regards to environment refers to the dis-balance being introducedtothe natural surrounding of city by increasing use LOWIT MAY BE POSSIBLE In order to mitigate the riskofunfavourable environmental conditionsand deterioratingnatural health of Hull city due toexcessiveuseof
oftechnology.The environmental risk is relevant to Smart City OS project as it will bedamagingthe nature and it many be possible that adverse environmental conditions can hinder thetechnological advancementand utilisationapplied technology(Greene and Stellman, 2018). technologywhile implementingthe projectplanthe Councilshouldtake measures to cover up to the environment of all the activities which are not in favour of the nature. OperationalRisk- Theriskwillarise whilemanagingand conductingactivities related to the plans of Smart City OS project wherethefunctions involvedincanbe mismanagedand affectthe effectivenessof project plan. MEDIUMLIKELY TO POSSIBLE In order to mitigate the impacts and effects of it the management and leadershipstyles adopted by the project management and teams needstobeinplace andaccurately matchingwiththe programmed plans and agenda of the project (Friess, 2018). Financial Risk- This is a common type of risk which can arise while implementation HIGHVERY LIKELY TO TAKE PLACE For reducing the threat orriskoffinance, effectivefund managementand
ofSmartCityOS project in which lack offundscantake place. balanceneedstobe done in order to place therightamountof money,intheright place and at the rights time. StrategicRisk-This threat refers to lack of specific understanding in case ofimplementingthe planandmaking decisionscorrectly while working. MEDIUMLIKELY TO POSSIBLE In order to mitigate the risktheproject manager of Smart City OS project have to take up number of practices which are directed to effectivedecision making processes and actions. ReputationalRisk- This form of risk is commonlyfacedby business in regards to their market position and goodwill. But the Smart City OS project can face the risk by anyundueand unethical practice if it undertakes. LOWIT MAY OCCURFormanaging reputationalriskand mitigate to the minimal levelwhile implementingthe Smart City OS project, managers and Council shoulddevelopa properethical proceduresandstage whichneedstobe followedwhile conductingactivities related to the project. ComplianceRisk-MEDIUMLIKELY TOToreduceitthe
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
This is a risk which refers to exposure to legalpenaltiesand facinghugelegal charges. POSSIBLEmanagementinvolved should overlook all the legal requirements and workinthebest manner by fulfilling all legal requirements. TechnologicalRisk- Thisisthemost significant risk which will be occurring and needs to be managed by the management of theSmartCityOS project. It is related to failureofany technology which will beusedinorderto accomplish the aim of the project to change the Hull City into the best in the world in regardstoits technology(Koke and Moehler, 2019). HIGHMOST LIKELYThisisakeyrisk whichhastobe reduced to lowest level possible and the threat need tobe mitigated. Fordoingsothe managementneedto take up prior testing of allthetechnologies beingintroducedand implemented for being doublesureofit effectivenessin relation to fulfil agenda of the project. Social Risk-This risk arisesfromthe activitiesofthe communities and the populationwhois surroundedthe MEDIUMLIKELY TO POSSIBLE Thisthreatcanbe reduced easily but the council have to make efforts to keep people informedandmost importantly they have
project and in context ofSmartCityOS project the population of Hull is considered. tomakesurethat peopleareintroduced to all the changes and benefitstheywillbe having with the project andbychangingthe city in the a Smart one. Humanresource Risk-This risk refers to the people involved incompleting different tasks of the projectandtheir abilities to do so. MEDIUMLIKELY TO POSSIBLE The people needs to be regularlytrainingand their skills needs to be upgraded according to changeand requirementfor increasingtheir efficiencyand mitigating any chance of disabilities. Lack of ResourcesLOWIT MAY OCCURThemanagementand responsibleparties have to be sure of the requirementsandthat oftheresourcesare availableaccordingly infavourofmaking thebestuseofthem andinthemost productivemanner (Sibona, Pourreza and Hill, 2018).
