This document discusses the professional practice of building environment and the services offered by Maestro Architects Limited. It covers topics such as design, fees, ethical positions, and service schedules. The document provides valuable information for those interested in the field of architecture and building construction.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
BUILDING ENVIRONMENT PROFESSIONAL PRATICE [Author Name(s), First M. Last, Omit Titles and Degrees] [Institutional Affiliation(s)]
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
FEES, TERMS, CONDITIONS Maestro Architects Limited is planning to provide services that capture all types of design, documented records and assessment of building tasks. Maestro Architects Limited normally specializes in structural design of any building that is very secure and at the same time ensuring that environment is preserved and protected. Additionally, Maestro Architects Limited also deals with the conception and generation of new ideas concerning building and ways of upgrading buildings hence making the existing building to become practicable for its intended use (Angral, 2019). The following are intended specifications of Richmond office building: Managing the construction of office area for a particular building Suitable front desk and guests waiting and resting place Suitable washrooms for different genders factoring in people with disability Appropriate storehouse Housetop BBQ region Amble car park space The above design-elements are used in the construction of an office and office approximations should contain 212 m2per floor in its three building floors. The amble parking space for cars should be constructed on the lower basement (ground-floor) of the office-building. It is important to point out that the office space herein is appropriate for small office holders to medium office holders or owners (Coetzer, Ryan, Susomrith and Suseno, 2017). Consider the illustration of design-detail of the building as per the specifications;
The figure illustrated above, clearly shows the intended plan of ground-floor for an office- building that is suppose to be modelled. It can be further estimated that the total free space is 636m2. In a situation where the budget of the project is not well explained and illustrated before, then the fees to be charged to the project can be best determined by use of bundle provided by Maestro Architects Limited (Drevland, Lohne and Klakegg, 2017). Maestro Architects Limited’s
calculations are based on the total number of the space occupied by project. The following are a number of services rendered by Maestro Architects Limited though categorized in modular form; Module-A involves a well carried design and the development of permit drafts for holding the building structure. This is considered to be appropriate in situations where construction design and the contracted contractors come from different parties (Johnson and Gore, 2016). Module-B normally contains all design work, draft-permits and documented project records from the project’s commencement to project are completion. It is applicable in situations where project design, project feasibility and thorough supervision of project is needed by the customer. Module-C includes all the design work, thorough supervision of the building and better ways of managing construction works. Further, this module captures all available amenities needed for projects to be upgraded from the start of project’s commencement to its completion. It can be estimated that sum-total budget of the project for designing Adam-Street office building could be valued to $80 per-square-foot. From this based on the Maestro Architects Limited valuation view point, the sum-total fee for the service rendered for this project would be approximated to be $55,000 including GST (Kwofie, Amos-Abanyie and Afram, 2016). This sum-total fee for the service levied is based on the total space covered because there is no pre- defined financial forecast.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
ETHICAL POSITIONS The ethical standards requirements that is dealt with in this project-venture integrates all ethical responsibilities as per RAIA as well as the copyright requirements well stipulated by the Institute of Architects in Australia. There are some of the professional ethics and moral integrity issues that one must consider when rendering construction services. This may include the following: An architect is required to exercise self confidence in project-system of public-equity. The service to be rendered must be performed with duty of care, a high level of brightness, focused-minds and keeping at heart the professional environmental ethics ensuring meeting the expectations of the client as outlined in the project brief. The point of view of client is to have his expectations met in the design (Lohne et al., 2017). In the code of ethics provided by RAIA, architects are expected to be in full compliance of professional code of ethics that guides architectural work and exercising due diligence it is associated with. All architects undertaking architectural work to be a keen follower of ethical regulations that often guide the behavior of various professionals in the architectural profession. Maestro Architects Limited has outlined various copyrights of building-plans, designs and building upgrade services that must be executed by qualified architects and this has been explicitly stated below; The engineering design created by architects is regarded as a way of discovery and the act of art of architects and shall remain architectural-property that is not subject to material-alteration by anyone without giving any information to owner (Mohamad, Rahman, Usman and Tawil, 2015)
Any adjustment to be in the current building plan, then the architect concerned must be notified early before commencement An architect that comes up with the plan or layout of the building has right of copyright and may not be subject its copyright-clarifications or copyright-notification where possible Considering section-73 of National-Act of Copyrights (NAC), a project-firm has power to make alteration without informing the engineer who created it Reproduction of the building plans that has been developed by Maestro Architects Limited is not allowed and anyone found doing so will be legally challenged in the court of law following that act of right-infringement. RAIA ethical codes are useful in architectural work regulations and therefore architects are required to follow such codes as indicated below; A professional architect should be openly interested in his work and exercise high level of skill in architectural work (Pooley, 2015) This profession is guided by rules and principles that must be respected by architects as well as those rules that may enable them to enjoy their legacy-rights, cultural and safety protection-rights.
