AI Summary
The provided content includes research articles on wastewater treatment using various methods such as microbial fuel cells, constructed wetlands, and anaerobic reactors. The studies focus on topics like performance enhancement through flow modes and electrode combinations, mitigation of emerging contaminants, and synergistic effects in up-flow constructed wetlands and microbial fuel cells. Additionally, the appendices provide design specifications for aeration tanks, secondary clarifiers, and chlorination tanks, as well as a screen chamber checking area.

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Document Page
Running Head: Conceptual Design of a Wastewater Treatment Plant
CONCEPTUAL DESIGN OF A WASTEWATER TREATMENT
PLANT

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
2
Conceptual Design of a Wastewater Treatment Plant
Table of Contents
Summary..........................................................................................................................................3
Objectives of the project..............................................................................................................3
Background Information..............................................................................................................3
Design Tasks................................................................................................................................3
Design Data.....................................................................................................................................4
Design Flow.................................................................................................................................4
Amount of the Inflowing Water...............................................................................................4
Raw Wastewater Quality..........................................................................................................5
Receiving Water Body’s water quality requirements and effluents limits...............................5
Rate of Pollutant Removal and Effluent Discharge Scheme....................................................6
Design of State-of-art......................................................................................................................6
Sewage Treatment in a Sludge Digestion Tank...........................................................................9
Design and Sizes of Facility Components.....................................................................................10
Storage Pool Design of Preliminary Treatment.........................................................................10
Screen chamber design for preliminary treatment.....................................................................10
Grit Chamber’s Design for Preliminary Treatment...................................................................11
Sedimentation Tank Design for Primary Treatment..................................................................11
Activated Sludge System for Secondary Treatment..................................................................13
Aeration Tank Design Specifications........................................................................................13
Secondary Clarifier Design........................................................................................................13
Secondary Design Summary......................................................................................................14
Tertiary Stage Chlorination Design Tank Specification............................................................14
Main Equipment............................................................................................................................14
Document Page
3
Conceptual Design of a Wastewater Treatment Plant
Necessary Equipments for Preliminary Treatment....................................................................14
Equipment for Primary Treatment.............................................................................................14
Equipment for Secondary Treatment.........................................................................................14
Equipment for Tertiary Treatment.............................................................................................14
Estimation of Capital Cost and Operational Cost..........................................................................14
Layout of Treatment Plant.............................................................................................................15
Reference List................................................................................................................................17
Appendices....................................................................................................................................21
Document Page
4
Conceptual Design of a Wastewater Treatment Plant
Summary
The prime aim of this report is to present a conceptual design of a waste water treatment plant
that is to be used for the treatment of wasted water in a small town of Bangkok city and make it
less harmful for further processing or dumping processes. The design project has included the
different technical details of the treatment plant construction like hydraulic designs, mass
balance designs, treatment unit designs and every other single unit and individual design.
Objectives of the project
a. To design and develop as well as implement necessary design measures to fulfil the
requirements of waste water treatment along with the optimization of the treatment
operations.
b. To implement both methods of feasible hydraulic analysis or calculations and
environmental sciences fundamentals for the formulation of efficient solutions to develop
the works related to water treatment.
Background Information
There is a necessity to construct a Wastewater Treatment Plant that can be utilized to serve
around 20,000 people in an organised manner in a small town of Bangkok. The site that has been
chosen for the construction of this water treatment plant is a flat land and its level is
approximately 3 meters above compared to the nearest river’s water level that is located about
500 meters away from the site. However, compared to the sea level of which the nearest point is
located approximately 5 km away is approximately 5 meters high. The wastewater collection
system need not be considered by the designer but it needs to be assumed that the level of
incoming water is about 1.5 meters lower than the surface of ground.
Design Tasks
(1) Determination of data related to the design that includes the factors like incoming flow,
quality and quantity of incoming water along with the effluent limits.
(2) Design of Process that includes the design of every individual unit to be used in treatment
like various biological, chemical and physical processes.

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
5
Conceptual Design of a Wastewater Treatment Plant
(3) Mass balance to be maintained inside the Treatment Plant that consists of the balance
related to Flow rate, SS and BOD and certain other terms.
(4) Technical details related to the functioning and measurement descriptions of pipes,
pumps, gateways, storages, gateways, feeding chemicals and oxygen transferring devices.
(5) Design related to the effluent discharge of incoming as well as outgoing water to and
from the water treatment tank.
(6) Cost calculations related to every aspect starting from the construction of wastewater
treatment plant to its proper functioning and maintenance.
