Method Statement for Installation of Building Management System in G+2+Roof Service Floor School Building
VerifiedAdded on 2023/06/05
|11
|2194
|410
Assignment
AI Summary
In this assignment we will discuss about building management system and below are the summaries point:-
Introduction to the method statement for the installation of the Building Management System (BMS) at the King School project.
Scope of work for the installation of the BMS in the Kings School Building, ensuring compliance with project specifications and standards.
Sequence and method of executing the installation, including approval processes, inspections, and coordination with Siemens Industrial LLC, the BMS supplier.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
M T TAT M T TA ATE HOD S E EN FOR INS LL ION
MA A M T T MOF BUILDING N GE EN SYS E
or P Pf RO OSED G+2+ROOF SERVICE FLOOR SCHOOL BUILDING
P T A A M AMMA AON LO NO: 631 0103, H D EQ SHEIKH OH D BIN R SHID
FOR KINGS HOLDINGS (L.L.C).
CLIENT:
MAIN CONSULTANT:
MEP CONSULTANT:
MAIN CONTRACTOR:
HVAC & BMS CONTRACTOR
BMS SUPPLIER:
SIEMENS INDUSTRIAL LLC
MA A M T T MOF BUILDING N GE EN SYS E
or P Pf RO OSED G+2+ROOF SERVICE FLOOR SCHOOL BUILDING
P T A A M AMMA AON LO NO: 631 0103, H D EQ SHEIKH OH D BIN R SHID
FOR KINGS HOLDINGS (L.L.C).
CLIENT:
MAIN CONSULTANT:
MEP CONSULTANT:
MAIN CONTRACTOR:
HVAC & BMS CONTRACTOR
BMS SUPPLIER:
SIEMENS INDUSTRIAL LLC
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
TABLE OF CONTENT
oN . e criptionD s Pa eg
oN .
1. T TIN RODUC ION 3
2. PSCO E OF WORKS 3
3. M TSEQUENCE & E HOD 3
4. M TREQUIRE EN S 4
5. M T TE HOD OF EXECU ION 4
6. TA AT PINS LL ION ROCEDURE 4
oN . e criptionD s Pa eg
oN .
1. T TIN RODUC ION 3
2. PSCO E OF WORKS 3
3. M TSEQUENCE & E HOD 3
4. M TREQUIRE EN S 4
5. M T TE HOD OF EXECU ION 4
6. TA AT PINS LL ION ROCEDURE 4
Page Number 3 of 11
1.0 T TIN RODUC ION
T e p rpo e o t i met od tatement i to de cri e t e proced re and a e tem oh u s f h s h s s s b h u s s f sys s f
or re ired or t e n tallation o ildin Mana ement tem M at t e inw k qu f h I s f Bu g g Sys (B S) h K g
c ool pro ectS h j .
2.0 PSCO E OF WORKS
2.1 T i Met od tatement co er t e nat re and t pe o or or n tallation o ildinh s h S v s h u y f w k f I s f Bu g
Mana ement tem in t e in c ool ilding Sys h K gs S h Bu g.
2.2 T i Met od tatement i to pro ide idance in carr in o t t e n tallation o ildinh s h S s v gu y g u h I s f Bu g
Mana ementg temSys in accordance itw h t eh tandards s, pro ectj peci ications f s and
appro ed Material mittal to en re t e per ormance o t e ildin Mana ementv Sub su h f f h Bu g g
temSys .
2.3 P rpo e o t i Met od tatement i to control t e in tallation acti itie in line it t eu s f h s h S s h s v s w h h
Pro ect alit Plan and Pro ect Tec nical peci ication re irement to ac ie e t ej Qu y j h S f qu s h v h
optim m re ltu su s.
3.0 M TSEQUENCE & E HOD
3.1 Met od tatement to e pro ided or client con ltant appro alh S b v f / su v .
3.2 or all e carried o t t e in tallation team a per appro ed M proced re nderW k sh b u by h s s v S u u
t e trict per i ion and idance o t e M P Pro ect n ineerh s su v s gu f h E j E g .
3.3 M P Pro ect n ineer all c ec all t e or done prior to endin t e in pectionE j E g sh h k h w ks s g h s
re e t to t e con ltantqu s h su .
3.4 e e t or n pection T all e prepared M P Pro ect n ineer and all eR qu s f I s ( CIR) sh b by E j E g sh b
i ed or rt er in pection it on ltant ommi ionin n ineer o ld implementssu f fu h s w h C su , C ss g E g sh u
t e con ltant comment i an immediatelh su s ( f y) y.
