logo

Project Schedule Management-PERT Topic 2022

This assessment requires students to write a review of an article demonstrating critical thinking through analysis of issues and cases in QRP management.

4 Pages660 Words33 Views
   

Added on  2022-09-15

Project Schedule Management-PERT Topic 2022

This assessment requires students to write a review of an article demonstrating critical thinking through analysis of issues and cases in QRP management.

   Added on 2022-09-15

ShareRelated Documents
[Type the company name]
Personal
Reflection
[Type the document subtitle]
SystemJP
[Pick the date]
Project Schedule Management-PERT Topic 2022_1
Introduction
The objective of this learning reflection is to discuss impact of learning in the week six
lecture delivery on the topic “Project Schedule Management-PERT” that discuss PERT
analysis and its concepts in detail manner (Agyei, 2015). This reflection will analyse the
PERT, CPM theory, and their evaluation in the project scheduling management with detailed
analysis on the base of DIEP base.
Describe
This week suggested reading Project Scope, Time, and Cost Management presented Project
Schedule Management-PERT, a theory that evaluate the program and review the techniques
to maintain the accurate outcomes. This lectures presentation developed historical data about
establishment and effectiveness of the PERT, representing the PERT as the probabilistic tool.
It has measured the PERT with the CPM. This article gave a detailed analysis and real-time
comparison between the CPM and PERT that discusses the three estimates of activity
duration. Its duration management include m= most likely, a= the most optimistic and b=
pessimistic time estimate (Mazlum & Güneri, 2015). Both of the theories are utilised to
manage the effective project method.
Interpret
Project management is easily applicable to a systematic planning, executing, monitoring, and
controlling the numerous variables and aspects of a project. I used to examine the
applicability of the taught methods to measure their effective outcomes in the project
planning and management. I eagerly raise the queries to understand the concepts that confuse
me a little bit, as like if effective evaluation of real-time calculation or the reason behind the
differences in the outcomes by the CPM and PERT. I seek for the active involvement in the
Project Schedule Management-PERT Topic 2022_2

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
ASSIGNMENT FOR REFLECTIVE JOURNAL
|4
|744
|20

Project Scope Time and Cost Management | Report
|4
|696
|25

Project Scope and Time Cost Management | Report
|4
|771
|20

Project Management: PERT, Critical Path Method, Crashing
|6
|1153
|285

Report on PERT and CPM in Project Management
|16
|4190
|572

Project Management Tools: Sinnap Software and Its Optimization
|7
|989
|57