TASK 6 Identify at least six conflicts that may arise when running the Smart City OS project and their sources.Critically discuss which actions can be taken by the project manager to resolve conflicts and suggest appropriate conflict management or negotiation strategies to address these. CONFLICTSACTIONS /NEGOTIATIONS TECHNIQUE Conflict over project priorities While managing the conflict overprojectprioritiesthe project manager will be more reconcilingand compromisingtechniquefor negotiatingwiththeparties involved in the conflict and will be taking steps to think of a middle path where all the parties can be satisfied. Perfect over administrative procedures Thisformofconflictis burningpeoplewithinthe project will be on different sides with separate opinions. Inordertomanagesuch conflicttheproject management and managers of theSmartCityOSproject willtakeupcollaborating confrontingandproblem solving technique to negotiate andresolvetheconflict. Whiledoingsotheproject
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
manager will be focusing on resolvingtheconflictand findingthebestalternative solution in order to bring all the parties on similar track in regards to administration of different activities and tasks related to the project(Demir, 2017). Conflict over technical opinions In order to manage such form ofconflicttheproject manager can take up more off of avoiding technique where theprojectmanagercan completely avoid the conflict by taking upside of one party whomthethinkisinbest favour of the project. Conflict over manpower resources Thisisconcerningconflict whichcanbefacedwhile executingand implementing theSmartCityOSproject does the project manager will besuggestedtotakeupa forcing technique where they canforcetheiropinionin order to resolve the conflict and bring in the most suitable staffforcompletionofthe projectandattainingthe objectivesasperthe
requirements. Conflict over costThis is a common form of conflict which arises in most oftheprojectmanagement tasks. According to which the projectmanagercanmake use of smoothening technique in order to negotiate as in the managementatmosphere moredistrustisdeveloped amongthepartiesandfor reducing it the manager needs totakeupasmoothing technique for negotiation and bringingtopartiesona balanced platform and reduce theconflict(Burgerand Zulch, 2018). Personality conflictWhilefacingthe interpersonalissuesand conflict the project manager willagainbeusing accommodating technique of negotiationwheretheywill becomingforwardfor resolvingtheconflictand makesuretosmooththe surroundingsbyusing appropriatewordsand makingthesuitable arguments.
TASK 7 Critically discuss what the project manager can do to build a highly successful team for the Smart City OS project. In particular focus on the importance of how a diverse team can increase project performance.Critically reflect on what actions the project manager can take to build a diverse team for the Smart City OS project and what are some of the challenges of working in diverse teams. Teama small and very general term which states the combination of number of people and their integration in a group for working on a common agenda and accomplishing it in the presented timeframe with performing in the most productive manner. A team becomes an effective one when all the members within the group works towards the common objective and make sure to be highly productive. In order to build a highly successful team the project manager of Smart City OS project can make use of different leadership and team development theories such as Tuckman team development theory. The theory has five stages which are presented below in context of the Smart City OS project.Forming-The stage is of farming where the project manager will be developing the team by bringing diverse employees together. at this stage people do not have any clarity for information about why they are combined in a team and lacks trust on one another and basically work only for themselves rather than the team.Storming-The stage is the most critical one where people do not trust each other and an atmosphere of distrust is developed in the team as well as the lack clarity and knowledge about the project. Here at the stage the manager who is the responsibility to make people comfortable and provide them with required level of information in regards to their actions and the objectives of the project(Kavishe and Chileshe, 2018).Norming-The third stage is little easy people had developed relationship with one another and they trust each other. Along with it the leaders project manager have also played a important role as they will assign the respective roles and jobs to members according to their skill sets and the requirement.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Performing-This is the second last stage where people are very comfortable within the team and make sure to work as one unit in order to attain the agenda of the team as well as contribute towards the aim of the project. They do so by completing the assign tasks in the given time frame and by using their skills in order to perform in the most productive manner. Adjourning-This is the last stage of team development and project completion where the project manager will be appreciating the efforts made by team members but to only of those teams who are made on temporary basis. Other teams are made on permanent basis which means they do not need to dissolve the temporary teams will be dissolved and the members are sent back to their respective work position. This is the best and most beautiful team development theory which is needed to be applied by project manager of the Smart City OS project in order to build a diverse and effective teams for completion of different tasks associated with the project and its agenda. The basic importance of these practice to undertake by the project manager is for creating a diverse team that will bring higher level of skill sets, innovative ideas and most importantly high productivity towards the implementation and execution of the plan regarding the Smart City project. A key challenge which will be faced by the management and the project managers as well as leaders of the teams is to manage the diverse team members as people have different opinions and belongs to different backgrounds which renders them different working processes and techniques that can bring a huge problem in front of leaders while managing people as chances of conflicts increases. CONCLUSION Thepresentreportconcludesandsummarisestheimportanceofdifferentproject management practices and approaches that needed to be adopted by the management and the leaders of a respective project. The whole report is constructed on and revolves around different project management actions beginning with identification of the skills required by a project manager. Moving along the discussion is also conducted about the stakeholders of the project as well as over the risks and resources associated with it. Lastly in the end conflict management and negotiation actions that are useful for the project manager and discussed in regards to different conflicts that can arise while conducting the project and a team development theory is discussed for making sure that diversity is developed in order to complete the project in the most productive and profitable way.