3.5 iemen n ineer all co ordinate and arran e or t pical in tallation per i ion iS s E g sh - g f y s su v s f
re iredqu .
1.0 T TIN RODUC ION
T e p rpo e o t i met od tatement i to de cri e t e proced re and a e tem oh u s f h s h s s s b h u s s f sys s f
or re ired or t e n tallation o ildin Mana ement tem M at t e inw k qu f h I s f Bu g g Sys (B S) h K g
c ool pro ectS h j .
2.0 PSCO E OF WORKS
2.1 T i Met od tatement co er t e nat re and t pe o or or n tallation o ildinh s h S v s h u y f w k f I s f Bu g
Mana ement tem in t e in c ool ilding Sys h K gs S h Bu g.
2.2 T i Met od tatement i to pro ide idance in carr in o t t e n tallation o ildinh s h S s v gu y g u h I s f Bu g
Mana ementg temSys in accordance itw h t eh tandards s, pro ectj peci ications f s and
appro ed Material mittal to en re t e per ormance o t e ildin Mana ementv Sub su h f f h Bu g g
temSys .
2.3 P rpo e o t i Met od tatement i to control t e in tallation acti itie in line it t eu s f h s h S s h s v s w h h
Pro ect alit Plan and Pro ect Tec nical peci ication re irement to ac ie e t ej Qu y j h S f qu s h v h
optim m re ltu su s.
3.0 M TSEQUENCE & E HOD
3.1 Met od tatement to e pro ided or client con ltant appro alh S b v f / su v .
3.2 or all e carried o t t e in tallation team a per appro ed M proced re nderW k sh b u by h s s v S u u
t e trict per i ion and idance o t e M P Pro ect n ineerh s su v s gu f h E j E g .
3.3 M P Pro ect n ineer all c ec all t e or done prior to endin t e in pectionE j E g sh h k h w ks s g h s
re e t to t e con ltantqu s h su .
3.4 e e t or n pection T all e prepared M P Pro ect n ineer and all eR qu s f I s ( CIR) sh b by E j E g sh b
i ed or rt er in pection it on ltant ommi ionin n ineer o ld implementssu f fu h s w h C su , C ss g E g sh u
t e con ltant comment i an immediatelh su s ( f y) y.
3.5 iemen n ineer all co ordinate and arran e or t pical in tallation per i ion iS s E g sh - g f y s su v s f
re iredqu .
Page Number 4 of 11
4.0 M TREQUIRE EN S
• All M material recei ed at ite ill e eri ied in accordance to appro ed Material mittalB S s v s w b v f v sub .
• n re t e material are properl tored in dr co ered conditioned tora e area in accordanceE su h s y s y v s g
it Man act rer recommendation Protection all e pro ided rom d tw h uf u . sh b v f us .
• Material re ired to e tored at ite prior to tart t e n tallation all e ec re a e and rees qu b s s s h I s sh b s u , s f f
rom an or or acti itie t at mi t ca e dama ef y w ks v s h gh us g s.
• n re appro ed op dra in are a aila le at ite or t e e ec tion o oE su v sh w gs v b s f h x u f j b.
• n re ci il clearance i o tained prior tartin t e or ere applica leE su v s b s g h w k (wh b )
• n re appro ed Met od tatement i a aila leE su v h S s v b .
• enc mar all e carried o t at ite in t e permanent location ere applica le and t e ameB h k sh b u s h (wh b ) h s
all e appro ed t e con ltant prior to commencement o orsh b v by h su f w k.
5.0 M T TE HOD OF EXECU ION
• n re Material mittal op ra in Material n pection n pection Te t Plan and Met odE su Sub , Sh D w gs, I s , I s & s h
tatement doc mentation are appro ed in order to proceed and all identi et er an pecialS u v sh fy wh h y s
re irement are re ired to nderta e t e orqu s qu u k h w ks.
• n re ade ate antit o material pertainin are a aila le at iteE su qu qu y f s g v b s .
• n re Material n pection appro al i o tained in compliance to pro ect re irementE su I s v s b j qu s.
• n re Appro ed op dra in i a aila le at ite applica le or t e in tallation t at i re ired to eE su v sh w g s v b s b f h s h s qu b
per ormedf .
• n re containment cond it in tallation ca le p llin ca le identi ication and contin it te t areE su / u s , b u g, b f u y s s
completed re pecti e partie ontin it te t report o ld e pro idedby s v s. C u y s sh u b v .
