logo

Analysis of General Information and Renewable Energy Project Management Factors

   

Added on  2022-11-24

26 Pages4107 Words348 Views
CHAPTER FOUR & CHAPTER FIVE
Analysis of General Information and Renewable Energy Project Management Factors_1
CHAPTER FOUR & CHAPTER FIVE
CHAPTER FOUR
4.1. ANALYSIS OF THE GENERAL INFORMATION OF PARTICIPANT
This study collected the participants’ general information with regards to their current
professional occupation, age, gender, professional qualification, work experience, team size and
the duration of their current projects. The distribution of the participants’ general information is
presented in Table 1: Summary of the Participants’' General Information below. The highlighted
figures in Table 1: Summary of the Participants’' General Information below represent the
highest percentages for each of the aspects of the participants’ general information.
Table 1: Summary of the Participants’' General Information
Frequency Percent
Current Professional
Occupation of Participant
Electrical Engineer 20
Program Director 26 13
Project Engineer 38 19
Project Manager 23 11.5
Renewable Engineer 32 16
Team Member 61 30.5
Total 200 100
Age
20-30 34 17
31-40 86 43
41-50 59 29.5
Above 51 21 10.5
Total 200 100
Gender
Female 82 41
Male 118 59
Total 200 100
Qualifications Bachelor Degree 67 33.5
Diploma 19 9.5
2
Analysis of General Information and Renewable Energy Project Management Factors_2
CHAPTER FOUR & CHAPTER FIVE
Master Degree 88 44
Others 3 1.5
PHD or Higher 23 11.5
Total 200 100
Work Experience
1 to 3 Years 91 45.5
4 to 6 Years 70 35
Above 6 Years 10 5
Less Than a Year 29 14.5
Total 200 100
Team Size
0 to 10 members 38 19
11-20 members 94 47
21-30 members 36 18
31-40 members 19 9.5
40 and above 13 6.5
Total 200 100
Duration of Current
Project
1 to 2 Years 60 30
2 to 3 Years 69 34.5
3 to 4 Years 55 27.5
Above 4 Years 16 8
Total 200 100
4.2. ANALYSIS OF RENEWABLE ENERGY PROJECT MANAGEMENT FACTORS
3
Analysis of General Information and Renewable Energy Project Management Factors_3
CHAPTER FOUR & CHAPTER FIVE
4.2.1. CRITERIA OF RENEWABLE ENERGY PROJECT MANAGEMENT
The participants’ response on the aspects of the criteria of renewable energy project management
is summarized in Table 2: Criteria of Renewable Energy Project Management and Figure 1:
Criteria of Renewable Energy Project Management below. Considering the criteria that most
participants strongly agreed with we observe that 43% of the participants strongly agreeing with
Support for Top Management, hence Support for Top Management is the main criteria for
success in Project Management in Oman.Table 2: Criteria of Renewable Energy Project Management
Strongly
Disagree
Disagree Neutral Agree Strongly
Agree
Competence of project
manager
0% 0% 36.5% 38.5% 25.0%
Competence of project team
members
0% 0% 38.5% 40.5% 21.0%
Stability of political
environment
0% 0% 24.0% 39.5% 36.5%
Support of top management 0% 0% 16.0% 41.0% 43.0%
Effective coordination of
project activities
0% 0% 32.5% 34.0% 33.5%
Competence and adequate
support from a project
consultant
0% 0% 40.5% 24.0% 35.5%
Access to organizational
resources
0% 0% 31.0% 37.5% 31.5%
Compliance with the rules and
procedures
0% 0% 21.5% 43.5% 35.0%
Stability of economic
environment
0% 0% 33.0% 44.5% 22.5%
Project managers technical
capabilities
0% 0% 34.5% 43.5% 22.0%
4
Analysis of General Information and Renewable Energy Project Management Factors_4
CHAPTER FOUR & CHAPTER FIVE
Figure 1: Criteria of Renewable Energy Project Management
4.2.2. PROJECT INTEGRATION
The participants’ response on the aspects of project integration is summarized in Table 3: Project
Integration and Figure 2: Project Integration below. Considering the aspect of Project Integration
that most participants strongly agreed with we observe that 37.5% of the participants strongly
agreed with Monitor and Control of Project Work, hence Monitor and Control of Project Work is
the main critical factor of success with respect to Project Integration.
5
Analysis of General Information and Renewable Energy Project Management Factors_5
CHAPTER FOUR & CHAPTER FIVE
Table 3: Project Integration
Strongly
Disagree
Disagree Neutral Agree Strongly Agree
Develop Project
Agreement and
Management Plan
0.00% 0.0% 30.5% 39.5% 30.0%
Direct and Manage
Project Work
0.00% 12.5% 32.0% 40.0% 15.5%
Monitor and Control
Project Work
0.00% 0.0% 42.5% 20.0% 37.5%
Perform Integrated
Change Control
0.00% 0.0% 26.0% 39.0% 35.0%
Close Project or
phase
0.00% 8.5% 38.0% 28.5% 25.0%
Figure 2: Project Integration
6
Analysis of General Information and Renewable Energy Project Management Factors_6

End of preview

Want to access all the pages? Upload your documents or become a member.