This project discusses the conversion of sports centres into Nightingale Hospitals in the UK during the coronavirus pandemic. It covers the work breakdown structure, network diagram, critical analysis, and the importance of project management tools. The report also includes a peer review and assessment section.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Brief Coronavirus Pandemic Conversion of Sports centres
to Nightingale Hospital
to Nightingale Hospital
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Table of Contents
Introduction......................................................................................................................................3
Section 1..........................................................................................................................................4
Scenario 2........................................................................................................................................6
Scenario 3........................................................................................................................................6
Section 4..........................................................................................................................................6
Peer Review and assessment.........................................................................................................10
Conclusion.....................................................................................................................................11
References......................................................................................................................................13
Introduction......................................................................................................................................3
Section 1..........................................................................................................................................4
Scenario 2........................................................................................................................................6
Scenario 3........................................................................................................................................6
Section 4..........................................................................................................................................6
Peer Review and assessment.........................................................................................................10
Conclusion.....................................................................................................................................11
References......................................................................................................................................13
Introduction
The project is about Conversion of Sports focuses to Nightingale Hospital-Temporary medical
clinics that are set up to treat Covid patients in the UK. The littlest of the three plans is the
Manchester Central will have limit with respect to 1,000 patient beds and NEC in Birmingham
and ExCel in London have limit with respect to 5,000 beds. It is shrouded in 4 areas; segment 1
covers work separate structure, segment 2 covers network outline, segment 3 covers Gantt graph
and last segment 4 covers basic investigation of above segments. A mind boggling venture is
made reasonable by first separating it into singular segments in a progressive structure, known as
the work breakdown structure, or the WBS. Such a structure characterizes errands that can be
finished autonomously of different undertakings, encouraging asset distribution, task of duties,
and estimation and control of the venture.
The separating of an undertaking into its segment parts encourages asset allotment and the
task of individual obligations. Care should be taken to utilize a legitimate degree of detail while
making the WBS. On the one outrageous, an extremely significant level of detail is probably
going to bring about miniature administration. On the other outrageous, the errands may turn out
to be too enormous to even think about managing successfully. Characterizing errands with the
goal that their span is between a few days and a couple of months functions admirably for most
tasks.
The project is about Conversion of Sports focuses to Nightingale Hospital-Temporary medical
clinics that are set up to treat Covid patients in the UK. The littlest of the three plans is the
Manchester Central will have limit with respect to 1,000 patient beds and NEC in Birmingham
and ExCel in London have limit with respect to 5,000 beds. It is shrouded in 4 areas; segment 1
covers work separate structure, segment 2 covers network outline, segment 3 covers Gantt graph
and last segment 4 covers basic investigation of above segments. A mind boggling venture is
made reasonable by first separating it into singular segments in a progressive structure, known as
the work breakdown structure, or the WBS. Such a structure characterizes errands that can be
finished autonomously of different undertakings, encouraging asset distribution, task of duties,
and estimation and control of the venture.
The separating of an undertaking into its segment parts encourages asset allotment and the
task of individual obligations. Care should be taken to utilize a legitimate degree of detail while
making the WBS. On the one outrageous, an extremely significant level of detail is probably
going to bring about miniature administration. On the other outrageous, the errands may turn out
to be too enormous to even think about managing successfully. Characterizing errands with the
goal that their span is between a few days and a couple of months functions admirably for most
tasks.
