This essay discusses a renovation project of a beachside cottage, including the project management theories used. It also highlights the author's contributions and experience gained during the project.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Running head: BEACH SIDE PROJECT RENOVATION BEACH SIDE PROJECT RENOVATION Name of the Student Name of the University Author note
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
1 BEACH SIDE PROJECT RENOVATION Introduction A proper background analysis of the entire project will be performed. This will help in better understanding of the scenario. Project management theories that have been used during the commencing of the project is also stated in the essay. A proper discussion regarding the contributions I have made in the project will also be made. The experience that I have gained during the completion of the project is also discussed in the essay. Background A renovation project has been performed that is located in the branch side. The condition of the cottage was not livable. Airbnb wanted to use the cottage for the rental purpose. The main motive of Airbnb was to make the cottage ready for accepting rental orders for the purpose of vacation. The budget that was provided for completion of the project is $ 20,000. I have to perform the entire planning part along with my group. This essay is mainly related with the experience I had and the contributions I had made in the project. Proper discussions regarding the benefits that I will be getting due to the experience that I have gained during the execution of the project also has been a major aspect of the project. Linking theories with experience The theories that are considered for execution of the renovation process includes theory of project. as per the theory of project I have learnt that the steps that are important includes performing sufficient amount of work must be performed in a regular and unnecessary works must be avoided. The work that is performed must be performed as per the scope of the project. the scope of the project is determined as the commencing of the Work Breakdown Structure of the project. usage of the theory of management is also what I have learnt during this experience.
2 BEACH SIDE PROJECT RENOVATION According to the theory of management I have learnt that a single project can be divided among initiation, planning, execution and controlling of the project. This ensures that the management of the project will be performed as per the central idea that was generated and the task is performed in a closed loop manner. As per the theory of planning, proper planning of the project will be performed in a manner that the structuring of the plan is present. The structuring part is performed as per the commencing of the project under the heading of the core process of planning. The core processes includescopeplanning,activitysequencing,scopedefinition,resourceplanning,activity definition, activity duration estimating, schedule development, cost estimating, cost budgeting, and project plan development. After performing the theory of planning, theory of execution is what I have learnt during the execution of the project. According to the theory of the execution, I have learnt that the initial step that is requited to be implemented includes authorization of the plan that is made. The execution process starts only after the plan get authorized. The 2 main steps that are performed in this system includes decision making and communication among the stakeholders during the execution of the project. implantation of classical theory of the communication is implemented and I have also learnt about the theory of controlling.As per the theory of controlling the ain aspect that is taken inti consideration includes better understanding of the standard of the performance and setting a standard before hand. This ensures that better processing of the performance is performed.
3 BEACH SIDE PROJECT RENOVATION Contribution The role that I have played in the project is vital. I was acting as the driving point of the project. I was involved in developing of the project schedule. This ensures that the activities that are performed in the project is decided by me and stated by me. Planning phase, execution phase and the controlling phase was described in a way of activities as per the requirement of the project. with the help of the project scheduling, risk matrix can be performed. the cost that is incurred in the completion of the project is also made by me via the schedule that I have designed. I had performed rigorous research that helped me in bettering the processing of the management system. This ensures that better commencing of the project gets performed. I have also performed the RACI matrix. I have also performed the activity node diagram that will help in understanding of the network diagram. Experienced I have a very fond experience of the project. I can say that the experience that I have gained while execution of the project have been very learning. This particular project helped me in bettering the concept of the project management. the theories that I got accustomed with during the completion and execution of the project will help me in bettering the processing of project management in future projects. This is one of the major reasons that proper management of the project will get easier for me. I have also cleared the issues that I previously had regarding the designing of the project schedule and how the schedule is made. This clear concept in the schedule designing will help in bettering to process of the business management in future. Hence this will act as a boost to my career. I have also learnt the techniques of analyzing skills of the workers. With the help of the skill analysis the main advantage that is gained includes the fact
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
4 BEACH SIDE PROJECT RENOVATION that proper allocation of the project will be made. This ensures that proper management of the execution phase can be performed by me. Conclusion The main motive of the project is to perform renovation for a cottage that is based on the beaches. The condition of the cottage was not worthy and hence it was not in a livable condition. Provisioning of strategies are the main aspect that is taken into consideration. This includes the fact that better management of the renovation will be performed in case the strategies that will be implemented are planned before hand.I have gained knowledge regarding the different tools and theories of the project management.
5 BEACH SIDE PROJECT RENOVATION Bibliography Brioso, X., 2015. Integrating ISO 21500 guidance on project management, lean construction and PMBOK.Procedia Engineering,123, pp.76-84. Demirkesen, S. and Ozorhon, B., 2017. Impact of integration management on construction projectmanagementperformance.InternationalJournalofProjectManagement,35(8), pp.1639-1654. Owusu, E.K., Chan, A.P. and Shan, M., 2019. Causal factors of corruption in construction project management: An overview.Science and engineering ethics,25(1), pp.1-31. Saunders, P., Gharaie, E., Chester, A. and Leahy, C., 2017. Improving the student experience with learning analytics in construction project management courses.EPiC Series in Education Science,1, pp.505-515. Sears, S.K., Sears, G.A., Clough, R.H., Rounds, J.L. and Segner, R.O., 2015.Construction project management. John Wiley & Sons. Walker, A., 2015.Project management in construction. John Wiley & Sons. Zheng, X., Le, Y., Chan, A.P., Hu, Y. and Li, Y., 2016. Review of the application of social network analysis (SNA) in construction project management research.International journal of project management,34(7), pp.1214-1225.