• ite n ineer ill in pect t e area i e intended or n tallation and en re t e location i ree romS E g w s h ( . .) f I s su h s f f
an cla e it ot er er icey sh s w h h s v s.
• ite n ineer ill eri t at t e oreman oin to coordinate t e in tallation acti it a eenS E g w v fy h h f g g h s v y h s b
in ormed on t e code o ood and accepta le practicef h s f g b s.
• ite n ineer ill en re t at related a et or permit a een o tained prior to commencementS E g w su h S f y w ks s h s b b
o in tallation orf s w k.
• Tool and acce orie or t e p rpo e o Toolin and n tallation i re ired to e ed a pers ss s f h u s f g I s s qu b us s
Man act rer recommendationuf u .
• ittin and acce orie peci icall de i ned and man act red or t e application all e in tallF gs ss s s f y s g uf u f h sh b s .
4.0 M TREQUIRE EN S
• All M material recei ed at ite ill e eri ied in accordance to appro ed Material mittalB S s v s w b v f v sub .
• n re t e material are properl tored in dr co ered conditioned tora e area in accordanceE su h s y s y v s g
it Man act rer recommendation Protection all e pro ided rom d tw h uf u . sh b v f us .
• Material re ired to e tored at ite prior to tart t e n tallation all e ec re a e and rees qu b s s s h I s sh b s u , s f f
rom an or or acti itie t at mi t ca e dama ef y w ks v s h gh us g s.
• n re appro ed op dra in are a aila le at ite or t e e ec tion o oE su v sh w gs v b s f h x u f j b.
• n re ci il clearance i o tained prior tartin t e or ere applica leE su v s b s g h w k (wh b )
• n re appro ed Met od tatement i a aila leE su v h S s v b .
• enc mar all e carried o t at ite in t e permanent location ere applica le and t e ameB h k sh b u s h (wh b ) h s
all e appro ed t e con ltant prior to commencement o orsh b v by h su f w k.
5.0 M T TE HOD OF EXECU ION
• n re Material mittal op ra in Material n pection n pection Te t Plan and Met odE su Sub , Sh D w gs, I s , I s & s h
tatement doc mentation are appro ed in order to proceed and all identi et er an pecialS u v sh fy wh h y s
re irement are re ired to nderta e t e orqu s qu u k h w ks.
• n re ade ate antit o material pertainin are a aila le at iteE su qu qu y f s g v b s .
• n re Material n pection appro al i o tained in compliance to pro ect re irementE su I s v s b j qu s.
• n re Appro ed op dra in i a aila le at ite applica le or t e in tallation t at i re ired to eE su v sh w g s v b s b f h s h s qu b
per ormedf .
• n re containment cond it in tallation ca le p llin ca le identi ication and contin it te t areE su / u s , b u g, b f u y s s
completed re pecti e partie ontin it te t report o ld e pro idedby s v s. C u y s sh u b v .
• ite n ineer ill in pect t e area i e intended or n tallation and en re t e location i ree romS E g w s h ( . .) f I s su h s f f
an cla e it ot er er icey sh s w h h s v s.
• ite n ineer ill eri t at t e oreman oin to coordinate t e in tallation acti it a eenS E g w v fy h h f g g h s v y h s b
in ormed on t e code o ood and accepta le practicef h s f g b s.
• ite n ineer ill en re t at related a et or permit a een o tained prior to commencementS E g w su h S f y w ks s h s b b
o in tallation orf s w k.
• Tool and acce orie or t e p rpo e o Toolin and n tallation i re ired to e ed a pers ss s f h u s f g I s s qu b us s
Man act rer recommendationuf u .
• ittin and acce orie peci icall de i ned and man act red or t e application all e in tallF gs ss s s f y s g uf u f h sh b s .
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Page Number 5 of 11
6.0 TA AT PINS LL ION ROCEDURE
TA AT PA6.1 INS LL ION OF DDC NEL
• panel location all e a per appro ed op dra inDDC sh b s v sh w g.
• Mo ntin ei t all e mm rom to top o t e panel or a per appro ed op dra inu g h gh sh b 1800 f FFL f h s v sh w g.
• n tallation ill e carried o t a per in tallation recommendation a per dra inI s w b u s s s & s w gs.
• n re t e ali nment o t e panel i maintainedE su h g f h s .
• n re dedicated electrical pace and or in pace are pro ided or panel d rin in tallationE su s w k g s v f DDC u g s .
• T pical in tallation detail or panel a olloy s f DDC s f ws:
TA AT6.2 INS LL ION OF FIELD DEVICES
• n tallation o ield de ice ill e carried o t a ter t e completion o related tem AI s f f v s w b u f h f sys s (HV C,
Pl m in and ot er applica le temu b g) h b sys s.
