Assignment on Cost Estimation

   

Added on  2021-05-31

13 Pages1073 Words62 Views
PROJECT 1 COST ESTIMATION
Unit code:
Name:
Student ID:
Semester 2018
Project 1 Cost Estimation
Estimating project on the following trades: electrical, wallboard fixing, waterproofing, ceramic tiling,
plumbing, carpentry and completion/finishing
Date of Submission: /2018
PART A: COST ESTIMATION OF DIFFERENT TRADES

1. Electrical works

TRADE : ELECTRICAL N/A

WORKS REFERENCE/J
OB:
DATE:
ITEM PARTICULARS UNIT
QUANTI
TY RATE $
Lamps no. 3 600 1800
power plants no. 4 500 2000
Vanity 600 swicthes no. 4 350 1400
Fans no. 3 600 1800
Bath control tabs
1675mm no. 2 750 1500
Cables no. 6 1000 6000
outlet sockets whole 600 600
Heaters m2 9.8778 40 395.112
Switch boards and
controls m2 5.88 30 176.4
Sumtotal
15671.51
2
SUBCONTRACTOR
Electrician
NO
. DURATION
LEVEL
S
per
day
2 3days 2 8hrs 70 280
TOTAL
15951.51
2

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
B.O.Q of Underground Car Parking - Oran Park Town
|5
|443
|352

Calculation of EOQ
|6
|685
|336