REFERENCES Books and Journals Abyad, A., 2017. Globalization challenges in project management.Middle east journal of business,55(5478), pp.1-10. Adeleke, A. Q. and et. al., 2019. Project Management Performance and Its Influence on Malaysian Building Projects.KnE Social Sciences, pp.313-329. Arantes do Amaral, J. A., et. al., 2018. Combining Project-Based Learning and Community- BasedResearchinaResearchMethodologyCourse:TheLessons Learned.International Journal of Instruction,11(1), pp.47-60. Beerkens, M. and Udam, M., 2017. Stakeholders in higher education quality assurance: Richness in diversity?.Higher Education Policy,30(3), pp.341-359. Boyle, G., 2017.Design project management. Routledge. Brymer, A. L. B., Wulfhorst, J.D. and Brunson, M.W., 2018. Analyzing stakeholders’ workshop dialogue for evidence of social learning.Ecology and Society,23(1). Burger, M. and Zulch, B., 2018. A construction project management knowledge model: The type and level of knowledge required.Acta Structilia,25(1), pp.98-125. Darling, E.J. and Whitty, S.J., 2016. The project management office: It’s just not what it used to be.International Journal of Managing Projects in Business. Demir, K. A., 2017. 3PR Framework for Software Project Management: People, Process, Product, and Risk. InSoftware Project Management for Distributed Computing(pp. 143-170). Springer, Cham. Fadun, O. S. and Saka, S.T., 2018. Risk management in the construction industry: Analysis of critical success factors (CSFS) of construction projects in Nigeria.International Journal of Development and Management Review,13(1). Fionov, B. and Mustafayev, V., 2018. Human Resource Management Practices Contributing to Competency Enhancement of Project Managers and Team Members in Project-Based Organizations: The Case of IT Industry in France. Friess, E., 2018. " Filling to Capacity": An Exploratory Study of Project Management Language in Agile Scrum Teams.Technical Communication,65(2), pp.169-180. Giao, H. N. K., 2020. Developing dimensions to measure the quality of construction project management service. Greene, J. and Stellman, A., 2018.Head First PMP: A Learner's Companion to Passing the Project Management Professional Exam. O'Reilly Media. Heldman, K., 2018.PMP: project management professional exam study guide. John Wiley & Sons. Kavishe, N. and Chileshe, N., 2018. Identifying project management practices and principles for Public–Privatepartnershipsinhousingprojects:Thecaseof Tanzania.Sustainability,10(12), p.4609. Koke, B. and Moehler, R. C., 2019. Earned Green Value management for project management: A systematic review.Journal of Cleaner Production,230, pp.180-197. Lauren, B. and Schreiber, J., 2018. An integrative literature review of project management in technical and professional communication.Technical Communication,65(1), pp.85- 106.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Martens, M.L. and Carvalho, M.M., 2017. Key factors of sustainability in project management context: A survey exploring the project managers' perspective.International Journal of Project Management,35(6), pp.1084-1102. Meredith, J. R. and et. al., 2017.Project Management: A Strategic Managerial Approach. John Wiley & Sons. Mills, D. J. and Tilley, A., 2020. Conservation International_Strengthening Coastal Marine Resources Management in the Coral Triangle of the Pacific-Phase II_ADB Project– WorldFish Progress Report. Radujković,M.andSjekavica,M.,2017.Projectmanagementsuccessfactors.Procedia engineering,196, pp.607-615. Sibona, C., Pourreza, S. and Hill, S., 2018. Origami: An active learning exercise for scrum project management.Journal of Information Systems Education,29(2), pp.105-116. Tabassi, A. A., et. al., 2016. Leadership competences of sustainable construction project managers.Journal of cleaner production,124, pp.339-349. Wang, N. and et. al., 2017. The role of project management in organisational sustainable growth of technology-based firms.Technology in Society,51, pp.124-132. Online How Stakeholder Mapping Tools Can Improve Your Stakeholder Management, 2020 [Online AvailableThrough:<https://www.boreal-is.com/blog/stakeholder-mapping-identify- stakeholders/>