This document discusses the activities, techniques, and equipment used in civil engineering technology. It covers topics such as earthworks, creation of complex foundations, underpass construction, and safety arrangements. It also explores the evaluation of quality, economic, geotechnical, and environmental aspects of construction projects.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Civil Engineering Technology
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Table of Contents INTRODUCTION...........................................................................................................................1 MAIN BODY...................................................................................................................................1 Task 1.....................................................................................................................................1 Activities, techniques and equipment of earthworks....................................................1 Creation of complex foundations, drainage works and piling works using different methods .......................................................................................................................................2 Underpass construction, culvert construction & provision for utilities methods..........3 Task 2.....................................................................................................................................3 Hazards & safety arrangements for working in confined spaces, excavations, working within temporary works on highways & working on structures..................................3 Developing and presenting a risk assessments & site safety plan................................4 Task 3.....................................................................................................................................5 Evaluation of quality, economic, geotechnical & environmental context of a given problem .......................................................................................................................................5 Proposing a resolution to a given problem....................................................................6 Task 4.....................................................................................................................................6 Developing a new infrastructure project in context of civil engineering design..........6 CONCLUSION................................................................................................................................7 References:.......................................................................................................................................9
INTRODUCTION Civilengineeringtechnologycanbedefinedasthearchitecturalfieldinwhich construction of buildings and roads takes place in a safe and sustainable manner(Nnaji, Lee, Karakhan and Gambatese, 2018). Given scenario states the construction of the highway and the following discussions is made in context of highway construction such as activities, techniques and equipment of earthworks, creation of complex foundations, drainage works and piling works using different methods, underpass construction, culvert construction & provision for utilities methods, hazards & safety arrangements for working in confined spaces, excavations, working within temporary works on highways & working on structures, developing and presenting a risk assessments & site safety plan, evaluation of quality, economic, geotechnical & environmental context of a given problem, proposing a resolution to a given problem, developing a new infrastructure project in context of civil engineering design with proper findings and conclusion. MAIN BODY Task 1 Activities, techniques and equipment of earthworks Excavators It is one of the technique of earthworks that is the excavators which means that it consist of the dipper, boom, bucket and rotation facility so that it can be bake to pick up the raw materials and can transfer from one place to another in a safe manner. Backhoe loader It is an another technique of earthworks that is the backhoe loader which means that it has a similar work to a excavators and it has a truck like structure used to work on the materials for the construction process makes the work easier. Bulldozer It is also the one of the technique of earthworks that is the bulldozer which means that it has a tractor like work which is used to push and pull the soil, sand, stones, rubble and many more materials which makes the work convenient(Wang, Niu, Chen and Dong, 2020). Skid-steer loader 1
It is also an another technique of earthworks that is the skid-steer loader which means that it is a machine which is a small, engine-powered and rigid frame machine use to carry a wide variety of labour saving tools or attachments. Motor grader It is one of the technique of earthworks that is the motor grader which means that it is a construction machine which consist long blade that is used to create the surface in a flat form at the time of grading process. Creation of complex foundations, drainage works and piling works using different methods Explosion It is an another method to create the piling and drainage works that is the explosion which means that it is a ground modification method in which the release of the energy from setting off explosives inducing artificial effects in earthquake which compact the layers of the soil. Vibration It is also the one of the method to create the piling and drainage works that is the vibration which means that they are the oscillatory motions which are experiences through floors or flat surface areas either in a vertical or in a horizontal manner(Somboonpisan and Limsawasd, 2021). Jacking It is also an another method to create the piling and drainage works that is the jacking which means that it is highly involved in a rectangular site cast or other shaped sections which uses high capacity hydraulic jacks. The structure is generally reinforced concrete at a site to where it is being installed. Jetting It is one of the method to create the piling and drainage works that is the jetting which means that it is a process to make a jet liquids under high pressure to develop the guided bore through loose soil in order to clean the downhole drilling components. 2