Section 1
Work break down structure
ContractorsNHSstaffSoldiersEngineerSupplyteamBedsVentilatorDecorateGlassworkPaintWiring
Work break down structure
ContractorsNHSstaffSoldiersEngineerSupplyteamBedsVentilatorDecorateGlassworkPaintWiring
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Tasks
Duration
(days)
1 Planning
1.1 Designing 15
2 Budgeting
2.1 Sanction of budget 20
3 Supply
3.1 Electrical equipments 10
3.2 Oxygen tanks 20
3.3 Beds 12
3.4 Ventilator 10
3.5 Other equipments 20
4 Decoration
5.1 Glass work 14
5.2 Paint 12
5 Electric works
6.1 Wiring 6
6.2
Electronic appliances
installation 12
6.3 Circuit breaker installation 4
6 Maintaining
4.1 Electrical infrastructure 12
4.2 Temporary generator 38
4.3 Light cut maintenance 38
4.4 Replacement of oxygen tanks 38
7 Conversion team
7.1 Contractors 90
7.2 NHS staff 90
7.3 Soldiers 90
8 Finishing 1
Duration
(days)
1 Planning
1.1 Designing 15
2 Budgeting
2.1 Sanction of budget 20
3 Supply
3.1 Electrical equipments 10
3.2 Oxygen tanks 20
3.3 Beds 12
3.4 Ventilator 10
3.5 Other equipments 20
4 Decoration
5.1 Glass work 14
5.2 Paint 12
5 Electric works
6.1 Wiring 6
6.2
Electronic appliances
installation 12
6.3 Circuit breaker installation 4
6 Maintaining
4.1 Electrical infrastructure 12
4.2 Temporary generator 38
4.3 Light cut maintenance 38
4.4 Replacement of oxygen tanks 38
7 Conversion team
7.1 Contractors 90
7.2 NHS staff 90
7.3 Soldiers 90
8 Finishing 1
Scenario 2
Network diagram:
Network diagram:
Scenario 3
Gantt chart
Section 4
Critical analysis
Use of WBS:
Experienced project managers realize that numerous things can turn out badly in tasks, paying
little heed to how effectively the work is arranged and executed. Part or full-venture
disappointments, when they do happen, can frequently be followed to an ineffectively created or
nonexistent WBS. An inadequately developed WBS can bring about unfriendly task results
including progressing, rehashed venture rethinks and expansions, indistinct work tasks, scope
creep or unmanageable, oftentimes evolving extension, spending overwhelm, missed cutoff
times and unusable new items or conveyed highlights.
Gantt chart
Section 4
Critical analysis
Use of WBS:
Experienced project managers realize that numerous things can turn out badly in tasks, paying
little heed to how effectively the work is arranged and executed. Part or full-venture
disappointments, when they do happen, can frequently be followed to an ineffectively created or
nonexistent WBS. An inadequately developed WBS can bring about unfriendly task results
including progressing, rehashed venture rethinks and expansions, indistinct work tasks, scope
creep or unmanageable, oftentimes evolving extension, spending overwhelm, missed cutoff
times and unusable new items or conveyed highlights.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
There are many undertaking the board instruments and procedures that utilization the
WBS or its parts as information (PMI, 2004). For instance, the WBS uses the task contract as its
beginning stage. The significant level components in the WBS should coordinate, in exactly the
same words, the things used to portray the results of the task in the degree articulation.
Furthermore, the asset breakdown structure (RBS) depicts the undertaking's asset association and
can be utilized related to the WBS to characterize work bundle tasks. The WBS Dictionary
characterizes, subtleties, and explains the different components of the WBS. The organization
outline is a consecutive plan of the work characterized by the WBS and the components of the
WBS are beginning stages for characterizing the exercises remembered for the undertaking plan.
The upper degrees of the WBS ordinarily mirror the significant deliverable work regions
of the task, deteriorated into consistent groupings of work. The substance of the upper levels may
differ, contingent upon the sort of venture and industry included. The lower WBS components
give fitting point of interest and center to help of task the board cycles, for example, plan
improvement, and cost assessing, asset allotment, and danger appraisal. The most reduced level
WBS parts are called work bundles and contain the meanings of work to be performed and
followed. These can be later utilized as contribution to the planning cycle to help the elaboration
of undertakings, exercises, assets, and achievements which can be expense assessed, checked,
and controlled.
Use of Network diagram
An organization outline is a graphical portrayal of the undertaking and is made out of a
progression of associated bolts and boxes to depict the between connection between the exercises
engaged with the venture. Boxes or hubs speak to the portrayal of exercises and bolts show the
relationship among the exercises. There must be a beginning and finish the action, and the wide
range of various exercises fall inside these two. There are countless ways for drawing the
organization outline, for example, priority charting strategy (PDM), bolt charting technique, and
GERT (Graphical Evaluation and Review Technique). These days, basically venture supervisor
utilize the priority charting cycle to draw an organization outline. You have to choose which
action is the replacement and which one is the archetype.
