Executive Summary
The report has summarized about buck student union festival project which analyse the project
brief accordingly. In order to address about overall project where how board of directors, senior
managers participate in the project completion. Furthermore, it briefly includes the critical path
concept which help for calculating the shortage path and also using work break down structure of
entire festivals activities. In additional, it analyse stakeholder management strategies to identify
possible risk that directly affects on the project.
2
Bucks Students Union Festival Case Study_2

Contents
INTRODUCTION...........................................................................................................................3
TASK 1............................................................................................................................................3
TASK 2............................................................................................................................................6
TASK 3............................................................................................................................................9
TASK 4..........................................................................................................................................11
CONCLUSION..............................................................................................................................13
REFERENCES..............................................................................................................................14
3
Bucks Students Union Festival Case Study_3

INTRODUCTION
Project management is based on the practices of initiating, planning, executing and
controlling the work as a team for achieving the specific goals. It is considered as critical
practice that applies knowledge of process, tool, deliverables, skills and technique to project
activities. it must ensure that solid path to project success by meeting requirements. The primary
aim of project is analyses Bucks student union musical festivals which help for identifying the
different project activities, actions. Therefore, it explores the most effective critical path in the
project to calculate the shortest time if it required. Afterwards, it will analysis stakeholder
management along with project risk table and also developed.
TASK 1
Compare about three project management methodologies, analysis advantage and disadvantage
of project management methodologies.
There are different types of project methodologies discuss in following:
Project Methodologies:
Waterfall methodology: this type of method is to consider as oldest and well-known
technique in terms of software development. It is an efficient with highly concentration or
documentation, planning the overall requirement of project development. It is widely
used in the project development because it always maintains high quality of services.
there are different phases role played in project development such as design, coding,
planning, testing, analysing and maintenance (Akhmetshin and et.al., 2019). Different
phases are overlapping in water fall model that has completed all task in proper manner.
Figure 1 Water fall model
(Source: Waterfall Methodology. 2018)
4
Bucks Students Union Festival Case Study_4

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Project Management Methodologies for Bucks' Students Union Music Festival
|16
|2628
|70

BM522 Project Management Assesment
|18
|2151
|59

Project Management: Case Study of Bucks Student Union Music Festival
|12
|1973
|402

Bucks Students Union Music Festival
|16
|2295
|21

Bucks Students’ Union Music Festival Case Study
|16
|2227
|15

Project Management Methodologies for Bucks Student’s Union Music Festival
|14
|2025
|222