• Mar t e location in ma in tape and mar er penk h s us g sk g k .
• e t e correct ield de ice a per appro ed doc mentUs h f v s v u s.
• ollo man act rer in tr ction or in tallation pro ided in o pac o eac de iceF w uf u s u f s v b x/ k f h v .
A. A T A P T M MIR DIFFEREN I L RESSURE SWI CH - QB 81-3 / QB 81-5
• n tall t e pre re itc on t e e ipmentI s h ssu sw h h qu .
• T e pre re itc i ita le or mo ntin on air d ct or allh ssu sw h s su b f u g u s w s.
• T e pre re connection t e can e an len t t t e re pon e time increa e ih ssu ub s b y g h, bu h s s s s f
lon er t an meterg h 2 s.
6.0 TA AT PINS LL ION ROCEDURE
TA AT PA6.1 INS LL ION OF DDC NEL
• panel location all e a per appro ed op dra inDDC sh b s v sh w g.
• Mo ntin ei t all e mm rom to top o t e panel or a per appro ed op dra inu g h gh sh b 1800 f FFL f h s v sh w g.
• n tallation ill e carried o t a per in tallation recommendation a per dra inI s w b u s s s & s w gs.
• n re t e ali nment o t e panel i maintainedE su h g f h s .
• n re dedicated electrical pace and or in pace are pro ided or panel d rin in tallationE su s w k g s v f DDC u g s .
• T pical in tallation detail or panel a olloy s f DDC s f ws:
TA AT6.2 INS LL ION OF FIELD DEVICES
• n tallation o ield de ice ill e carried o t a ter t e completion o related tem AI s f f v s w b u f h f sys s (HV C,
Pl m in and ot er applica le temu b g) h b sys s.
• Mar t e location in ma in tape and mar er penk h s us g sk g k .
• e t e correct ield de ice a per appro ed doc mentUs h f v s v u s.
• ollo man act rer in tr ction or in tallation pro ided in o pac o eac de iceF w uf u s u f s v b x/ k f h v .
A. A T A P T M MIR DIFFEREN I L RESSURE SWI CH - QB 81-3 / QB 81-5
• n tall t e pre re itc on t e e ipmentI s h ssu sw h h qu .
• T e pre re itc i ita le or mo ntin on air d ct or allh ssu sw h s su b f u g u s w s.
• T e pre re connection t e can e an len t t t e re pon e time increa e ih ssu ub s b y g h, bu h s s s s f
lon er t an meterg h 2 s.
Page Number 6 of 11
• Mo ntin in tr ction are enclo ed it t e en oru g s u s s w h h s s .
• anop all e in talled in ca e t e de ice i in talled in open o tdoor areaC y sh b s s h v s s u .
B. T A T MP AT AMDUC IR E ER URE SENSOR - Q 2112.040
• n tall t e en or on t e e ipment d ctI s h s s h qu / u .
• ocation or ppl air temperat re control o n tream rom t e an i t e an iL : F su y u : D w s f h f f h f s
located a ter t e la t air andlin nitf h s h g u .
• T e connection terminal can e acce ed a ter remo in t e co er a le entr i madeh s b ss f v g h v . C b y s
ia a rommet ic i re ired can e replaced a ca le entr land Mv g wh h, f qu , b by b y g 16.
• Mo ntin in tr ction are enclo ed it t e en oru g s u s s w h h s s .
• anop all e in talled in ca e t e de ice i in talled in open o tdoor areaC y sh b s s h v s s u .
• Mo ntin po itionu g s s:
C. M T T MCO BINED DUC /RH SENSOR - QF 2160
• Mo nt t e en or in t e centre o t e d ct all e ipment a per t e mo ntinu h s s h f h u w / qu s h u g
in tr ction pplied it t e en ors u s su w h h s s .
• it onl t e lan e to t e d ct all T e en or i t en in erted t ro t e lan e andF y h f g h u w . h s s s h s h ugh h f g
en a edg g .
• it t e en or it t e ca le entr pointin do n ardF h s s w h h b y g w w .
• Mo ntin in tr ction are enclo ed it t e en oru g s u s s w h h s s .
• anop all e in talled in ca e t e de ice i in talled in open o tdoor areaC y sh b s s h v s s u .
B. T A T MP AT AMDUC IR E ER URE SENSOR - Q 2112.040
• n tall t e en or on t e e ipment d ctI s h s s h qu / u .
