The report provides an outlay for the power plant construction by CS Energy. The advantages and disadvantages have been measured. On performing a scenario analysis, the good situation and bad situation were identified. A discounting rate of 8.32% was proven to be optimum as it helped to make the Net Present Value to zero. The risks were identified and the protective measures taken by the company were stated. An approval from the Government is required to begin the work.