COIT 20248: Information Systems Analysis and Design Term 2, 2018 Assessment 1 - Systems Analysis Lecturer: Tutor: Prepared by: Student Name: Student Number:
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Table of Content 1. Introduction.......................................................................................................................................1 2. Approach to Systems Development..................................................................................................2 3. Systems Requirements......................................................................................................................3 4. Project Cost and Benefit Analysis......................................................................................................4 5. Project Schedule................................................................................................................................6 6. System Information Requirement Investigation Techniques.............................................................8 7. Reflections and Conclusions..............................................................................................................9 REFERENCES:.......................................................................................................................................10
1.Introduction The report that is being developed basically highlights of the case study for the organization of International Charity Foundation and there is a need to develop an information system for the organization, the discussion for which has been provided in this report (Fleming and Koppelmann 2016). I am the software consultant who has been asked to perform an analysis on the design of the system that the organization is looking to implement. The main objective of the project is the development of a Global Business Management System. The main aims of this report is to provide a detailed description of the analysis of the project and provide a design which is to be used for the development of the system for the organization. Page1
2. Approach to Systems Development For the development of the system the Waterfall model is to be adopted, since the project which being considered in this report is basically a linear project and all the metrics and the measurements are fixed hence the selection is of this model is very apt for the development of the project (Marchewka 2014). The major phases which are to be involved in the project development in this method are requirement gathering phase in which the major requirements and the deficiencies in the current system for the organization are identified. After the requirement gathering or the project analysis phase is over the project planning is considered where the project schedule is designed and the budget for the project is allocated. The project implementation phase involves the procedures of designing if the software intended for the project, the database and the integration of the backend procedures of the database. After the project has been implemented the testing phase is done where the software is subjected to various type of testing methods and the software is developed according feedbacks received from testing the system. After the risks involves in the project are mitigated through the testing procedure the maintenance phase for the project is covered and the schedule for the maintenance and resource allocation for the maintenance of the project is done. After the maintenance phase is done with the further development in the project takes place and the delivery of the project is done by uploading the project on the domain of the organization and submitting the documents related to the project. Page2
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
3. Systems Requirements The system requirements analysis of any type of project deals with an analysis of the functional requirements and the non-functional requirements of the project. The functional requirements of the project are provided below (Walker 2015): ï‚·The children should be able to enrol themselves into the ICF programs. ï‚·The system should also be able to provide the institutions and the organizations to donate money for the welfare of the organization. ï‚·The system should also be able to keep track of the stock levels in n each of the braches and the income level and expenses of all the branches of the organization. ï‚·In addition to this, the organization would also like to provide the login and registration features for their clients. The main non-functional requirements of the project are provided below: Data integrity:The system should be able to store the data of the organization efficiently and this would help the management of the data for the braches of the organization efficiently. Thus it is very important feature as the data storage options for any type of organization is a very important feature and the loss of data from any sector would hamper the sector effectively. Availability:The system is to made available for the client on daily basis 24x7 so that they can login to the system whenever they want to and also this would reduce the response time of the organization for the clients which would help them in increasing the customer satisfaction level for the organization. Page3
4. Project Cost and Benefit Analysis The project cost and benefit analysis is a very important factor that effects towards the economic feasibility of the project for the organization (Heagney 2016). It has been given that the monthly income is $9000. Hence, the annual savings for the project is $108000. Additionally, the maintenance cost of the project annually is $7,200.The cost benefit analysis of the project is provided below: Cost benefit analysis for Global Business System Year 0Year 1Year 2Year 3Year 4Year 5 Overall savings$0$1,08,000$1,08,00 0 $1,08,00 0 $1,08,00 0 $1,08,00 0 Development cost($2,50,000 )$0$0$0$0$0 Maintenance Cost$0($7,200)($7,200)($7,200)($7,200)($7,200) Net benefit/costs$0$0$0$0$0$0 Net cash flow($2,50,000 )$1,00,800$1,00,80 0 $1,00,80 0 $1,00,80 0 $1,00,80 0 Discount factors Discount rate10% Year Index012345 Discount factor10.910.830.750.680.62 Discounted flows Cost($2,50,000 )($6,545)($5,950)($5,409)($4,918)($4,471) Benefit$0$98,182$89,256$81,142$73,765$67,060 Net($2,50,000 )$91,636$83,306$75,733$68,848$62,589 Cumulative($2,50,000 ) ($1,58,364 )($75,058)$675$69,522$1,32,11 1 Net present value$1,32,111 Page4
ROI10% Payback Analysis YearsMonths 123 Payback Period in Years2.90 Table 1: Cost Benefit Analysis Source: (created by Author) Page5
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
