Ask a question from expert

Ask now

Competency Demonstration Report (CDR) Assignment

9 Pages1618 Words176 Views
   

Added on  2020-05-28

Competency Demonstration Report (CDR) Assignment

   Added on 2020-05-28

BookmarkShareRelated Documents
COMPETENCYDEMONSTRATION REPORTCareer Episode 2AAVASH SHRESTHA
Competency Demonstration Report (CDR) Assignment_1
CE 2.1 Project InformationName of the project: Methods for the designing of reinforcement in ReinforcedUnpaved Roads. Location of the project: [PLEASE FILL]Project Duration: [PLEASE FILL]Organization: [PLEASE FILL]Role and Designation during the time: Team MemberCE 2.2 Project BackgroundCE 2.2.1 Characteristics of the projectApplication of geo-textile or polymer grid process reinforcement can be used in theprocess of improvement of the performance and the strength of the fill layers which has beenreinforced for the placing on the soft grounds. I had worked on the development of this projectdue to the concern of the mechanism for the designing of the unpaved roads. These roads hadbeen built on a base of soft clay that has been considered an important application of thereinforcement of the soil technique. The process has been able to be completed efficiently andeffectively. For the completion of the project I has proposed the use of a new analytical designmodel with the concern of the mechanism of the use of reinforced unpaved roads. I hadimplemented the use of membrane reinforcement mechanism with the new model. This hasresulted in the completion of the project in a positive manner. The membrane has been able tohelp the acceptance of the behaviour with the inclusion of surface deformities.
Competency Demonstration Report (CDR) Assignment_2
CE 2.2.2 Objectives developed for the projectFor the completion of the project I had set out the following list of objectives whichwould help in the delivery of the highest quality in the task:To enhance the soft ground placed reinforced fill layers’ performance.To work with a collaborative team for the projectTo keep the budget of the project as low as possibleTo design and use a new model which would be based on the use of membranereinforcement procedure. CE 2.2.3 My area of workFor this project I had worked on the designing of the methods to be used for thereinforcement of the unpaved roads with the help of the implementation of geo grids and geotextile. However it has been seem that Noiray and Giroud has been presented the research topicto be implemented. This project has been then redesigned for the completion of my researchbased study so that the output in enhanced from the use of the soft clay. I had then tried tocomplete the delivery of the project after the correct procedural analysis on the use of themembrane reinforcement mechanism. The project has been able to delivered with the completeefficient and effective work and thus it can be said that I have been able to successful achieve theobjective. The procedural mechanism for the project has been helpful on the dealing of theinteraction between the loads of the two wheels with the basis of the implicit assumptions thatthe use of the sub graded clay behaves in the rigid plastic manner.
Competency Demonstration Report (CDR) Assignment_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Sample Summary Statement for Professional Engineer
|10
|2110
|743

Competency Demonstration Report Assignment (CDR)
|8
|1592
|74

Studying the overall Effect of Terrazyme
|9
|1507
|28

Project Description: Using Waste Tyre rubber in Bituminous Concrete
|8
|1613
|89

Competency Demonstration Report: Assignment
|8
|1743
|208

The Process of Implementation of an Electromagnetic Braking System
|8
|1627
|123