There could be some obligatory conditions which can't be changed over into delicate
rationale conditions. In such manner, director needs to set up the Network Diagram
WBS or its parts as information (PMI, 2004). For instance, the WBS uses the task contract as its
beginning stage. The significant level components in the WBS should coordinate, in exactly the
same words, the things used to portray the results of the task in the degree articulation.
Furthermore, the asset breakdown structure (RBS) depicts the undertaking's asset association and
can be utilized related to the WBS to characterize work bundle tasks. The WBS Dictionary
characterizes, subtleties, and explains the different components of the WBS. The organization
outline is a consecutive plan of the work characterized by the WBS and the components of the
WBS are beginning stages for characterizing the exercises remembered for the undertaking plan.
The upper degrees of the WBS ordinarily mirror the significant deliverable work regions
of the task, deteriorated into consistent groupings of work. The substance of the upper levels may
differ, contingent upon the sort of venture and industry included. The lower WBS components
give fitting point of interest and center to help of task the board cycles, for example, plan
improvement, and cost assessing, asset allotment, and danger appraisal. The most reduced level
WBS parts are called work bundles and contain the meanings of work to be performed and
followed. These can be later utilized as contribution to the planning cycle to help the elaboration
of undertakings, exercises, assets, and achievements which can be expense assessed, checked,
and controlled.
Use of Network diagram
An organization outline is a graphical portrayal of the undertaking and is made out of a
progression of associated bolts and boxes to depict the between connection between the exercises
engaged with the venture. Boxes or hubs speak to the portrayal of exercises and bolts show the
relationship among the exercises. There must be a beginning and finish the action, and the wide
range of various exercises fall inside these two. There are countless ways for drawing the
organization outline, for example, priority charting strategy (PDM), bolt charting technique, and
GERT (Graphical Evaluation and Review Technique). These days, basically venture supervisor
utilize the priority charting cycle to draw an organization outline. You have to choose which
action is the replacement and which one is the archetype.
There could be some obligatory conditions which can't be changed over into delicate
rationale conditions. In such manner, director needs to set up the Network Diagram
appropriately, mirroring those situations. In view of this Network Diagram, administrator will
get generally speaking venture term in the wake of joining the quantity of assets and the quantity
of working hours (or any comparative measurements) against each action. Amassing these lets,
you determine in general task plan. Thus, chief can see how significant this apparatus is for a
task administrator while achieving the undertaking objective.
Some of the importance of network diagram in planning includes:
Organization charts show interdependencies of exercises: Since interdependencies of exercises
are obvious in the organization outline, it will be simpler to see which action can begin after
which one, which action relies upon one another, archetypes and replacements of every action
and so on
Organization Diagrams show work process of the task exercises. So the undertaking group
will know the succession of exercises. At one point in the venture, it will be simpler to find in the
organization outline what has been cultivated and the excess exercises and their
interdependencies with one another.
Organization charts recognize occasions to pack the timetable. You may need to
abbreviate the span of the excess exercises in a venture. This can be on the grounds that
undertaking is delayed and to finish the venture on schedule, it needs to pack the timetable. For
this situation, since network charts show the request for the exercises and terms, it will be
simpler to zero in on the most proficient method to pack the excess exercises in the undertaking.
Organization charts show venture progress. Since it shows the request for exercises in a
venture and all out way from the earliest starting point of the task till the end, it is a decent
instrument for demonstrating the undertaking progress.
Use of Gantt chart and Scheduling
Schedule management
Schedule management is a system that requires a foundation of strategies and documentation for
looking after, creating, overseeing and controlling the timetables for time and assets for fruition
of the undertaking. The vital advantage of the timetable administration measure is, it will screen
and deal with the timetable all through the venture.
get generally speaking venture term in the wake of joining the quantity of assets and the quantity
of working hours (or any comparative measurements) against each action. Amassing these lets,
you determine in general task plan. Thus, chief can see how significant this apparatus is for a
task administrator while achieving the undertaking objective.