5. Project Schedule The schedule of the project is provided below: Task NameDurationStartFinishPredecessors Global Information System40 daysMon 03-09-18Fri 26-10-18 Project Initiation3 daysMon 03-09-18Wed 05-09-18 Meeting with the clients2 daysMon 03-09-18Tue 04-09-18 Identifying the Project aims and objective1 dayWed 05-09-18Wed 05-09-182 Requirement Analysis5 daysThu 06-09-18Wed 12-09-18 Identifying Functional Requirements2 daysThu 06-09-18Fri 07-09-183 Identifying the Non-Functional Requirements1 dayMon 10-09-18Mon 10-09-185 Construction of the project schedule and work breakdown structure 2 daysTue 11-09-18Wed 12-09-186 Project Implementation19 daysThu 13-09-18Tue 09-10-18 System interface design6 daysThu 13-09-18Thu 20-09-187 Database Development5 daysFri 21-09-18Thu 27-09-189 Integration of the back end process with the database8 daysFri 28-09-18Tue 09-10-1810 Project Testing7 daysWed 10-10-18Thu 18-10-18 System testing2 daysWed 10-10-18Thu 11-10-1811 Analysis of the test results2 daysFri 12-10-18Mon 15-10-1813 System update3 daysTue 16-10-18Thu 18-10-1814 Project Deployment2 daysFri 19-10-18Mon 22-10-18 Page6
Installation of the project in the office2 daysFri 19-10-18Mon 22-10-1815 Project Maintenance4 daysTue 23-10-18Fri 26-10-18 Submitting project deliverables1 dayTue 23-10-18Tue 23-10-1817 Assigning personnel for project1 dayWed 24-10-18Wed 24-10-1819 Scheduling Project maintenance2 daysThu 25-10-18Fri 26-10-1820 TABLE 1: Project Schedule Source: (created by Author) Global Information System Project Initiation Meeting with the clients Identifying the Project aims and objective Requirement Analysis Identifying Functional Requirements Identifying the Non-Functional Requirements Construction of the project schedule and work breakdown structure Project Implementation System interface design Database Development Integration of the back end process with the database Project Testing System testing Analysis of the test results System update Project Deployment Installation of the project in the office Project Maintainance Submitting project deliverables Assigning personnel for project Scheduling Project maintainance FIGURE 1: Work breakdown Structure Source: (created by Author) IDTask Mode Task NameDurationStartFinishPredecessors 0Global Information System40 daysMon 9/3/18Fri 10/26/18 1Project Initiation3 daysMon 9/3/18Wed 9/5/18 2Meeting with the clients2 daysMon 9/3/18Tue 9/4/18 3Identifying the Project aims and objective 1 dayWed 9/5/18Wed 9/5/182 4Requirement Analysis5 daysThu 9/6/18Wed 9/12/18 5Identifying Functional Requirements 2 daysThu 9/6/18Fri 9/7/183 6Identifying the Non-Functional Requirements 1 dayMon 9/10/18Mon 9/10/185 7Construction of the project schedule and work breakdown structure 2 daysTue 9/11/18Wed 9/12/186 8Project Implementation19 daysThu 9/13/18Tue 10/9/18 9System interface design6 daysThu 9/13/18Thu 9/20/187 10Database Development5 daysFri 9/21/18Thu 9/27/189 11Integration of the back end process with the database 8 daysFri 9/28/18Tue 10/9/1810 12Project Testing7 daysWed 10/10/18Thu 10/18/18 13System testing2 daysWed 10/10/18Thu 10/11/1811 14Analysis of the test results2 daysFri 10/12/18Mon 10/15/1813 15System update3 daysTue 10/16/18Thu 10/18/1814 16Project Deployment2 daysFri 10/19/18Mon 10/22/18 17Installation of the project in the offi ce 2 daysFri 10/19/18Mon 10/22/1815 18Project Maintainance4 daysTue 10/23/18Fri 10/26/18 19Submitting project deliverables 1 dayTue 10/23/18Tue 10/23/1817 20Assigning personnel for project 1 dayWed 10/24/18Wed 10/24/1819 21Scheduling Project maintainance 2 daysThu 10/25/18Fri 10/26/1820 SMWFSTTSMWFSTTSMWFSTTSMWFSTTSM Aug 26, '18Sep 2, '18Sep 9, '18Sep 16, '18Sep 23, '18Sep 30, '18Oct 7, '18Oct 14, '18Oct 21, '18Oct 28, '18 FIGURE 2: Gantt Chart Source: (created by Author) Page7
6. System Information Requirement Investigation Techniques The system information requirement technique involves two parts one of which is stakeholder’s analysis and the others are interviews and questionaries methods which are to be used for the investigation of the project and effect towards the betterment of the project (Verzuh 2015). The stakeholders mainly involved in the project are project manager, database designer, project manager, system engineer, back end developer, customers, staffs and sponsors for the system which is to be developed. In addition to the stakeholders there are other methods which are to be followed for the further development of the project and hence, the procedures such as the interview sessions, questionaries and feedback procedures are to be adopted. Interviews:The sessions of the interviews are conducted by the project manager where he asks the stakeholders a certain amount of questions in a one on one sessions and gathers very useful information about the development of the project (Mir and Pinnington 2014). Sometimes the information provided by the stakeholders are very important for the development of the project and also goes to a great extent for defining of the particulars for the project. Questionnaire:The process of questioning the stakeholder for every aspect of the project. The process is generally conducted after the completion of the project and in this process a set of questions are handed over to the targeted stakeholders and project is reworked according to their insights. Feedbacks:In the feedback process a beta version of the project product is provided to the stakeholders and they provide an efficient feedback/suggestions to the developers for improvement of the project to a great extent. Page8
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
7. Reflections and Conclusions For the summarization of the project it can be considered that analysis of the project and the requirements of the company were very important for the development of a Global management system. The report has been used for the appropriate discussion of the analysis and the design of the project. I would like to acknowledge that the course has helped me a great deal in gathering knowledge about the project management techniques which would be further useful in my future project in practical life. Page9
REFERENCES: Fleming, Q.W. and Koppelman, J.M., 2016, December. Earned value project management. Project Management Institute. Marchewka, J.T., 2014.Information technology project management. John Wiley & Sons. Walker, A., 2015.Project management in construction. John Wiley & Sons. Heagney, J., 2016.Fundamentals of project management. Amacom. Verzuh, E., 2015.The fast forward MBA in project management. John Wiley & Sons. Mir, F.A. and Pinnington, A.H., 2014. Exploring the value of project management: linking project management performance and project success.International journal of project management,32(2), pp.202-217. Mir, F.A. and Pinnington, A.H., 2014. Exploring the value of project management: linking project management performance and project success.International journal of project management,32(2), pp.202-217. Page10