Article | Construction to Reduce Traffic Issues

   

Added on  2019-10-01

21 Pages6217 Words160 Views
Bridge constructionStudent nameUniversityTable of Contents1

Introduction:..............................................................................................................2Construction process and activity:.............................................................................3Sustainable method:...............................................................................................4Integration with existing infrastructure and local community:..............................5Planning Strategy including Planning Obligations:...............................................5Commercial strategy for bridge construction:........................................................5Transportation, procurement, construction program and quality policy for bridge construction:...........................................................................................................7Gantt chart & RIBA Plan:.........................................................................................8Financial analysis of bridge construction:...............................................................11The bridge construction process for public concern:..............................................15Political and economic development challenges and failure criteria:.....................17Conclusion :.............................................................................................................19Introduction: The research article discusses the construction of a bridge over the river in order to reduce trafficissues and looking for development in different area such as social, economic, physical,2

sustainable approaches. According to a given case study, the bridge construction and authorizedmanagement proposed four bridge construction such as "Silvertown Tunnel", "Woolwich FerryReplacement", "Galleons Reach: Ferry or Bridge" and "Belvedere crossing". The articlediscusses possible activities associated with the bridge construction. The study aim of bridgeconstruction is to provide practice possible solution of bridge construction that must be optimumdesign and cost of construction. In order to design the bridge, the design engineer andmanagement should consider an important aspect for bridge construction that ensuresconstruction reliability and provides practice possible solution. For bridge construction, the article may discuss about the important aspect of bridge designconstruction such as sustainable design approach, construction planning strategy with planningobligations, transportation strategy, commercial strategy and financial viability, integration withthe current infrastructure and response from local community, financial planning, costing andmaterial requirement of construction, procurement strategy and construction program, legalstrategy and quality of bridge construction, innovative technology that make easier for workingaccording to planning and stick with the project planning, problem identification duringconstruction and proposal solution in order to reduce total cost of production and ensure qualityof production Voo, C. (2015). The bridge construction planning includes the aspects of health,welfare, and safety during the entire work of construction. Construction process and activity: For any construction activity and project, the basic and primary think requires project planning.The project planning based on bridge design and that may include each activity, cost, timeduration, numbers of worker required for the project, contractor detail, roles and responsibilitiesof an engineer, supervisor, and workers throughout the project. The project planning and sequence for bridge construction based on the major task of the project.That also includes the complexities and barriers assumption while planning. The barriers ofconstruction include budget issues, investor poor response, climate issues, poor bridge design,etc. For project planning of bridge construction, may includes the following activities.3

a.Identifying the requirement of bridge constructionb. Assessment, forecasting, evaluation of possible traffic for a requirement in the specificarea of bridge construction at a specific location.c.A possible alternative of bridge construction.d.Refining and short listing of each possible solution. e.Find the conceptual plans for the alternatives. That includes the selection of material anduse for construction work. This activity also includes the arrangement of the span andform. f.The basic outline of bridge design and approximate costing of the bridge structure.g.Evaluation of planning, risk assessment and choice of design h.Resource identification through the surveying and research Voo, C. (2015). Apart from this, the consultant firm needs to consider bridge construction in order toachieve the most suitable methods: Sustainable method: As per given case study, the population increases day by day and year after years, therefore, adesign engineer needs to consider sustainable approach by considering future aspects. The designengineer and construction project manager needs to develop a project plan, selection ofconstruction material, bridge structural analysis and many more aspect of bridge constructionand development plan Falco, E. (2015). In order to develop a sustainable bridge, the followingprinciple and important aspect needs to consider. The construction plan needs to consider must allowable, individual vehicle and utilityinfrastructure to cross expense in the safe and effective method consideration. The bridgestructure construction procedure should make a positive impact on the environment, surroundingcommunity and crowd that will experiences. The bridge construction should consider variousform of transportation by considering the local community in an effective way. While designingand project planning, it should be avoided needs to develop multiple structures to support thedifferent types of vehicles including cars, bicycle, and trains. It may also include the other uses,including utility transport, if possible. The procedure of construction, material use and motive of4

development must not harm the ecological system and must be balanced within the planet'sability to absorbs its consumption of the non-renewable resource and waste emission. Theapproach also needs to consider the limited use of land and affect the natural climate, consideringits potential impact of the environment change (McNiff, et.al.2013). The construction procedure should consider environmental issues throughout the entire life spanof the process. That should be limited use of land and affect the natural environment; it alsoaffects the potential impact on climate change. The environmental issues need to considerthroughout the lifespan by considering the construction process when it required to maintain andlastly it is required to replace and demolished. It must be within specific budget including build,operation, maintenance, repair, and replacement. The bridge construction should sustainableitself by economically and able to develop the revenue for the employers. Integration with existing infrastructure and localcommunity: As per given case study, the bridge construction requires to develop at a different place, withdifferent drawing and dimensions. The bridge needs to develop over the bases of the endcondition of the soil surface. The bridge developed and design consideration may assume bysimply supported beam subjected to a uniformly distributed load over the entire span. Thedesign engineer must consider the current technology, revise construction or latest constructionstandard and soil nature when design about the bridge. The design engineer and project planningteam needs to develop project planning by considering resource availability, manpoweravailability, transportation facility and surrounding community those can take the part project. Planning Strategy including Planning Obligations: The planning obligation strategy supplementary planning document will provide the frameworkfor the negotiation and use of the planning obligation duty across the site. There are variouspurposes to provide security mechanisms. The planning strategy may include the newinfrastructure and current developed strategy in order to improve current bridge structure. Theplanning and implement procedure measure to mitigate the unfavorable impact of thedevelopment Gnecchi-Ruscone, E. (2010). The obligation measures the address which provides5

the required identification that lodge the development of bridge and surrounding structure. Theplanning strategy may include the specific requirement covered through strategy may includesuch as transportation, the open area surrounding the bridge construction. Commercial strategy for bridge construction: Execution of project plan: In order to complete the project within a time period and ensure quality and sustainableapproach, it is require developing ends-to-ends and through-through execution plan will be onlyresponsible for improving efficiency and execute the project effectively (Khaleghi, 2010). Developing an ambitious strategy: This is not a case of finance but it is sustainable terms that will create and aspire the high on theproject execution ends with the condition of dedication and commitment in order to obtaindesired objectives. In case it held together, the ambitious strategy with the obsessive executionplan will be work according to the project plan. Priority for strengthening aspects: The project manager focuses on the important parameters and a key aspect of the bridgeconstruction project. the management looking and consider those aspects and take as startingpoint to step by step ladder position. Clear your achievement, it is outlined that aspect which keyrole and aspect of Strengths Bridge, A. (2014). As more aware of the strength, more powerfuloutput possible to develop. Priority to key person for decision making: In a construction project, the project planning and correct way of execution is an important partof the entire project. The project manager should give priority to that person who can give aquality result and ensure production as per decided objectives. The management needs toencourage and support to develop strategy, they also include suggestion and recommendationfrom expertise, they can take help from previous work, research and project plan in order todevelop an effective strategy and useful project plan. 6

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Report On Construction Engineering
|22
|4929
|58

Infrastructure Management for Kosciuszko Bridge Project
|13
|3233
|210

Report about Procurement and Contract Management 2022
|8
|2139
|30

Development of a Single System of Transportation
|17
|3700
|50

Pyrmont Swing Bridge Replacement and Construction in Sydney, Australia
|17
|4406
|225

Significance of Programme and Portfolio Management in Successful Delivery of Investment Programme
|23
|7456
|90