Ask a question from expert

Ask now

CPCCBC5003A Supervise the planning of on-site medium rise building or construction work

4 Pages477 Words365 Views
   

Supervise the planning of on-site medium rise building or construction work (CPCCBC5003A)

   

Added on  2020-05-16

CPCCBC5003A Supervise the planning of on-site medium rise building or construction work

   

Supervise the planning of on-site medium rise building or construction work (CPCCBC5003A)

   Added on 2020-05-16

BookmarkShareRelated Documents
Part 1PROJECT WHS AUDIT CHECKILIST1.Project detailsContract Name __________________________________________________________________________________Project Description _______________________________________________________________________________Project Manager: ________________________________________________________________________________Contractor: _____________________________________________________________________________________Date of inspection ________________________________________________________________________________2.Checks for required itemsa)Risks assessmentIndicate in the following manner: Acceptable Not Acceptable and the reason in the description1Item InspectedDescription of the problemRisk LevelEntered on Risk RegisterCorridors and aislesStairs and LandingsFloors and slippery surfacesAmount of lightingElectrical safetyFire safetyFirst Aid kits and its contentsHazardous substancesMachinery and workbenchesMobile plant and equipmentHousekeepingPersonal protection1Journal article on measuring the occupational health and safety performance of construction companies in Australia by John Lin and Anthony Mills in the journal Facilities volume 19, page 131 – 139.
CPCCBC5003A Supervise the planning of on-site medium rise building or construction work_1
b)Evacuation planIndicate in the following manner: Acceptable Not Acceptable and the reason in the descriptionItem InspectedDescription of the problemRisk LevelEntered on Risk RegisterRoutes clearly marked and well litRoutes enough to accommodate evacuating personnelUnobstructed and clear from debrisAlternative evacuation routes presentEmergency number displayedFire/ evacuation alarm locations Designated meeting place head countc)Emergency response plansIndicate in the following manner: Acceptable Not Acceptable Overall emergency plan and organization of the projectRegister of equipment to be used in case of emergency Register of current qualified first aid providersCo-ordination of workers in the event of an emergencyd)InductionsIndicate in the following manner: Acceptable Not Acceptable Outline of the contract induction procedures for the company employeesDetails and modules in the course content of the induction Register of personnel who have completed the induction programDetails of employees that are trained relevant to the project WHS requirementsDetails of employees in possession of permits and competency certificates required for the project22Journal Article on OHS Performance Indicators for Benchmarking: Report on the literature review conducted as stage 1 of the Worksafe Australia project to develop a benchmarking methodology for occupational health and safety by Andrea Shaw in the Journal “Positive performance indicators: Beyond lost time injuries” Page 15 – 27.
CPCCBC5003A Supervise the planning of on-site medium rise building or construction work_2

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Evaluation of the Occupational Health and Safety
|3
|550
|489

Certificate III in Light Vehicle Mechanical Technology Assignment
|6
|988
|26

Site Inspection Report for WHS Management Plan Assessment
|15
|2909
|54

Information about the Fire Triangle PDF
|13
|3474
|135

Fire hazard assignment 6 Description of the hazards
|19
|734
|18

Process Plant Design and Operation: Safety Measures and Best Practices
|17
|4178
|230