FEE/SERVICES PROPOSAL/ENGAGEMENT LETTER REFERENCE ID:12thApril, 2018 Meladen Club, Subject: Upgrade service-detail of Meladen Club RE: Inquiry of services The spirit of this letter is to give a suggestion that Maestro Architects Limited may be willing to undertake the opportunity of the service to enable the management of Maestro Architects Limited renovate the Richmond office building. The management of Maestro Architects Limited has a lot and wide range of management tools contained in the TOR (Terms of Reference) for better understanding and compliance (Preiser, Hardy and Wilhelm, 2017). The following comprise of short notes on the services offered by Maestro Architects Limited; Summary of design A suggested project-venture is located at the Adam-Street, Richmond. It includes the modification of the office building which draws its center of attention to the mentioned below parts of the building: Managing the construction of office area for a particular building Suitable front desk and guests waiting and resting place Suitable washrooms for different genders factoring in people with disability Appropriate storehouse Housetop BBQ region Amble car park space
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Summary of services Maestro Architects Limited has full control of its work schedule to ensure that the office building is upgraded as per outlined terms of reference and schemes of service contained in the section therein. Administrative costs are understood to be GST. The total spending-plan and chargeable fee is subject to uncertain situations and can be re-negotiated should need arise that is considered important (Toffa, Osman and Bennett, 2015). The upgrading of the office building comprises the following services: Office front desk Office-space area Washrooms space Storehouse region Housetop patio and BBQ space Adequate spring-space Services needed Surveying the present situation at the actual site The estimated costs for the office building upgrade Documented record of the project work Permits needed Project-management and evaluation It should be noted that sum-total of the fee needed for whole service-work has been approximated to $80 per square-feet of the space covered. The sum-total service fee-levy including GST has been estimated to be $50,000 to ensure project’s completion.
Service Schedules It tends to describe the type of service to be conducted and in which order of events as per building-design and documented records detailed in phases9. Below is a brief description of the expected service from the time of commencement to its completion time; Predesign project-phase In this, initial survey of the project is performed giving the general over view of the project site and a number of approaches to estimate costs associated with the whole project-cost. The concept-design processing through service-evaluation is carried out in this project-phase (Wade, Murtagh and Hitchings, 2018). Once the concept-design has been processed, a customer is allowed to make a choice. Activities in this project-phase consist of: Preliminaries research and current research condition Approximations of project-costs Preparation of several concept-design derived from preliminary research Customer selection of the most appropriate detailed-design Main design project-phase It is the most important part of the design project-phase. This phase contains a lot of information concerning project design as well as concept-design that customer or client is able to approve in the first phase of the project. Further, drawing is very important in this phase where they used for project construction-works. Below are some of the activities which are covered in this section: Production of well explained architectural and structure-plans of the office building modification
Design of elevations Inclusion of third parties Once the design-work of the appropriate modifications of the office building has come to its completion, engineer is allowed to share the design-work with the client to make final-approval to facilitate issuance of certificates and documents regarding the project-work Permits and documentation-phase This is the phase where certificates for the design-works that had been given approval by the client are produced. Drawings of the project design-works are equally approved and passed by relevant building authorities to ensure project work commencement. Documents that are key to administration and this exercise are completed (Wade, Murtagh and Hitchings, 2018). These are the main activities here: Tendering method Issuance of permits Proper-documentation Establishment work-flow and analysis Professional fee-levy Contained herein, are the detailed records of fee-levy by Maestro Architects Limited for construction project works. Included here, is a fixed professional fee-levy of $80 per square-feet of the project design-work as herein in the contractual agreement8.Additionally, all surveys, project-documentation, estimated costs and project design-work are all captured in this part as well as project-management and project-evaluation. Also, included here is the sum-total service fee of 50,000 dollars including GST. Below is the break-down of $ 50,000;