Design Data
The location of the proposed Wastewater Treatment plant is at a small town located at the
outskirts of Bangkok. The rate of increase in the population in this area is 1.3% every year. The
estimated service life of the water treatment plant has been assumed to be about 20 years. As per
a survey conducted by the Public Works Department of this area, it was found that a person in
this area uses 420 litres of water every day on an average. It is evident that the population of this
area is likely to increase by the end of the service life of this location and the population might
stand at near about 26,000.
Design Flow
The projections for designed flow have been made keeping in mind the annual rate of population
increase at 1.3% from the year 2017 to the year 2037.
Amount of the Inflowing Water
The approximate value of the amount of water that will be flowing to the wastewater treatment
plant is estimated to be approximately 10.33x103 m3 per day. The calculation has been made by
considering the worst-case scenario by taking the conversion factor as 0.95 and the following
equation has been considered for this purpose.
Document Page
6
Conceptual Design of a Wastewater Treatment Plant
On the basis of the amount of the water that will inflow in the treatment plant, there will be a
requirement of preliminary treatment for wastewater of the volume 10.33x103 m3/day. However,
low cost methods can be considered of the amount of water flow is less than the estimated value
mentioned above as there will be no need to use the preliminary treatment for cleaning purpose
in Bangkok.
Raw Wastewater Quality
For the determining purpose of water concentration and quality, US standards for Concentration
levels have been used by the engineers that are involved in development of the wastewater
treatment plant (Saggaï et al. 2017). This has been done considering the fact that the people of
Bangkok are likely to produce some very strong sanitary that might lead to the need of ideal
operation for the long run. Following is the concentration chart.
Parameter Concentration in milligrams per litre
Weak Sanitary Medium
Sanitary
Strong Sanitary Septage
Phosphorous (P) 3 7 16 240
Grease and Oil 18
Nitrogen (N) 24 46 80 820
Biochemical
Oxygen Demand
or BOD5
100 230 380 5,900
Solid Suspended
or SS
150 230 400 16,000
Total Solid of TS 277 531 876 24,860
Table 1: US Standards for Concentration levels in wastewater
(Source: Chouari et al. 2017)
Receiving Water Body’s water quality requirements and effluents limits
It is very important to treat the parameter requirements of the concentration till the time it
reaches within the considerable ranges of the desired values in accordance to the guidelines of
effluent standards that have been recommended for the direct discharge purpose in the open
Document Page
7
Conceptual Design of a Wastewater Treatment Plant
environment (Matamoros, Rodríguez & Bayona, 2017). Details have been shown in the table
below.
Parameter Towards Inland Watercourse To Estuary To Sea
Potable Water
Abstraction
present above
Potable Water
Abstraction that
remains
unaffected
Phosphorous (P) 35 35 35 35
Nitrogen (N) 20 55 55 120
Biochemical
Oxygen Demand
or BOD5
25 30 45 -
Solid Suspended
or SS
35 35 60 Nil identifiable
sewage solid
Total Solid of TS - 40 50 -
Table 2: Effluent Limits Standards of Receiving Water
(Source: Fountoulakis et al. 2017)
Rate of Pollutant Removal and Effluent Discharge Scheme
The necessary removal rate of the polluted water is dependent on the effluent discharge scheme
and hence this limit is considered very critical in raw wastewater pollutant concentration
(Dąbrowski et al. 2017). The rate of pollutant concentrations keep changing whereas the removal
rate of these pollutants usually remains the same. In this particular case, the necessary removal
rate as per the design has to be considered as maximum at 90% from the river water.
Design of State-of-art
The infiltration of contaminated water basically happens in the wastewater treatment plant’s
inflow of water from both the storm water drainage system as well as the sewerage units
(Bohórquez, Paredes & Arias, 2017). The sewage collection system collects the sewage and then
forwards it towards the main plant for further processing and treatment. The primary function of
this particular wastewater treatment plant is to make the polluted water free from harmful and

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
8
Conceptual Design of a Wastewater Treatment Plant
unnecessary biological as well as chemical waste present in the water by purifying it in a safe
manner. There are four major components in the wastewater treatment plant based basic
treatment processing because of the heavy water inflow at 1000 m3 per day. As a result of high
concentration, there is a need to implement the primary, secondary and the tertiary methods and
stages of treatment in an organised manner (Berberidou et al. 2017). Following are the four
stages of wastewater treatment plant.
Storage Pool – This is used for storing the polluted water before its treatment.
Screen Chamber – This is used for compacting of the screenings and for their
transportation to the landfills for disposal purposes (Oon et al. 2017).
Grit Chamber – This particular chamber is used for removal of grit, sands and stones
along with keeping the majority of the suspended organic matters. The grits are also
moved towards the disposal along with screening.
