COMPETENCYDEMONSTRATION REPORTCareer Episode 2ELZUBAIR RODWAN ABDELMAJID
Competency Demonstration : Report_1
CE 2.1 Project InformationName of the project: Expansion of production with additional production linesLocation of the project: DubaiProject Duration: October 2014 - June 2015Organization: Al rawabi Dairy CompanyRole and Designation during the time: Maintenance engineerCE 2.2 Project BackgroundCE 2.2.1 Characteristics of the projectThe Al rawabi Dairy Company is one of the leaders in the production of dairy and juiceproducts. The company is established in UAE with a wide range of functional products in theirline of work. The company has current operations in UAE, Qatar, and Oman and has more than13,000 stores with the availability of fresh products. They have a cattle stock of 13,000 cows.Since the establishment of the company in 1989 with a small count of 500 cows, the companyhas innovation in its core working processes. The company introduced plastic bottles in the year1991 and then became the first company to pack fresh juices in the year 1995 in GCC. CE 2.2.2 Objectives developed for the projectThe major objectives, which were followed by me, has been discussed below:To increase the number of production lines in the company.
Competency Demonstration : Report_2
To increase the amount of production per day on the existing systems.To provide a periodical update to the maintenance manager about the progress of the work.To check the working condition of the different equipment’s present on the floor of theproduction system.To delegate the jobs to the technicians for the projectTo monitor the working job status of each of the worker of the production floor. CE 2.2.3 My area of workFor the completion of the project, I had worked on the process of development of newproduction lines and improvement of the existing production lines in the factory. I had developedthe reports for the sharing with my maintenance manager of the project. I had helped in thebreaking down of the work for the technicians and the monitoring of the job status of theworkers. I had also raised the corrective action planning for the report based on the breakdown ofthe work. I had taken care of the follow up of the parts in the stock of the warehouse and thepurchase requisitions.
Competency Demonstration : Report_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
ITC 493 - Competency Demonstration Report - Multiple Machinery Operations
|8
|1633
|210

Competency Demonstration Report- PDF
|8
|1635
|152

Introduction to Professional Engineering
|13
|2918
|194

Competency Demonstration Report on North Tay Est, Saudi Arabia
|6
|1036
|232

Competency Demonstration Report - Heating, Ventilation and Air Conditioning (HVAC) System
|8
|1646
|182

Competency Demonstration Report Jotun Paint Factory
|8
|1783
|371