Boston's Central Artery/Tunnel Project: Analysis of Cost and Time Overruns

   

Added on  2023-04-25

16 Pages1242 Words110 ViewsType: 110
Leadership Management
 | 
 | 
 | 
Boston's Central
Artery/Tunnel
Project
Boston's Central Artery/Tunnel Project: Analysis of Cost and Time Overruns_1

Introduction
Boston's Central Artery/Tunnel Project was a
megaproject within Boston which rerouted its
central Artey of Interstate 93
The plan is also included rail connection
among Boston’s two major terminals of train.
The planning of tunnel project began in the
year 1982
This project was considered as expensive
highway project in US and it was failed
because of cost overrun and time overrun
(Artery, 2017).
Boston's Central Artery/Tunnel Project: Analysis of Cost and Time Overruns_2

Range of used control system for
cost
The cost control system cuts the cost to improve the bottom line of
the project
The budget cost is higher than standard cost and lower than the
standard cost (Harris, 2017).
It is calculated that the project was completed by December 2007, and
cost was being estimated at $14.8bn
After five years, the actual cost of this project is estimated more than
$24bn
There is extra of over $100m for the project plan
Boston's Central Artery/Tunnel Project: Analysis of Cost and Time Overruns_3

Range of used control system for
schedule
The schedule control system address things as
processes to schedule performance tracking of all the
project activities
In tunnel construction project, the schedule changes are
caused due to failure to attain planned date (Larson et al.,
2014).
The schedule control system provides baseline needs for
the system and supports contractor for better planning
Boston's Central Artery/Tunnel Project: Analysis of Cost and Time Overruns_4

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Strategic Project Management on Boston's Big Dig
|12
|3009
|71

Lectures on Business Cases
|17
|3432
|362

The Learning Communities LC-01A) building will go through
|2
|428
|150

Project Management Induced by Project Manager
|20
|5749
|342

Analyzing cost and time overrun in Sydney Opera House Failed Project
|21
|5823
|475

Project Management Analysis of Sydney Opera House Failed Project
|11
|948
|51