Primary Purification System – It is a tank that has been designed to remove bigger
particles by letting them to settle down to the bottom of the chamber in the form of
sludge and simultaneously raise the floatable materials towards the surface of the pool
(He et al. 2016).
This process is further followed by the Secondary treatment that delivers the processes where the
suspended solid or SS and certain other organic materials that somehow manage to escape the
primary stage of treatment are finally removed. This stage usually removes approximately 85%
to 90% of SS and BOD concentration from the water. Aerobic and Anaerobic Treatment are the
two main systems that are used at the secondary stage (Pascual et al. 2017).
In the Aerobic Treatment, oxygen is utilized by the bacteria in order to degrade the organic
matter like Biochemical Oxygen Demand. On the other hand, in an anaerobic treatment, the
anaerobic bacteria can use oxygen for the same purpose from the process of oxidation that
happens inside the treatment system or from organic elements that are present inside the
wastewater (Vymazal & Březinová, 2016).
Following are the units that are used in Secondary treatment of wastewater that are quite
different from primary treatment system.
Document Page
9
Conceptual Design of a Wastewater Treatment Plant
Aeration Tank – This tank is used for the treatment of odours of wastewater by mixing
of air or oxygen into the mixture or foul gases. Both the aerobic as well as anaerobic
treatment methods can be used either separately or in a combined manner where the
metabolism is done by dissolving and converting the biological matters into solid mass
(Calheiros et al. 2017).
Secondary Clarifier – This is a basin in a circular shape that is emerged from the sludge
process that was activated at the bottom of the heavier biomass that is usually the bacteria
(Gizińska-Górna et al. 2016).
Figure: 1 Aeration Tank and Secondary Clarifier connections in Wastewater
Treatment Plant
(Source: Gizińska-Górna et al. 2016)
The secondary treatment is followed by the last stage known as the tertiary stage of water
treatment that is usually done by the process of chlorination or exposure to Ultraviolet radiations.
This is done so that the unnecessary or harmful nutrients such as phosphorous, nitrogen, viruses,
bacteria and certain other inorganic compounds can be disinfected (Kurzbaum, Kirzhner &
Armon, 2016). Following are the two stages.
Document Page
10
Conceptual Design of a Wastewater Treatment Plant
UV Radiation – The water that comes out of the secondary treatment stage is then
exposed to a high intensity radiation that has a wavelength of 264 nm. The rate of design
flow is usually divided into open channels that comprise of multiple ultraviolet lamps.
The usage of Ultraviolet technique is very effective as additive chemicals are completely
removed from the water and it tastes more natural. However, the UV lamps installations
can put an extra burden on the maintenance cost (Wu et al. 2016).
Disinfection Chlorination Tank – This tank is generally used for systems that are
present to purify huge quantity of wastewater. This is because of the fact that the
chlorination process is very cost effective as well as efficient as it is highly oxidising in
nature and can form chlorination compounds and solutions very easily. However, it not
treated and disposed properly, the chlorine residue can be potentially harmful to the
nature (Oon et al. 2017).
Sewage Treatment in a Sludge Digestion Tank
The primary aim of a sewage treatment process is to clear the effluent and good sludge. The
liquid form effluent sludge is disposed off in the water sources directly and might involve the
following necessities.
1. Reduction in the volume of sludge by removing the amount of water present in it through
sludge dewatering process.
2. The organic matter present in the sludge needs to be stabilized.
3. It is very important to destroy the various types of pathogenic organisms.
4. Collection of by-products needs to be done for selling purposes.
5. Disposable should be done in a very aesthetical and safe manner from environment point
of view.