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Initial-surveys and preliminary research of the project=$ 3,000 Approximated cost of the project work=$ 2,000 Concept-design of the project work=$ 5,000 Drawing of detailed-elevation in 2-D and 3-D forms=$ 25,000 Documentation of the project work=$5 ,000 Project work-management=$ 10,000 The break-down of the service cost above, adds up to $ 50,000 which form part of the project total cost. The professional fee charged here is subject to fluctuations due to unexpected project work delays and in such circumstances, it can be further re-negotiated where applicable. Mode and Terms of Payment Payment mode of each phase that has been well explained and illustrated above design-phase is made by issuing a cheque indicating the title of Maestro Architects Limited. The following are the ways of making payments using cheques to Maestro Architects Limited; An invoice that details type of transactions made when the project work was initiated to its completion time Each design-phase has to be costed and payments to that effect In situations where there is a possibility of extension, say a period of one month, payments must be done in the month stated in the work schedule depending on the part completed of the design-phase of the project work (Wade, Murtagh and Hitchings, 2018). All pending bill must be cleared in a period not more than one week after generating a receipt to that course
At each and every phase is concluded, it is required that all the transaction charges associated with such phases must be paid and failure to pay may results to delays. It is expected that 40% is made for every phase from the start of project and 60% paid after project completion. Remarks The application forwarded and will be accepted based on terms of the contract agreement. It is expected that the project specifications must be met before start of any project work. Maestro Architects Limited intends to provide best-solutions to building upgradation of the office building at Adam-street, Richmond. Maestro Architects Limited is always in full compliance with professional ethical codes, copyright laws and building regulations. Clients are always given first priority since key pillars of the company. Yours faithfully,Yours faithfully, Signed……………Signed…………… Maestro Architects LimitedMeladen Club
References Angral, A., 2019. Architect–client relationship and value addition in private residential projects.Archnet-IJAR: International Journal of Architectural Research,13(1), pp.58-71 Coetzer, A., Ryan, M.M., Susomrith, P. and Suseno, Y., 2017. Challenges in addressing professional competence expectations in human resource management courses.Asia Pacific Journal of Human Resources,55(4), pp.454-475 Drevland, F., Lohne, J. and Klakegg, O.J., 2017. Ethical Dilemmas in Value Delivery: Theoretical Conditions. In25th Annual Conference of the International Group for Lean Construction(pp. 145-152) Johnson, B.J. and Gore, N., 2016. What do the professions ‘profess’? Comparing architecture and planning codes of ethics.Architectural science review,59(6), pp.449-464 Kwofie, T.E., Amos-Abanyie, S. and Afram, S.O., 2016. Principal component analysis of professional competencies of architects in the Ghanaian construction industry.Engineering, Construction and Architectural Management,23(5), pp.571-587 Lohne, J., Svalestuen, F., Knotten, V., Drevland, F.O. and Lædre, O., 2017. Ethical behaviour in the design phase of AEC projects.International Journal of Managing Projects in Business,10(2), pp.330-345 Mohamad, N., Rahman, H.A., Usman, I.M. and Tawil, N.M., 2015. Ethics education and training for construction professionals in malaysia.Asian Social Science,11(4), p.55 Pooley, A., 2015. Transforming practice: Re-linking professional experience and the curriculum.Local Economy,30(3), pp.292-304
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Preiser, W.F., Hardy, A.E. and Wilhelm, J.J. eds., 2017.Adaptive architecture: Changing parameters and practice. Routledge Toffa, T., Osman, A. and Bennett, J., 2015. Architecture and agency: ethics and accountability in teaching through the application of Open Building principles. InCONFERENCE OVERVIEW AND PUBLICATION OF THE PROCEEDINGS(p. 287) Wade, F., Murtagh, N. and Hitchings, R., 2018. Managing professional jurisdiction and domestic energy use.Building Research & Information,46(1), pp.42-53 x x