COMPETENCYDEMONSTRATION REPORTCareer Episode 3SHRUTI S.BHAVTHANKAR
Competency Demonstration Report Humidity Control_1
CE 3.1 Project InformationName of the project: Geothermal Heating and CoolingLocation of the project: [PLEASE FILL]Project Duration: [PLEASE FILL]Organization: [PLEASE FILL]Role and Designation during the time: Team MemberCE 3.2 Project BackgroundCE 3.2.1 Characteristics of the projectThe basic theory behind the development of this project is to humidity control, heatingand controlling of a room with the help of earth’s temperature. This process can also be used toprovide the users with the ability to receive warm water without the use of any electricalequipment. Any kind of geothermal heating and cooling system is composed of three subsystemswithin the procedure. The three systems work together to complete the project. The three systemsare: a heat pump to remove the heat from the building to the fluid in the earth connector, an earthconnector to transfer the heat between the fluid and the earth and a subsystem which isresponsible for the heating or the cooling of the room. If the building is facing a high warm waterrequirement then there is an option of adding a de super heater to the water heater of thebuilding.
Competency Demonstration Report Humidity Control_2
CE 3.2.2 Objectives developed for the projectFor the project I had set out the following list of objectives to be followed for thecompletion of this project:To make the project as feasible as possible.To make it cheap for the implementation procedure. To make it efficient enough so that this project does not become a failure. To be able to use the heat of the earth for the cooling of residential areasCE 3.2.3 My area of workFor this project I was responsible for guiding my team throughout the project with thehelp of my production engineer skills and to make the project successful. I had helped my teammembers with the guide for the installation procedure of the heating and cooling system. I hadfirst setup a location house in an open location with a complete furnished room. I then proceededwith the process of installation of the geothermal system. For this project I had compiled thecomplete working procedure of the project into a complete documentation. The documentationalso included the testing phase results of the project and the literature study conducted for theunderstanding of the working procedure to use for the project.
Competency Demonstration Report Humidity Control_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Report on Competency Demonstrations
|8
|1614
|94

Designing, Analysis and Development of HVAC System Project
|9
|1751
|389

Designing and Fabrication of Portable Air Conditioner
|9
|1617
|367

Shell and Tube Exchanger Construction Assignment
|12
|1792
|118

Carbon Emission Awareness and Information (Doc)
|8
|1635
|173

The Design of a Double Pipe Heat Exchanger
|8
|1697
|181