Some of the importance of network diagram in planning includes:
Organization charts show interdependencies of exercises: Since interdependencies of exercises
are obvious in the organization outline, it will be simpler to see which action can begin after
which one, which action relies upon one another, archetypes and replacements of every action
and so on
Organization Diagrams show work process of the task exercises. So the undertaking group
will know the succession of exercises. At one point in the venture, it will be simpler to find in the
organization outline what has been cultivated and the excess exercises and their
interdependencies with one another.
Organization charts recognize occasions to pack the timetable. You may need to
abbreviate the span of the excess exercises in a venture. This can be on the grounds that
undertaking is delayed and to finish the venture on schedule, it needs to pack the timetable. For
this situation, since network charts show the request for the exercises and terms, it will be
simpler to zero in on the most proficient method to pack the excess exercises in the undertaking.
Organization charts show venture progress. Since it shows the request for exercises in a
venture and all out way from the earliest starting point of the task till the end, it is a decent
instrument for demonstrating the undertaking progress.
Use of Gantt chart and Scheduling
Schedule management
Schedule management is a system that requires a foundation of strategies and documentation for
looking after, creating, overseeing and controlling the timetables for time and assets for fruition
of the undertaking. The vital advantage of the timetable administration measure is, it will screen
and deal with the timetable all through the venture.
In each association, projects are a fundamental technique to construct esteem. Running an
association with an absence of thoughts and no legitimate timetables anticipated ventures would
prompt disappointment. Regardless of what the size or extent of your undertaking is, the task
plan explains when every movement should be done, what is now done, and the arrangement
wherein things should be done. In the current business climate, every association should be able
to oversee and plan with skintight spending plans, asset shortage, and the latest innovation
designs.
Gantt chart
A Gantt chart is an undertaking the board device that you can use to complete your activities in
the most ideal conditions. It permits you to draw up an undertaking timetable to imagine
assignments that must be done and those that are as of now finished. The benefit of utilizing a
Gantt outline is that it is reasonable for a wide range of activities and businesses. The visual
portrayal of undertakings and achievements, the utilization of shadings to characterize needs or
potential deferrals and the advancement of errands makes it extremely simple to envision the
advancement of a venture. In a matter of moments, it is conceivable to have an away from of the
task's advancement and to settle on the correct choices if there should arise an occurrence of
deferral.
Gantt diagrams are helpful for arranging and booking ventures. They assist you with
evaluating what amount of time a venture should require, decide the assets required, and plan the
request where you'll finish assignments. They're additionally useful for dealing with the
conditions between assignments. Gantt outlines are helpful for checking a venture's advancement
once it's in progress, as well. You can promptly observe what ought to have been accomplished
by a specific date and, if the venture is bogged down, you can make a move to bring it back on
course.
association with an absence of thoughts and no legitimate timetables anticipated ventures would
prompt disappointment. Regardless of what the size or extent of your undertaking is, the task
plan explains when every movement should be done, what is now done, and the arrangement
wherein things should be done. In the current business climate, every association should be able
to oversee and plan with skintight spending plans, asset shortage, and the latest innovation
designs.
Gantt chart
A Gantt chart is an undertaking the board device that you can use to complete your activities in
the most ideal conditions. It permits you to draw up an undertaking timetable to imagine
assignments that must be done and those that are as of now finished. The benefit of utilizing a
Gantt outline is that it is reasonable for a wide range of activities and businesses. The visual
portrayal of undertakings and achievements, the utilization of shadings to characterize needs or
potential deferrals and the advancement of errands makes it extremely simple to envision the
advancement of a venture. In a matter of moments, it is conceivable to have an away from of the
task's advancement and to settle on the correct choices if there should arise an occurrence of
deferral.