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Underpass construction, culvert construction & provision for utilities methods Earth road method It is one of the method used in culvert and underpass construction that is the earth road method which means that it is famous in rural and semi rural areas, it does not require much skill to implement but need machinery such as rollers and excavators. Gravel road It is an another method used in culvert and underpass construction that is the gravel method which means that it is famous in rural, semi urban and semi rural areas, it has a similar process just like earth road but it adds the layer of gravel as well. Bituminous road It is also the one of the method used in culvert and underpass construction that is the bituminous road which means that it is the most used method because of its flexibility as it is made up of four layers in which the bottom layer is the thickest and the top layer is the thinnest one(Ibrahim and Shaker, 2019). Water bound macadam It is also an another method used in culvert and underpass construction that is the water bound macadam which means that it is the method which includes the interlocked aggregates which are broken and are bound with water and filler materials in which there is a compactness of the base course. Concrete road It is one of the method used in culvert and underpass construction that is the concrete road which means that this method uses the combination of Portland cement and asphalt. It is most famous in the urban areas in which the edges are made thicker than the middle portion. Task 2 Hazards&safetyarrangementsforworkinginconfinedspaces, excavations, working within temporary works on highways & working on structures Hazards 3
Falling It is one of the hazard at construction site that is the falling which means that there are various objects which cannot be controlled at height by the human beings and even with the machine as well so sometimes they fall and destroy the major activities of construction. Being struck by an object It is an another hazard at construction site that is the being struck by an object which means that materials at the site are hard and tough to carry so there is a risk to manage and control such hazard of not struck the by an object as it can take the life of a person also (Thapanont, Santi and Pruethipong, 2018). Getting caught in equipment It is also an another hazard at construction site that is the getting caught in equipment which means that machines used at the site is not safe in using even by the experts as well because they can change its behaviour of working at any case so it is important to make the safety measures for the same. Safety arrangements Wear high visibility clothing It is one of the safety arrangements at construction site that is the wear high visibility clothing which means that the human who are working at the site must be provided with the clothing which us safe for them and safeguards them from any hazardous incident such as visibility in clothing can help for the same. Understanding communication signals It is an another safety arrangements at construction site that is the understanding communication signals which means that people are required to taught the signals at the site which are risky so that they can not perform those activities which can be hazardous for them. Developing and presenting a risk assessments & site safety plan Preventtrafficfrom enteringworkareas It is one of the risk assessment at construction site that is the prevention traffic from entering work areas which means that how would be able to know the people that any construction work is going on the further road, so therefore, some signals must be provided in order to warn about risk ahead. 4
Provide protection to workers It is an another risk assessment at construction site that is the protection to workers which means that workers who are working at the site must be provided with the safety equipment such as helmets, protective clothing, hand gloves and many more so that they cannot suffer any risk regarding it(Chini, Ptschelinzew, Minchin Jr and Shah, 2018). Separate two-waytraffic It is also the one of the risk assessment at construction site that is the separate two way traffic which means that at the site, it is important to manage the traffic either in the one sided or in the two way road as per the needs and requirements of the construction without getting any hurt to the people or any one. Task 3 Evaluationofquality,economic,geotechnical&environmental context of a given problem Recycling of Cement Concrete Pavement Slabs It is one of the environmental context at construction site that is the recycling of cement concrete pavements slabs which means that concrete slabs which are cemented can be recycled and used again in further process without any wastage so it must be recycled for better sustainability. Reclaimed Asphalt Pavement It is an another environmental context at construction site that is the reclaimed asphalt pavement which means that asphalt type which can be reclaimed must be surely done as it saves cost and time to recreate the same in order to maintain sustainability in construction. Hot Mix Asphalt Bag house Fines and Sustainable Pavements It is also the one of the environmental context at construction site that is the hot mix asphalt bag house fines and sustainable pavements which means that the gases which are used are combined with the dust particles and needed to be separated out for sustainability(Alleman and Tran, 2020). Blast Furnace Slag in Sustainable Pavements 5
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
