logo

Calculation Methodology of Excavation Plans

   

Added on  2022-09-01

4 Pages347 Words17 Views
 | 
 | 
 | 
Query Reply Date/ Correspondent
The presence of the file so that
there is proper review of the
layout plan?
The excavation quantities for
all the building elements
Retention works that may
need to be considered?
Calculation methodology of
the excavation plans
The clearance quantity
estimated error and the
regulation standards
Is there the presence of
retaining walls?
The types of foundations that
should be considered in the
design? And the criteria used?
The cut and fill volume ratio?
The presence of services that
may be of immense concern in
the construction?
What are the geotechnical
investigations on the soil?
Calculation Methodology of Excavation Plans_1

What criteria make the method
suitable?
What did the reconnaissance
survey indicate about the land
and any restriction or any
regulations?
What is the methodology used
In calculating the depth and
width of the slabs, beams and
columns? Are they efficient in
the design?
What are the criteria used I the
design of the roof system? Are
there any considerations on
the applicability of any
recommended system?
What is the process that has
been used in the establishment
of the utilities and the
drainage systems? Are the
criteria sufficient to ensure
proper removal and
elimination fongreywater and
Calculation Methodology of Excavation Plans_2

End of preview

Want to access all the pages? Upload your documents or become a member.