logo

Asset Management for Geelong

   

Added on  2022-09-08

16 Pages898 Words17 Views
 | 
 | 
 | 
Asset Management for
Geelong
Name of the Student
Name of the University
Asset Management for Geelong_1

Team Member 1: Root Cause Analysis for
Project Initiation
(Figure 1: The Root Cause Analysis for the Geelong)
(Source: Created by author)
Asset Management for Geelong_2

Root Cause Analysis for Project
Initiation
The certain issues being faced at Geelong has raised
concerns for initiating the project. These are:
Increase in population by 20% has raised concerns
for increasing water distribution capacity
Issues with storing water for a rising population is
the primary concern
Asset Management for Geelong_3

Team Member 1: Feasible Options of
Investigation
The project relates to determine assets for deciding
over a range of concerns for water storage and
supply
Bringing innovation within the water resources is
the prime concern at Geelong
Improvement in current systems could be brought in
with proper approaches of project management
Asset Management for Geelong_4

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Report on Afiamalu-Malololelei Water Supply System Download
|6
|1220
|13

Stormwater Harvesting System Assignment
|17
|1127
|48

Quality of Urban Transport Assignment
|37
|8638
|35

Analysis of Business Needs and Requirements
|19
|2959
|470