Professional Engineering: Summary StatementCompetency ElementA brief summary of how youhave applied the elementParagraph number in thecareer episode(s) where theelement is addressedPE 1 KNOWLEDGE AND SKILL BASEPE1.1 Comprehensive,theory basedunderstanding of theunderpinning natural andphysical sciences and theengineering fundamentalsapplicable to theengineering discipline.1. The project was based oncommissioning and testing ofthe power and distributionusing the transformers.2. The project was based oncommissioning of GIS (GasInsulated Switchgear) systemand ensuring that there was 0deviation from the qualitystandards. 3. The project was based oncommissioning refinery off gascracking for increasing theCareer Episode 1: CE 1.2.3,CE 1.3.1 and CE 1.3.2Career Episode 2: CE 2.3.1and CE 2.3.3Career Episode 3: CE 3.2.1,CE 3.3.1 and CE 3.3.2
productivity and capacity ofthe petroleum products.PE1.2 Conceptualunderstanding of themathematics, numericalanalysis, statistics, andcomputer andinformation scienceswhich underpin theengineering discipline.1. I splitted the work into twophases the first phase wasconcerned with the testing andmodification of the delayscaused by the microprocessorand the second phase wascommissioning the interfacesystem. 2. I calibrated the bus voltageand the current meters aftercommissioning of the 220 VUPS system and simulated theUPS model by checkingredundancy for ensuring thatno interruption is caused. 3. The statutory requirementsare verified for its statutory andcompliance with therequirement of the project.Flameproof design wasselected for the installation ofCareer Episode 1: CE 1.3.1Career Episode 2: CE 2.3.2,CE 2.3.3 and CE 2.3.4Career Episode 3: CE 3.3.1
the heaters in ten hazardouszones voltage drop calculationwas applied for the properworking of the equipment.PE1.3 In-depthunderstanding ofspecialist bodies ofknowledge within theengineering discipline1. I have chosen skillworkforce for proceeding withthe complex projects aftertesting the technical knowledgeand experience. Status updatemeetings were organized byme for the discussion of thework related issues and adhereto the quality standards. 2. I had conducted VLF testingbefore joining and terminationof the 33 Kv cables. Specialinitiative was taken by me forthe safety awareness andidentification of the potentialelectrical hazards in the projectwork.3. I supervised the task andeliminated the issues faced byCareer Episode 1: CE 1.3.1Career Episode 2: CE 2.3.1,CE 2.3.4, CE 2.2.5 and CE2.4.2
End of preview
Want to access all the pages? Upload your documents or become a member.
Related Documents
Professional Engineer Assignment PDFlg...
|9
|1980
|122
Summary Statement for Professional Engineer Competency Units and Elementslg...
|10
|1964
|369
Conceptual Understanding of the Mathematicslg...
|10
|1705
|194
Aeronautical Engineering - Professional Engineering Summary Statementlg...
|5
|913
|203
Professional Engineers Assignment | Summary Statementlg...
|12
|1982
|52
Professional Engineer: |Competency Element|Career Episodiodlg...