This is the career resume of Lenin Fernando, including his educational qualifications, work experience, professional attributes, and major projects.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Career Resume Personal Details Name:Lenin Fernando Nationality:Please fill E-mail:lenin054@gmail.com Mobile:0448 400 629 Date of Birth:Please fill Address:25 Lilyturf Drive, Tarneit, VIC 3029, Australia Marital Status:Please fill Career Conspectus To secure a position in the field of Heating Ventilation Air Conditioning & Refrigeration that would enable me to utilize my skills in engineering and management knowledge while applying my desire for independent work that displays my creativity for innovation and deliver projects to highest quality standards adhering to health, safety and environmental aspects. Educational Qualification Serial No.ExaminationSchool/UniversityYear of Passing Percentage 1.B. Sc in Mechanical and Manufacturing Engineering University of Ruhuna, Sri Lanka Please fillPlease fill Work Experience DurationPositionCompanyResponsibilities July 2018 to Present Project Coordinator Epsicon(Pty) Ltd, Australia. – Contractorfor NBN Project Leadingwork force for Installation of Pit,TrenchingworksandCable hauling works to meet the compliance and deadlines. ObtainingDBYDplans,Asbuilt drawings, Identifying existing services bymeansoftheServiceLocator, henceobtainingapprovalforthe
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
execution works. Concludingsolutionsforonsite problems,ensuringhealthandsafe working environment and coordinating with main contractor. Materialprocurementandusing efficientmanagerialtechniquesfor consumables. PreparingInspectionreportsand handing over documents and attending tomonthlyprogressmeetingswith main contractor. Preparing progress reports. Septembe r 2015 to July 2018 Mechanical Engineer(H VAC) Abans Engineering (PVT)Ltd,Sri Lanka.-Sole Authorized Agentfor TRANE Equipment& MITSUBISHI ELECTRIC VRF Systems LeadingprojectteamsforAir Conditioning and Ventilation System installations. Site inspection based on job inquiries, designingofenergyefficientand appropriateHVACSystemand preparing estimation. Leadingdraftsmantoprepare construction and coordination drawing based on Architectural drawing. Preparation of technical submissions, project plan and project cost summary. Material procurement. Preparing project plans and coordinate with both internal and external project stakeholders, including sub-contractors andconsultantstomeetcompliance and deadlines. Ensuring that the most energy efficient and reliable design is achieved in terms oftheAirconditioningsystem perspective. Project management from the technical division perspective & supervision of HVAC system installations from the pointofsaletothepointof commissioningwhichincludes, Purchasing,Procurement,Site management, Contractor management andRunningmultipleprojects simultaneously. Novembe r 2012 to August 2015 Mechanical Engineer (MEP) ShinNippon Lanka(PVT) Ltd Preparing project plans and coordinate with both internal and external project stakeholders, including sub-contractors andconsultantstomeetcompliance
and deadlines. Designingandcarryingoutvalue engineeringworksandtechnical review,materialprocurementand TestingandCommissioningof following Systems: Air Conditioning and Ventilation System, Plumbing & HotWatergenerationsystem,Fire Protection system, Sewer and Waste water Drainage System and Swimming Pool System. Septembe r 2010 to October 2012 Mechanical Engineer (HVAC) Metropolitan Air Conditioning& Refrigeration (PVT) Ltd. Sole Authorized Agent of YORK equipment in Sri Lanka LeadingprojectteamsforAir Conditioning and Ventilation System installations. Site inspection based on job inquiries, designingofenergyefficientand appropriateHVACSystemand preparing estimation. Leadingdraftsmantoprepare construction and coordination drawing based on Architectural drawing. Preparation of technical submissions, project plan and project cost summary. Material procurement. Prepare project plans and coordinate with both internal and external project stakeholders, including sub-contractors andconsultantstomeetcompliance and deadlines. Ensuring that the most energy efficient and reliable design is achieved in terms oftheAirconditioningsystem perspective. Project management from the technical division perspective & supervision of HVAC system installations from the pointofsaletothepointof commissioningwhichincludes, Purchasing,Procurement,Site management, Contractor management andRunningmultipleprojects simultaneously. Professional Attributes Design ofHeating Ventilation and Air Conditioning Systems: Strong hands on technical experience in designing of Air Conditioning systems, Ventilation systems, Sizing & Installation of Ducting and Piping works.
ProjectManagement Skills: Contract management, managing stakeholders to bring customised projects to success, effective time management, and budgeting, planning, forecasting, variance analysis and field supervision. CommunicationSkills: Able to effectively liaise with people of different levels and preparation of engineering and financial reports intended for various audiences. TeamWork: Creating a knowledge sharing culture through collaboration, motivate and lead by example in order to bring projects to success. Managemultiple projects and work effectively during times of pressure: Able to prioritize tasks well and manage expectationsof all stakeholders while paying attention to detail. Major Projects in Shin Nippon Lanka (PVT) Ltd. Execution and Value engineering works for 5 Star Rating Hotel with 129 Guest rooms with a Total project estimated value of USD 38.0M. Design,Execution and Value engineering works for 16 Storied City Hotel with a Total project estimated value of USD 25.6M. Major Projects in Metropolitan Air Conditioning & Refrigeration (PVT) Ltd. Execution and Value engineering works for the memorial lecture hall at Defence university with a Water-Cooled Chiller with Total project estimated value of USD 11.0M. Design, Execution and Value engineering works for Unilever Sri Lanka factory with a Total project estimated value of USD 8.6M Selected Accomplishments Knowledge on international HVAC standards and capability to lead – 2017: Sentra Supercity (7 Storied Office Complex) – Colombo Sri Lanka – Design and Execution the project with estimated value of USD 15.0M; Negotiating to a closure, executionofinstallationandcommissioning,managingbothtechnicallyand commercially. The most energy efficient design was achieved after analyzing the requirement of the customer and adopting the latest technologies available. Problemsolving and technical adaptability – 2016: Designing and Installation of a systemtoCombineofTRANEAHUwithMITSUBISHIELECTRICVRF Condensing Unit (use of External Expansion Kit) - First such system in Sri Lanka. Project Management– 2016: Installation and commissioning of Water-Cooled ChillerSystemwithTRANEEquipmentwiththecapacityof200RT.Iwas recognized by the company as the outstanding young engineer for the way the project was managed and commissioned. Technical Attributes Advance skills in AUTO CAD, MS Projects and TRACE 700. Advanceindustrial experience in equipment selection with Trane Official Product Selection System (TOPPS), YORK Equipment Selection tools and Mitsubishi Electric VRF System (CITY MULTI). Advance industrial experience in Pump sizing, Pipe sizing and Duct sizing tools. AdvanceindustrialexperienceinCentralAir-ConditioningSystems,Building Management Systems, Plumbing Systems, Fire Protection System, Sewer and Water Treatment and Swimming Pool Systems.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Experienceinassetmanagement,energymanagementandenergyefficiency practices. Charity and Voluntary Work 2009: Shin Nippon Lanka (PVT) Ltd. – Training Engineer (HVAC). 2010: Sri Lanka Ports Authority – Training Engineer. 2011: Society of Mechanical and Manufacturing Engineers, University of Ruhuna – Member. Declaration: I, the undersigned, hereby declare that information furnished above is true, correct & complete to the best of my knowledge. Date:Signature (LENIN FERNANDO)