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
11
Conceptual Design of a Wastewater Treatment Plant
Figure 2: Cycle of Sewage Treatment in a Sludge Digestion Tank
(Source: Created by the Project Head)
Design and Sizes of Facility Components
Storage Pool Design of Preliminary Treatment
If Storage Pool is considered to be Qmax = 2Q(bar) and Qmax lasts for 6 hours maximum
Qmax = 2Q(bar)
= 2 (10.33x103)
= 20,660 m3 per day
Hence, Qmax at 6 hours = 5165 m3
Screen chamber design for preliminary treatment
Flow rate (minimum) : 0.047 m3 per second
Document Page
12
Conceptual Design of a Wastewater Treatment Plant
Flow rate (average)
Flow rate (maximum)
: 0.l125 m3 per second
: 0.243 m3 per second
Outfall sewer’s peak velocity : 0.62 m per second
Number of Bars
Shapes and size of the bars
Clear opening in between the bars (c/c)
: 37
: 25mm x 5 mm sized rectangular shaped bars
at 30 mm c/c
: 0.91 m
Angle of inclination for bars : 30°
Screen Chamber’s dimension : 3.00 m x 1.00 m x 1.10 m
Average velocity of flow through chamber : 0.743 m/second
Head Loss : 19.1 cm for maximum flow, and
: 0.759 for minimum flow
Table 3: Screen chamber design specifications
(Source: Cavallin et al. 2016)
Grit Chamber’s Design for Preliminary Treatment
Flow Rate : (similar as mentioned in screen chamber)
Temperature : 15°C
Velocity of Horizontal Flow : 17.05 m/s
Grit’s specific gravity : 2.54
Removal of size grit : More than 0.2 mm
Detention time : 60 seconds
Settling velocity for 0.2 mm grit size : 2.1 cm
Grit Chamber’s dimensions : 15.6 m x 1.3 m x 0.8 m
Table 4: Grit chamber design specifications
(Source: Wang et al. 2016)
Sedimentation Tank Design for Primary Treatment
In the primary treatment stage of wastewater treatment plant, following are the three types of
sedimentation that are done:
Plain Sedimentation
Document Page
13
Conceptual Design of a Wastewater Treatment Plant
Chemical Precipitation
Sedimentation along with coagulation
Following are the necessary criteria for designing a sedimentation tank:
1. Adequate retention time needs to be given to allow the settling down of particles
2. The velocity of horizontal flow should be less than 30 cm per minute
3. The effective depth must be between 2.5 meters and 5 meters
4. Bottom slope towards inlet for the circular tank must be between 4% and 10%
5. Effluent wear load has to be less than 600 m3/m/day
6. The rate of overflow for initially the primary setting and later the secondary treatment
Peak between 80 and 125 m3/m2/d
Average between 35 and 50 m3/m2/d
Following are the details related to the same.
Sedimentation Tank Type : Circular
Tank Diameter : 15.4 m
Number of Tanks : 2
Tank Depth : 5 m
Volume of one tank : 970.2 m3
Temperature : 30°C
Rate of Overflow : 40 m3/m2/d
Particle size for removed particle : greater than 0.16 mm
Design for average flow rate : 7781 m3/d per tank
Grit’s specific gravity : 2.67
0.18 mm sized particle’s settling velocity : 0.0026 m/s
Table 5: primary purifier design summary
(Source: Pascual et al. 2017)
In the above mentioned design, all the solid particles with diameter bigger than 0.15mm that are
suspended in the wastewater settle down in the form of sludge. A mechanical scrapper collects
these sludge particles and pumps to sludge digestion via using hopper. The rotating skimmer

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
14
Conceptual Design of a Wastewater Treatment Plant
skims off the floating materials in the water surface. The oils and gases that are floating are
pushed in trap that is designed with fence enclosure (Djukic et al. 2016). Following is the
removal rate of BOD, SS and P at the primary stage.
Parameter Influent
Concentration
(mg/L)
Rate of removal (%) Removed
Concentration
(mg/L)
SS 347 59% 208 (d>0.16mm)
P 14 21% 3
BOD 398 32% 122
Table 6: Removal rate of BOD, SS and P at primary stage
(Source: Djukic et al. 2016)
The effluents that are left finally after the primary level treatment are sent in a circular
sedimentation tank with cross section area as follows.
Figure 3: Cross Section of Sediment Tank
(Source: Hicks et al. 2017)
Activated Sludge System for Secondary Treatment
Following are the main design criteria that are to be considered for the secondary stage.
Tank Length: 30 meters to 100 meters.
Document Page
15
Conceptual Design of a Wastewater Treatment Plant
Tank Depth: 3 meters to 4.5 meters.
Tank Width: 5 meters to 10 meters.
Velocity of Horizontal Flow: 1.5 meters per minute.
Aeration Tank Design Specifications
Refer to Appendix 1
Secondary Clarifier Design
Some of the specific design criteria for clarifier design are as follows.
1. Detention Time: 1.5 hours to 2.0 hours.
2. Tank Depth: 3.5 meters to 4.5 meters for settling at secondary stage after sludge process
activation.
3. Average Overflow Rate: 15 m3/m2/d to 35 m3/m2/d
4. Peak Flow Rate: 40 m3/m2/d to 50 m3/m2/d.
Secondary Design Summary
Refer to Appendix 2
Tertiary Stage Chlorination Design Tank Specification
Refer to Appendix 3
Main Equipment
Following is the list of main equipments that are necessary for the successful installation of the
wastewater treatment plant.
