Measuring Concrete for Huron County Ambulance Station

Verified

Added on  2022/10/15

|5
|662
|451
AI Summary
This assignment requires a take-off of the concrete footings and foundation wall of the Garage Area of the building for Huron County Ambulance Station. The concrete is 25mpa strength and is purchased in cubic meters. The take-off list includes continuous footing, supply and place concrete, form and strip footing, supply and place rebar 15M bars, 2 rows, form keyway, supply and place concrete wall, form and strip wall, supply and place 15M rebar-4 rows, 1” chamfer strip top of wall, 2” rigid insulation inside face of wall, and 2” rigid insulation sandwich wall.

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Loading PDF…
[object Object]

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]