• ocation or ppl air temperat re control o n tream rom t e an i t e an iL : F su y u : D w s f h f f h f s
located a ter t e la t air andlin nitf h s h g u .
• T e connection terminal can e acce ed a ter remo in t e co er a le entr i madeh s b ss f v g h v . C b y s
ia a rommet ic i re ired can e replaced a ca le entr land Mv g wh h, f qu , b by b y g 16.
• Mo ntin in tr ction are enclo ed it t e en oru g s u s s w h h s s .
• anop all e in talled in ca e t e de ice i in talled in open o tdoor areaC y sh b s s h v s s u .
• Mo ntin po itionu g s s:
C. M T T MCO BINED DUC /RH SENSOR - QF 2160
• Mo nt t e en or in t e centre o t e d ct all e ipment a per t e mo ntinu h s s h f h u w / qu s h u g
in tr ction pplied it t e en ors u s su w h h s s .
• it onl t e lan e to t e d ct all T e en or i t en in erted t ro t e lan e andF y h f g h u w . h s s s h s h ugh h f g
en a edg g .
• it t e en or it t e ca le entr pointin do n ardF h s s w h h b y g w w .
Page Number 7 of 11
• T e en in element in ide t e mea rin tip are en iti e to impact A oid an impacth s s g s s h su g s s v . v y
on mo ntinu g.
• anop all e in talled in ca e t e de ice i in talled in open o tdoor areaC y sh b s s h v s s u .
D. T P MDUC RESSURE SENSOR- QB 2030-10
• n tall t e en or on t e d ct a per t e location in t e dra in in t e mo ntinI s h s s h u s h h w g us g h u g
in tr ction pplied it t e en ors u s su w h h s s .
• T e pplied meter P t in can e modi ied to t e d ct connection on t e planth su 2 VC ub g b f h u h .
• T e di erential pre re en or m t e mo nted it t e nipple acin do nh ff ssu s s s us b u w h h s f g w .
• anop all e in talled in ca e t e de ice i in talled in open o tdoor areaC y sh b s s h v s s u .
• T e pre re t in or t e en or nipple i connected a ollo to t e di erentialh ssu ub g f h s s s s s f ws h ff
pre re en orssu s s s:
• T e en in element in ide t e mea rin tip are en iti e to impact A oid an impacth s s g s s h su g s s v . v y
on mo ntinu g.
• anop all e in talled in ca e t e de ice i in talled in open o tdoor areaC y sh b s s h v s s u .
D. T P MDUC RESSURE SENSOR- QB 2030-10
• n tall t e en or on t e d ct a per t e location in t e dra in in t e mo ntinI s h s s h u s h h w g us g h u g
in tr ction pplied it t e en ors u s su w h h s s .
• T e pplied meter P t in can e modi ied to t e d ct connection on t e planth su 2 VC ub g b f h u h .
• T e di erential pre re en or m t e mo nted it t e nipple acin do nh ff ssu s s s us b u w h h s f g w .
• anop all e in talled in ca e t e de ice i in talled in open o tdoor areaC y sh b s s h v s s u .
• T e pre re t in or t e en or nipple i connected a ollo to t e di erentialh ssu ub g f h s s s s s f ws h ff
pre re en orssu s s s:
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Page Number 8 of 11
E. A M A M T P A A MPPIRFLOW E SURE EN ROBE - X- V-
• n tall t e pro e on t e d ct a per t e mo ntin in tr ction pplied it t e en orI s h b h u s h u g s u s su w h h s s .
• T e A A MPP ran e o m lti point air elocit pro e are mo nted acro t e air loh X- V- g f u v y b s u ss h f w
in A d ctF HU u s.
• t ill e in talled in con nction it t eI w b s ju w h h MQB 2030-10 di erential pre re en or toff ssu s s
i e an analo e o tp t o t e air log v gu u u f h f w.
• rotatin t e tatic pro e t e e ect o t r lent air on air lo mea rement can eBy g h s b , h ff s f u bu f w su s b
miti atedg .
• Mo nt t e pro e acro t e d ct appro imatel mm apart t e pro e are to eu h b s ss h u , x y 100 . If h b s b
mo nted near a ranc or a end in a rectan lar d ct t en mo nt a o e eac ot eru b h b gu u h u b v h h
appro imatel mm apartx y 100 .
• e a lan e a a template to mar t e d ct or and drill t e mo ntin ole n ert t eUs f g s k h u w k h u g h s. I s h
pro e t ro t e lan e and en re t e are ot po itioned centrall it in t e d ctb h ugh h f g s, su h y b h s y w h h u .
