Ask a question from expert

Ask now

Competency Element of Professional Engineering

10 Pages1705 Words231 Views
   

Added on  2020-05-28

Competency Element of Professional Engineering

   Added on 2020-05-28

BookmarkShareRelated Documents
Professional Engineering: Summary StatementCompetency ElementA brief summary of how youhave applied the elementParagraph number in thecareer episode(s) where theelement is addressedPE 1 KNOWLEDGE AND SKILL BASEPE1.1 Comprehensive,theory basedunderstanding of theunderpinning natural andphysical sciences and theengineering fundamentalsapplicable to theengineering discipline.1. The project was based oncommissioning and testing ofthe power and distributionusing the transformers.2. The project was based oncommissioning of GIS (GasInsulated Switchgear) systemand ensuring that there was 0deviation from the qualitystandards. 3. The project was based oncommissioning refinery off gascracking for increasing theCareer Episode 1: CE 1.2.3,CE 1.3.1 and CE 1.3.2Career Episode 2: CE 2.3.1and CE 2.3.3Career Episode 3: CE 3.2.1,CE 3.3.1 and CE 3.3.2
Competency Element of Professional Engineering_1
productivity and capacity ofthe petroleum products.PE1.2 Conceptualunderstanding of themathematics, numericalanalysis, statistics, andcomputer andinformation scienceswhich underpin theengineering discipline.1. I splitted the work into twophases the first phase wasconcerned with the testing andmodification of the delayscaused by the microprocessorand the second phase wascommissioning the interfacesystem. 2. I calibrated the bus voltageand the current meters aftercommissioning of the 220 VUPS system and simulated theUPS model by checkingredundancy for ensuring thatno interruption is caused. 3. The statutory requirementsare verified for its statutory andcompliance with therequirement of the project.Flameproof design wasselected for the installation ofCareer Episode 1: CE 1.3.1Career Episode 2: CE 2.3.2,CE 2.3.3 and CE 2.3.4Career Episode 3: CE 3.3.1
Competency Element of Professional Engineering_2
the heaters in ten hazardouszones voltage drop calculationwas applied for the properworking of the equipment.PE1.3 In-depthunderstanding ofspecialist bodies ofknowledge within theengineering discipline1. I have chosen skillworkforce for proceeding withthe complex projects aftertesting the technical knowledgeand experience. Status updatemeetings were organized byme for the discussion of thework related issues and adhereto the quality standards. 2. I had conducted VLF testingbefore joining and terminationof the 33 Kv cables. Specialinitiative was taken by me forthe safety awareness andidentification of the potentialelectrical hazards in the projectwork.3. I supervised the task andeliminated the issues faced byCareer Episode 1: CE 1.3.1Career Episode 2: CE 2.3.1,CE 2.3.4, CE 2.2.5 and CE2.4.2
Competency Element of Professional Engineering_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Professional Engineer Assignment PDF
|9
|1980
|122

Summary Statement for Professional Engineer Competency Units and Elements
|10
|1964
|369

Conceptual Understanding of the Mathematics
|10
|1705
|194

Aeronautical Engineering - Professional Engineering Summary Statement
|5
|913
|203

Professional Engineers Assignment | Summary Statement
|12
|1982
|52

Professional Engineer: |Competency Element|Career Episodiod
|10
|2194
|226