The project aims at developing an online based asset tracking system for LogistiX company. The system will include features like addition, modification, and deletion of assets, as well as version control. The system will be accessed securely over the internet and will eliminate data inconsistency and redundancy.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Background The project aims at developing an asset tracking software for LogistiX company. Currently, the company is using spreadsheet to track their assets which includes containers, trucks, cranes and other maintenance items. This manual monitoring of the assets can no longer be used because of increase customer base and its scalability. Also, with the increase in data, keeping information in spreadsheet has become a new challenge. Hence, a new proposal has been put forward to develop an online based asset tracking system with a secure accessibility layer over the internet. In this project, a backend i.e. data storing functionality shall be created using a database, preferable a free source and a frontend shall be created to present an interface to the user where in one can enter or retrieve data from the backend. The system shall be accessed by only authorized person. There shall be no data inconsistency and redundancy and remain protected from illegal access. The entire system will be present in cloud i.e. company will have to pay as per the use and no infrastructure shall be required to be installed on company’s end. Group members #Group member nameMark 1 2 3 Sprint Planning Activities In the first sprint, the analysis and planning activities will be carried out. The requirements will be defined and included in the product backlog and the number, duration, resources, and budget for each sprint will also be determined in the first sprint. The second sprint will include the initiation of design activities and the UI aspects of the onlineassettrackingsystemalongwiththesystemprototypewillbeprepared.The development will begin by the end of this sprint (Rajasekaran, 2015). 1
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Features to be Investigated/Implemented The features will include the addition, modification, and deletion of an asset from the system. The version control features will also be added. Members Assigned Members of the TeamTasks & Features Team Member 1Project planning, design of the UI/UX aspects Team Member 2Requirements analysis – user, functional, non-functional, security frameworks, and design prototypes Team Member 3Investigation and setting up the database at the back end, cost estimations Team Member 4Development of the source code, wireframes Team Member 5Development of the source code, wireframes List of Resources There will be five members in the project team. Team Member 1 (Name) Team Member 2 (Name) Team Member 3 (Name) Team Member 4 (Name) Team Member 5 (Name) Ownership Roles Members of the TeamOwnership Team Member 1Project planning, System Design Team Member 2Requirements analysis – user, functional, non-functional, System Security, System Design Team Member 3Backend of the System, Project Budget Team Member 4System Development, System Design (Wireframes) Team Member 5System Development, System Design (Wireframes) User Stories User story #User storyList of features 2
1As a staff, I wish to manipulate asset data so that all assets information is present on cloudandcanbeaccessedbyallthe employees across the remote locations. Add an asset Modify an asset Delete an asset 2As a staff, I wish to have a version control system so that all employees get to know whenandwhohasupdatedstatusof which items Update status of item Createaversion entry Listallchange versions 3As a manager, I would like to access the systemovertheInternetsothatthe information can be shared at any time and theaccessibilityisnotanissue (Ashbacher, 2010). Accessthesystem over the Internet Securely log in to the system 4As a staff, I would like to have the record of the changes accessible on the system Accessthechange log Story points List of featuresStory pointsExplanation Add an asset2The feature is more completed than listing feature. It includesvarious validationon entereddataandthenraisingerror accordingly. Modify an asset3The feature is more complicated than adding because along with performing all actions for adding feature, it will also conduct dirty checking. Delete an asset1Thisis1/3rdcomplicatedascompareto modify functionbecauseitneedsnot to conduct validations which are required for modify and add features. Update status of item2Thisislesscomplicatedascompareto 3
“Modify” feature. Create a version entry3This feature is more complicated that above allbecauseversioningisacomplicated feature. List all change versions1It just involves listing of versions. Access the system over the Internet 1It is the basic functionality of the system. Securely log in to the system1It is the basic functionality of the system. Access the change log1It is the basic functionality of the system. Reflection We will design the online asset tracking software for the organization using responsive methodology so that the users get to have enhanced interaction and responsiveness with the system and the development processes will also be simplified for us. We could analyze the issues that the organization currently has in terms of the asset tracking and control and could identify the need and requirements of the system so that we could deliver the system as per the expectations of the client. We have decided to use PHP as the programming language for the system as it will allow us to develop a system that is flexible, reliable, and secure. The first two sprints provided us with the ability to carry out the initial planning and analysis activities along with the completion of the system design so that the development processes could begin. There will be two more sprints needed to complete the activity and develop the system ready for deployment. 4
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
References Ashbacher, C. (2010). Succeeding With Agile: Software Development Using Scrum, by Mike Cohn.The Journal Of Object Technology,9(4). doi: 10.5381/jot.2010.9.4.r1 Rajasekaran, V. (2015). Issues in Scrum Agile Development Principles and Practices in softwaredevelopment.IndianJournalOfScienceAndTechnology,8(35).doi: 10.17485/ijst/2015/v8i35/79037 5