• T rn t e total pre re pro e o t at t e ole ace directl into t e air lo oc intou h ssu b s h h h s f y h f w. L k
po ition in t e Allen ead cre on t e lan e Ad t t e peed o t e an to i e as us g h -h s ws h f g s. jus h s f h f g v
no n air elocitk w v y.
• T rn t e tatic pre re pro e o t at a di erential pre re corre pondin to t e no nu h s ssu b s h ff ssu s g h k w
air elocit i mea red acro t e t o pro e oc in po ition in t e Allen eadv y s su ss h w b s. L k s us g h -h
cre on t e lan e t e an peed ad tment i not po i le mea re t e air elocits ws h f g s. If h f s jus s ss b su h v y
it an anemometer or imilar de ice to carr o t proced re a a o ew h s v y u u s b v .
E. A M A M T P A A MPPIRFLOW E SURE EN ROBE - X- V-
• n tall t e pro e on t e d ct a per t e mo ntin in tr ction pplied it t e en orI s h b h u s h u g s u s su w h h s s .
• T e A A MPP ran e o m lti point air elocit pro e are mo nted acro t e air loh X- V- g f u v y b s u ss h f w
in A d ctF HU u s.
• t ill e in talled in con nction it t eI w b s ju w h h MQB 2030-10 di erential pre re en or toff ssu s s
i e an analo e o tp t o t e air log v gu u u f h f w.
• rotatin t e tatic pro e t e e ect o t r lent air on air lo mea rement can eBy g h s b , h ff s f u bu f w su s b
miti atedg .
• Mo nt t e pro e acro t e d ct appro imatel mm apart t e pro e are to eu h b s ss h u , x y 100 . If h b s b
mo nted near a ranc or a end in a rectan lar d ct t en mo nt a o e eac ot eru b h b gu u h u b v h h
appro imatel mm apartx y 100 .
• e a lan e a a template to mar t e d ct or and drill t e mo ntin ole n ert t eUs f g s k h u w k h u g h s. I s h
pro e t ro t e lan e and en re t e are ot po itioned centrall it in t e d ctb h ugh h f g s, su h y b h s y w h h u .
• T rn t e total pre re pro e o t at t e ole ace directl into t e air lo oc intou h ssu b s h h h s f y h f w. L k
po ition in t e Allen ead cre on t e lan e Ad t t e peed o t e an to i e as us g h -h s ws h f g s. jus h s f h f g v
no n air elocitk w v y.
• T rn t e tatic pre re pro e o t at a di erential pre re corre pondin to t e no nu h s ssu b s h ff ssu s g h k w
air elocit i mea red acro t e t o pro e oc in po ition in t e Allen eadv y s su ss h w b s. L k s us g h -h
cre on t e lan e t e an peed ad tment i not po i le mea re t e air elocits ws h f g s. If h f s jus s ss b su h v y
it an anemometer or imilar de ice to carr o t proced re a a o ew h s v y u u s b v .
Page Number 9 of 11
F. TAT P PLIQUID S IC RESSURE SENSOR - QBE2003- 16
• n tall t e pre re en or on t e pipe a per t e location on t e dra inI s h ssu s s h s h h w g.
• T e tappin point o ld e at t e ide near t e ottom o t e pipe o not mea re t eh g sh u b h s , h b f h . D su h
pre re rom t e top o t e pipe ere it ma e a ected airloc or t e ottomssu f h f h (wh y b ff by ks) h b
ere it ma e a ected dirt(wh y b ff by ).
• Mo ntin n tr ction are enclo ed it t e en oru g I s u s s w h h s s .
G. AM T T MP AT M T A ABIEN E ER URE & HU IDI Y SENSOR – QF 3160+ FQ3100
• n tall t e en or a per t e location in t e dra inI s h s s s h h w g.
• ocation terior all pre era l on t e ort or ort e tern ide o t e ildin iL : Ex w , f b y h N h N h-w s s f h bu g; f
po i le in t e middle o t e all at lea t a o e t e ro nd ot a o e or eloss b h f h w , s 2.5 b v h g u . N b v b w
indo a o e door and entilation a t elo alconie or ea ew ws, b v s v sh f s, b w b s v s.
• Mo ntin Po ition T e en or it A m t e mo nted in a ertical po itionu g s : h s s w h QF3100 us b u v s
radiation ield at t e top( sh h ).