Gantt diagrams are helpful for arranging and booking ventures. They assist you with
evaluating what amount of time a venture should require, decide the assets required, and plan the
request where you'll finish assignments. They're additionally useful for dealing with the
conditions between assignments. Gantt outlines are helpful for checking a venture's advancement
once it's in progress, as well. You can promptly observe what ought to have been accomplished
by a specific date and, if the venture is bogged down, you can make a move to bring it back on
course.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Peer Review and assessment
Section of report Heading Outline (max 50 words)
Key points to be included
Wordsi
n this
section
Title page
Title page should include all the
relevant informations related to project
topic and other project details
0
Contents Table of contents should include all the
headings and sub-headings used in
the content of the project. It should
start with introduction and finished with
Conclusion.
0
Introduction Introduction includes brief of contents
which will be discussed in whole
project. It also includes details of each
headings and subheadings to be
discussed in whole project.
200
1 WBS Breaking work into smaller tasks is a
common productivity technique used to
make the work more manageable and
approachable. For projects, the Work
Breakdown Structure (WBS) is the tool
that utilizes this technique and is one
of the most important project
management documents. It
singlehandedly integrates scope, cost
and schedule baselines ensuring that
project plans are in alignment.
0
2 ND A project network diagram is one such
tool that helps simplify a complex
project plan, enabling a project
manager to see the big picture of the
project. It’s important to have an
overview of any project, see when it
starts and finishes, and quickly note all
the points in-between that intersect
and how they work together.
0
3 MSP A project schedule communicates what
tasks need to get done and which
organizational resources will be
allocated to complete those tasks in
0
Section of report Heading Outline (max 50 words)
Key points to be included
Wordsi
n this
section
Title page
Title page should include all the
relevant informations related to project
topic and other project details
0
Contents Table of contents should include all the
headings and sub-headings used in
the content of the project. It should
start with introduction and finished with
Conclusion.
0
Introduction Introduction includes brief of contents
which will be discussed in whole
project. It also includes details of each
headings and subheadings to be
discussed in whole project.
200
1 WBS Breaking work into smaller tasks is a
common productivity technique used to
make the work more manageable and
approachable. For projects, the Work
Breakdown Structure (WBS) is the tool
that utilizes this technique and is one
of the most important project
management documents. It
singlehandedly integrates scope, cost
and schedule baselines ensuring that
project plans are in alignment.
0
2 ND A project network diagram is one such
tool that helps simplify a complex
project plan, enabling a project
manager to see the big picture of the
project. It’s important to have an
overview of any project, see when it
starts and finishes, and quickly note all
the points in-between that intersect
and how they work together.
0
3 MSP A project schedule communicates what
tasks need to get done and which
organizational resources will be
allocated to complete those tasks in
0
what timeframe. A project schedule is
a document collecting all the work
needed to deliver the project on time.
But when it comes to creating a project
schedule, well, that’s something few
have deep experience with. What and
who is being scheduled, and for what
purposes, and where is this scheduling
taking place, anyway?
4 critical analysis A critical analysis is subjective writing
because it expresses the writer's
opinion or evaluation of a text. Analysis
means to break down and study the
parts. Writing a critical paper requires
two steps: critical reading and critical
writing. Critical reading: Identify the
author's thesis and purpose.
1200
5 self and peer
assessment
Self and peer assessment is about
revision and improvement. It enables
students to independently assess their
own and other students’ progress with
confidence rather than always relying
on teacher judgment.
400
Conclusion This part includes all the summary and
self analyses based on theories and
findings from Section 1 to 4.
200
References Harvard referencing has been done
properly and proper guidelines
followed.
Conclusion
After analyzing whole report, it can be concluded that, a project manager should prepare the
Network Diagram adequately so that it shows the right path of project success.. On the off
chance that your Network Diagram is precise, half of your undertaking issues could be unraveled
through this as it were. Be that as it may, practically speaking, assets are normally restricted and
scant. There are numerous positions sharing basic assets and accessible assets are not sufficient
enough. The occasional lack, work questions, gear breakdowns, contending requests, postponed
a document collecting all the work
needed to deliver the project on time.
But when it comes to creating a project
schedule, well, that’s something few
have deep experience with. What and
who is being scheduled, and for what
purposes, and where is this scheduling
taking place, anyway?
