Components contain in construction document The traditional construction document consists of two main physical components which are: 1.Project manual 2.Drawings The following parts are contained in the project manual Bid advertisements or invitation: This document contains all information about the project at the biding period. And its normally appear at the foremost of project manual. It contains information such the name of the project, number and location of the project Instruction to Bidders: This is the term used to bidders, theyare defined in the Standard general condition of the construction contract Bid Forms: These include drawings, timelines, specifications, charts and price breakdown The General condition of the contract: This is the portion which set the responsibilities of each party, it also shows the relationship between the clients and the contractor Special conditions: This is conditions which are only applicable to a certain portion of the job. It is normally an extension of a contract Other information relating to bidders(such as soil report); This information enables the bidders to understand the general outlook of the project fully Technical specifications(Divisions2-16).This portion listed all the Technical data and requirement.information on this part should specify all materials andtechnique to be used construction drawings All contracts contain a particular set of drawing that applies to the project being carried out. The drawing might include the actual blueprint of the project, or it can be a simple graphic representation of the actual project and the character of work that will be done by the contractor. The following components are contained in construction drawings, especially for a building The general notes and abbreviations The site plans The utility plans The floor plans The sections of a building The parts of a wall The elevation of the exterior All the details of construction work The drawings models of structural engineering