• ote en in t e A o tdoor mo ntin it t e en or ca le entr ole m tN : Wh us g h QF3100 u u g k , h s s ’s b y h us
e clo ed o it t e rommet and t e prepared M ca le entr on t e oppo ite ideb s ff w h h g h 16 b y h s s
noc ed o tk k u .
• T e o tdoor mo ntin it con i t oh u u g k s s s f: • all mo ntin rac et complete it radiation1 w u g b k w h
ieldsh • P illip ead cre4 h s-h s ws K35 x 12 • rommet M it rin and n t M1 g 16 x 1.5 w h O- g u
or clo in o t e en or ca le entr ole i not re ired16 x 1.5 f s g ff h s s ’s b y h f qu .
F. TAT P PLIQUID S IC RESSURE SENSOR - QBE2003- 16
• n tall t e pre re en or on t e pipe a per t e location on t e dra inI s h ssu s s h s h h w g.
• T e tappin point o ld e at t e ide near t e ottom o t e pipe o not mea re t eh g sh u b h s , h b f h . D su h
pre re rom t e top o t e pipe ere it ma e a ected airloc or t e ottomssu f h f h (wh y b ff by ks) h b
ere it ma e a ected dirt(wh y b ff by ).
• Mo ntin n tr ction are enclo ed it t e en oru g I s u s s w h h s s .
G. AM T T MP AT M T A ABIEN E ER URE & HU IDI Y SENSOR – QF 3160+ FQ3100
• n tall t e en or a per t e location in t e dra inI s h s s s h h w g.
• ocation terior all pre era l on t e ort or ort e tern ide o t e ildin iL : Ex w , f b y h N h N h-w s s f h bu g; f
po i le in t e middle o t e all at lea t a o e t e ro nd ot a o e or eloss b h f h w , s 2.5 b v h g u . N b v b w
indo a o e door and entilation a t elo alconie or ea ew ws, b v s v sh f s, b w b s v s.
• Mo ntin Po ition T e en or it A m t e mo nted in a ertical po itionu g s : h s s w h QF3100 us b u v s
radiation ield at t e top( sh h ).
• ote en in t e A o tdoor mo ntin it t e en or ca le entr ole m tN : Wh us g h QF3100 u u g k , h s s ’s b y h us
e clo ed o it t e rommet and t e prepared M ca le entr on t e oppo ite ideb s ff w h h g h 16 b y h s s
noc ed o tk k u .
• T e o tdoor mo ntin it con i t oh u u g k s s s f: • all mo ntin rac et complete it radiation1 w u g b k w h
ieldsh • P illip ead cre4 h s-h s ws K35 x 12 • rommet M it rin and n t M1 g 16 x 1.5 w h O- g u
or clo in o t e en or ca le entr ole i not re ired16 x 1.5 f s g ff h s s ’s b y h f qu .
Page Number 10 of 11
H. PA PAS CE CO2 SENSOR – Q 2000D
• n tall t e en or a per t e location in t e dra inI s h s s s h h w g.
• ocation nner all o t e room to e entilated not in nic e not e ind c rtain notL : I w f h b v , h s, b h u s,
a o e or near eat o rce and not e po ed to direct li t rom potli tb v h s u s, x s gh f s gh s.
• o not e po e t e en or to direct olar radiationD x s h s s s .
• eal t e end o t e cond it at t e en or to pre ent al e mea rement d e to dra tS h f h u h s s v f s su s u f s
t ro t e cond ith ugh h u .
I. M TAT T A M TT A MSUB ERSIBLE HYDROS IC LEVEL R NS I ER - X-HL-V-5 10
• n tall t e tran mitter a per t e location on t e dra inI s h s s h h w g.
• T e A erie o mer i le le el tran mitter o ld e in talled a ita lh X-HL s s f sub s b v s s sh u b s by su b y
ali ied tec nician in accordance it an ideline or t e de ice and t e e ipmentqu f h w h y gu s f h v h qu
ic it i to e connected towh h s b .
• ield irin o ld e in talled to ati t e re irement et o t t e man act rerF w g sh u b s s sfy h qu s s u by h uf u
o t e e ipment ein connected tof h qu b g .
• A a r le creened ca le o ld e ed to connect i nal to a controllers u , s b sh u b us s g DDC .
H. PA PAS CE CO2 SENSOR – Q 2000D
• n tall t e en or a per t e location in t e dra inI s h s s s h h w g.
• ocation nner all o t e room to e entilated not in nic e not e ind c rtain notL : I w f h b v , h s, b h u s,
a o e or near eat o rce and not e po ed to direct li t rom potli tb v h s u s, x s gh f s gh s.
