logo

Business Information Modelling in Construction and Engineering

   

Added on  2023-06-11

8 Pages1400 Words425 Views
MODELLING IN CONSTRUCTION AND ENGINEERING 1
Business Information Modelling in Construction and Engineering
Name (By)
Institution
Location of Institution
Course Details
Date

MODELLING IN CONSTRUCTION AND ENGINEERING 2
Business Information Modelling in Construction and Engineering
Table of Contents
Justification...........................................................................................................................................3
Research Objectives..............................................................................................................................3
Sub- Objective...................................................................................................................................3
Hypothesis.............................................................................................................................................3
Project Plan...........................................................................................................................................5
Milestones.........................................................................................................................................5
Milestone 1:...................................................................................................................................5
Milestone 2....................................................................................................................................5
Milestone 3....................................................................................................................................6
Milestone 4....................................................................................................................................6
Milestone 5....................................................................................................................................6
Milestone 6....................................................................................................................................6
Timeline............................................................................................................................................6
Project Plan- Strategy- Experimental Plan.............................................................................................6
References.............................................................................................................................................8

MODELLING IN CONSTRUCTION AND ENGINEERING 3
Justification
In the recent days, the technological advancement has continued to increase its
application in the construction and building disciple. In fact, it has made it possible to carry
out various activities such as designing, modelling and analyzing the prototypes in line with
construction as well as in developing documentations and manuals for the proposed building
activities. Thus, this paper aims at exploring business information modelling in construction
and various activities which they have work hand in hand with to enhance and improve the
construction works as a whole.
Research Objectives
The aim of the project is to provide business information applied in modelling in construction
and engineering.
Sub- Objective
Identification of important milestones phase by phase and developing a particular
timeline and thereafter complete every stage within the stipulated time.
Overwhelming all the specific barriers towards the attainment of the aim of the
project through identification and provision of possible solutions and such obstacles
revolve around financial risks, environmental risks, and technological barriers.
To apply a variety of technologies both the past and present and utilize the positives
ones and developing them to help in the attainment of the aim of the project.

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Building Information Modelling: Project Execution and Collaboration
|31
|2714
|21

Building Information Modelling: Project Execution, Collaboration, and Artefacts
|29
|2505
|100

The turbulent scenario of the organization
|15
|3324
|30

Digital Engineering Case Study 2022
|14
|3454
|14

Building Information Modelling
|14
|3487
|294

Assessment of Collaborative Procurement Mechanisms in Construction
|5
|1623
|77