It is also an another environmental context at construction site that is the blast furnace slag in sustainable pavements which means that the usage of slag in the form of blast furnace can provide better sustainability to the construction. Proposing a resolution to a given problem Training road construction workers It is one of the solution that is the training road construction workers which means that developing and educating the workers is necessary about the methods and techniques of construction process along with the risks associated with it followed by the measures taken to sort out the hazards. Decreasing the fossil fuels energy consumption It is an another solution that is the decreasing the fossil fuels energy consumption which means that using of the fossil fuels must be reduced so that there could be the less chances of risk and moreover, it can also maintain the sustainability at the site(Sohu, Jhatial, Ullah and Shahzaib, 2018). Using dust control measures It is also the one of the solution that is the using dust control measures which means that taking the measures of controlling the dust is an essential function because it helps the workers to conveniently work at the site without any rusk of health problems(Noorzai, 2020). Dynamic paint It is one of the solution that is the dynamic paint which means that the materials which is used by the owner of the construction such as paint must be used in a dynamic form because it contains the mixture of several elements which reduces the risks of getting any health problems to living beings. Task 4 Developing a new infrastructure project in context of civil engineering design Innovation, Technological and economic Feasibility It is one of the part of design proposal that is the innovation, technological and economic feasibility which means that analysis of the new idea along with the technical and economic 6
study is an essential feasibility so that availability of resources can be determined and budgets as well(Ruggeri, Fruzzetti and Scarpelli, 2019). Design Methodology It is an another part of design proposal that is the design methodology which means that paper prototype is important to design before switching to the direct implementation of it so that it can get the idea of execution process. Physical Structures It is also the one of the part of design proposal that is the physical structures which means that formation of the physical structure is necessary so that the sequencing can be easy to figure out about the process in construction and implementation part(Al-Zwainy and Mezher, 2018). Construction Site Environment It is one of the part of design proposal that is the constriction site environment which means that examining and scanning of the environment of the construction site is crucial to know about the toughness of the land and many more analysis so that accordingly materials can be used to construct(Antoniou and Aretoulis, 2018). Computer-Aided Engineering It is also the one of the part of design proposal that is the computer aided engineering which means that with the help of the technology and information systems, construction designing can be more attractive, comfortable and animated one so that real time execution of the process can be more in a potential, effective and efficient manner. CONCLUSION It is concluded that civil engineering technology is an important concept to learn in order to apply it in the real life organizations, therefore it is important to analyse the activities, techniques and equipment of earthworks, it is essential to examine the creation of complex foundations, drainage works and piling works using different methods, it is necessary to determine the underpass construction, culvert construction & provision for utilities methods, it is significant to know about the hazards & safety arrangements for working in confined spaces, excavations, working within temporary works on highways & working on structures, it is crucial to developing and presenting a risk assessments & site safety plan, it is required to perform the evaluation of quality, economic, geotechnical & environmental context of a given problem, it is needed to proposing a resolution to a given problem and it is imperative to developing a new 7
infrastructure project in context of civil engineering design. Hence, this report covers all such areas to better understand the conception of civil engineering technology. 8
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
References: Books and Journals Al-Zwainy, F.M. and Mezher, R.A., 2018. Diagnose the causes of cost deviation in highway construction projects by using root cause analysis techniques.Arabian Journal for Science and Engineering.43(4). pp.2001-2012. Alleman, D. and Tran, D., 2020. Challenges of implementing progressive design-build in highway construction projects.Journal of Legal Affairs and Dispute Resolution in Engineering and Construction.12(1). p.04519036. Antoniou, F. and Aretoulis, G.N., 2018. Comparative analysis of multi-criteria decision making methods in choosing contract type for highway construction in Greece.International journal of management and decision making.17(1). pp.1-28. Chini, A., Ptschelinzew, L., Minchin Jr, R.E. and Shah, D., 2018. Industry attitudes toward alternative contracting for highway construction in Florida.Journal of Management in Engineering.34(2). p.04017055. Ibrahim,A.H.andShaker,M.A.,2019.Sustainabilityindexforhighwayconstruction projects.Alexandria Engineering Journal.58(4). pp.1399-1411. Nnaji, C., Lee, H.W., Karakhan, A. and Gambatese, J., 2018. Developing a decision-making frameworktoselectsafetytechnologiesforhighwayconstruction.Journalof construction engineering and management.144(4). p.04018016. Noorzai, E., 2020. Performance Analysis of Alternative Contracting Methods for Highway Construction Projects: Case Study for Iran.Journal of Infrastructure Systems.26(2). p.04020003. Ruggeri, P., Fruzzetti, V.M.E. and Scarpelli, G., 2019, July. Lessons Learnt from the SS 106 Jonica Highway Construction Works. InNational Conference of the Researchers of Geotechnical Engineering(pp. 734-742). Springer, Cham. Sohu, S., Jhatial, A.A., Ullah, K. and Shahzaib, J., 2018. Determining the critical success factors for highway construction projects in Pakistan.Engineering, Technology & Applied Science Research.8(2). pp.2685-2688. Somboonpisan, J. and Limsawasd, C., 2021. Environmental Weight for Bid Evaluation to Promote Sustainability in Highway Construction Projects.Journal of Construction Engineering and Management.147(4). p.04021013. Thapanont, P., Santi, C. and Pruethipong, X., 2018. Causes of delay on highway construction projects in Thailand. InMATEC Web of Conferences(Vol. 192, p. 02014). EDP Sciences. Wang, S., Niu, F., Chen, J. and Dong, Y., 2020. Permafrost research in China related to express highway construction.Permafrost and Periglacial Processes.31(3). pp.406-416. 9