• o not e po e t e en or to direct olar radiationD x s h s s s .
• eal t e end o t e cond it at t e en or to pre ent al e mea rement d e to dra tS h f h u h s s v f s su s u f s
t ro t e cond ith ugh h u .
I. M TAT T A M TT A MSUB ERSIBLE HYDROS IC LEVEL R NS I ER - X-HL-V-5 10
• n tall t e tran mitter a per t e location on t e dra inI s h s s h h w g.
• T e A erie o mer i le le el tran mitter o ld e in talled a ita lh X-HL s s f sub s b v s s sh u b s by su b y
ali ied tec nician in accordance it an ideline or t e de ice and t e e ipmentqu f h w h y gu s f h v h qu
ic it i to e connected towh h s b .
• ield irin o ld e in talled to ati t e re irement et o t t e man act rerF w g sh u b s s sfy h qu s s u by h uf u
o t e e ipment ein connected tof h qu b g .
• A a r le creened ca le o ld e ed to connect i nal to a controllers u , s b sh u b us s g DDC .
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Page Number 11 of 11
M A T M ATB S C BLE ER IN ION
• M ca le contin it te t report o ld e a aila le prior to termination o ca leB S b u y s sh u b v b f b s.
• eri ca le contin it e ore M ca le terminationV fy b u y b f B S b .
• n re ca le are tied and dre ed neatlE su b s ss y.
• e correct i e ca le l and err le on t e ca leUs s z b ugs f u h b s.
• onnect to t e de i nated terminal at t e ield and panel ide a per t e irin detailC h s g h f s s h w g s.
• n re no copper i e po ed et een l and ca le o ter eat en re no o ter eat i ca tE su s x s b w ugs b u sh h, su u sh h s ugh
in t e terminationh .
• eat rin a le lee e ill e ed to co er are part o crimped l ile terminatin andH sh k b s v w b us v b f ugs wh g
connectin t e ca le ere er applica leg h b s wh v b .
TA AT M TATINS LL ION OF B S WORKS ION
• T e M or tation ill e in talled in t e de i nated location and ill tili e t e P net or orh B S w ks w b s h s g w u z h I w k f
comm nicationu .
• t i recommended t at indi id al po er oc et or t e er er or tation and di pla areI s h v u w 230V s k s f h s v /w ks s y
pro ided to en re a ta le electrical ppl to t e temv su s b su y h sys .
• T e monitor ill to e connected to t e er er or tation in t e ca le pplied t eh w b h s v /w ks us g h b su by h
man act reruf u .
• T e man act rer pplied e oard and mo e ill e connected to t e er er or tationh uf u su k yb us w b h s v /w ks .
• eport printer and Alarm printer ill e in talled ne t to t e or tation and connected to t e PR w b s x h w ks h C U.
M A T M ATB S C BLE ER IN ION
• M ca le contin it te t report o ld e a aila le prior to termination o ca leB S b u y s sh u b v b f b s.
• eri ca le contin it e ore M ca le terminationV fy b u y b f B S b .
• n re ca le are tied and dre ed neatlE su b s ss y.
• e correct i e ca le l and err le on t e ca leUs s z b ugs f u h b s.
• onnect to t e de i nated terminal at t e ield and panel ide a per t e irin detailC h s g h f s s h w g s.
• n re no copper i e po ed et een l and ca le o ter eat en re no o ter eat i ca tE su s x s b w ugs b u sh h, su u sh h s ugh
in t e terminationh .
• eat rin a le lee e ill e ed to co er are part o crimped l ile terminatin andH sh k b s v w b us v b f ugs wh g
connectin t e ca le ere er applica leg h b s wh v b .
TA AT M TATINS LL ION OF B S WORKS ION
• T e M or tation ill e in talled in t e de i nated location and ill tili e t e P net or orh B S w ks w b s h s g w u z h I w k f
comm nicationu .
• t i recommended t at indi id al po er oc et or t e er er or tation and di pla areI s h v u w 230V s k s f h s v /w ks s y
pro ided to en re a ta le electrical ppl to t e temv su s b su y h sys .
• T e monitor ill to e connected to t e er er or tation in t e ca le pplied t eh w b h s v /w ks us g h b su by h
man act reruf u .
• T e man act rer pplied e oard and mo e ill e connected to t e er er or tationh uf u su k yb us w b h s v /w ks .
• eport printer and Alarm printer ill e in talled ne t to t e or tation and connected to t e PR w b s x h w ks h C U.
1 out of 11
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.