4 critical analysis A critical analysis is subjective writing
because it expresses the writer's
opinion or evaluation of a text. Analysis
means to break down and study the
parts. Writing a critical paper requires
two steps: critical reading and critical
writing. Critical reading: Identify the
author's thesis and purpose.
1200
5 self and peer
assessment
Self and peer assessment is about
revision and improvement. It enables
students to independently assess their
own and other students’ progress with
confidence rather than always relying
on teacher judgment.
400
Conclusion This part includes all the summary and
self analyses based on theories and
findings from Section 1 to 4.
200
References Harvard referencing has been done
properly and proper guidelines
followed.
Conclusion
After analyzing whole report, it can be concluded that, a project manager should prepare the
Network Diagram adequately so that it shows the right path of project success.. On the off
chance that your Network Diagram is precise, half of your undertaking issues could be unraveled
through this as it were. Be that as it may, practically speaking, assets are normally restricted and
scant. There are numerous positions sharing basic assets and accessible assets are not sufficient
enough. The occasional lack, work questions, gear breakdowns, contending requests, postponed
conveyances and numerous different vulnerabilities influence gracefully and accessibility of
assets thus, this is only sometimes be underestimated.
In the event that the assets request surpasses the flexibly, medicinal measures to battle
insufficient asset gracefully is to be made. In the event that there are clashes among venture
exercises for similar asset things, movement term and priority connections should be thought of
and rescheduling the non-basic exercises will regularly tackle the issue. In most undertaking
circumstances assets can be procured or delivered in basically any ideal sums on the off chance
that one is happy to pay costs engaged with changing asset levels, for example, the expenses of
recruiting, preparing, joblessness protection, etc.
assets thus, this is only sometimes be underestimated.
In the event that the assets request surpasses the flexibly, medicinal measures to battle
insufficient asset gracefully is to be made. In the event that there are clashes among venture
exercises for similar asset things, movement term and priority connections should be thought of
and rescheduling the non-basic exercises will regularly tackle the issue. In most undertaking
circumstances assets can be procured or delivered in basically any ideal sums on the off chance
that one is happy to pay costs engaged with changing asset levels, for example, the expenses of
recruiting, preparing, joblessness protection, etc.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
References
Radujković, M. and Sjekavica, M., 2017. Project management success factors. Procedia
engineering, 196, pp.607-615.
Demirkesen, S. and Ozorhon, B., 2017. Impact of integration management on construction
project management performance. International Journal of Project Management, 35(8),
pp.1639-1654.
Silvius, G., 2017. Sustainability as a new school of thought in project management. Journal of
Cleaner Production, 166, pp.1479-1493.
Saltz, J. and Crowston, K., 2017. Comparing data science project management methodologies
via a controlled experiment.
Pajares, J., Poza, D., Villafañez, F. and López-Paredes, A., 2017. Project Management
Methodologies in the Fourth Technological Revolution. In Advances in Management
Engineering (pp. 121-144). Springer, Cham.
Joslin, R., 2019. Project management methodologies, project success, project governance,
contingency theory, agency theory, and stewardship theory. In Project management
methodologies, governance and success (pp. 17-30). Auerbach Publications.
Radujković, M. and Sjekavica, M., 2017. Project management success factors. Procedia
engineering, 196, pp.607-615.
Demirkesen, S. and Ozorhon, B., 2017. Impact of integration management on construction
project management performance. International Journal of Project Management, 35(8),
pp.1639-1654.
Silvius, G., 2017. Sustainability as a new school of thought in project management. Journal of
Cleaner Production, 166, pp.1479-1493.
Saltz, J. and Crowston, K., 2017. Comparing data science project management methodologies
via a controlled experiment.
Pajares, J., Poza, D., Villafañez, F. and López-Paredes, A., 2017. Project Management
Methodologies in the Fourth Technological Revolution. In Advances in Management
Engineering (pp. 121-144). Springer, Cham.
Joslin, R., 2019. Project management methodologies, project success, project governance,
contingency theory, agency theory, and stewardship theory. In Project management
methodologies, governance and success (pp. 17-30). Auerbach Publications.
1 out of 14
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.