Necessary Equipments for Preliminary Treatment
A Storage Pool with the capacity of 4000 m3
1 Grit Chamber (Size: 15.6m x 0.9m x 1.4m)
1 Screen Chamber (Size: 1.10m x 3.00m x 1.0m)
Equipment for Primary Treatment
2 Circular sedimentation tanks with capacity of 1000 m3 along with necessary sets of
rotating skimmers and mechanical scrapers.
Document Page
16
Conceptual Design of a Wastewater Treatment Plant
Equipment for Secondary Treatment
2 units of Secondary Clarifier with volume capacity of 3500 m3.
2 Aeration Tanks (Size: 4.8m x 5m x 10m)
Equipment for Tertiary Treatment
A 4 plug flow reactors chlorination tank with a volume capacity of 2648 m3.
Estimation of Capital Cost and Operational Cost
The estimated cost of installing the plant from the initial stage to the final stage will be near
around 1,27,200 Thai Baht. Following are the details for the total cost that will be spent along
with the minor details.
Task Cost
Planning and Development 1,000 Thai Baht
Land Testing 25,000 Thai Baht
Material Procurement 38,000 Thai Baht
Machine Hiring for Construction 11,000 Thai Baht
Labour Cost 15,000 Thai Baht
Expert Survey and Government Approval Tax 12,00 Thai Baht
Safety Expenses 10,000 Thai Baht
Transportation Charges 14,000 Thai Baht
Maintenance 12,000 Thai Baht
Total 1,27,200 Thai Baht
Table 7: Cost Estimation Chart of the project
(Source: Created by the Project Head)
Layout of Treatment Plant
The following diagram shows that layout of the complete Wastewater Treatment Plant that is to
be installed successfully on the planned plot.

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
17
Conceptual Design of a Wastewater Treatment Plant
Figure 4: Drawing Layout of Treatment Plant
(Source: Created by the Project Head)
In this layout, the positioning of clarifiers, Aeration Tanks, Sedimentation Tanks and every other
necessary component has been shown clearly. Moreover, different stages the water will have to
pass through during its purification stages have been depicted in arrow formats.
Document Page
18
Conceptual Design of a Wastewater Treatment Plant
Reference List
Berberidou, C., Kitsiou, V., Lambropoulou, D. A., Antoniadis, Α., Ntonou, E., Zalidis, G. C., &
Poulios, I. (2017). Evaluation of an alternative method for wastewater treatment
containing pesticides using solar photocatalytic oxidation and constructed wetlands.
Journal of environmental management, 195, 133-139.
Bohórquez, E., Paredes, D., & Arias, C. A. (2017). Vertical flow-constructed wetlands for
domestic wastewater treatment under tropical conditions: effect of different design and
operational parameters. Environmental technology, 38(2), 199-208.
Calheiros, C. S. C., Pereira, S. I. A., Brix, H., Rangel, A. O. S. S., & Castro, P. M. L. (2017).
Assessment of culturable bacterial endophytic communities colonizing Canna flaccida
inhabiting a wastewater treatment constructed wetland. Ecological Engineering, 98, 418-
426.
Cavallin, J. E., Jensen, K. M., Kahl, M. D., Villeneuve, D. L., Lee, K. E., Schroeder, A. L., ... &
Blackwell, B. R. (2016). Pathwaybased approaches for assessment of realtime exposure
to an estrogenic wastewater treatment plant effluent on fathead minnow reproduction.
Environmental toxicology and chemistry, 35(3), 702-716.
Chouari, R., Leonard, M., Bouali, M., Guermazi, S., Rahli, N., Zrafi, I., ... & Sghir, A. (2017).
Eukaryotic molecular diversity at different steps of the wastewater treatment plant
process reveals more phylogenetic novel lineages. World Journal of Microbiology and
Biotechnology, 33(3), 44.
Dąbrowski, W., Karolinczak, B., Gajewska, M., & Wojciechowska, E. (2017). Application of
subsurface vertical flow constructed wetlands to reject water treatment in dairy
wastewater treatment plant. Environmental technology, 38(2), 175-182.
Djukic, M., Jovanoski, I., Ivanovic, O. M., Lazic, M., & Bodroza, D. (2016). Cost-benefit
analysis of an infrastructure project and a cost-reflective tariff: A case study for
investment in wastewater treatment plant in Serbia. Renewable and Sustainable Energy
Reviews, 59, 1419-1425.
Document Page
19
Conceptual Design of a Wastewater Treatment Plant
Fountoulakis, M. S., Sabathianakis, G., Kritsotakis, I., Kabourakis, E. M., & Manios, T. (2017).
Halophytes as vertical-flow constructed wetland vegetation for domestic wastewater
treatment. Science of The Total Environment, 583, 432-439.
Gizińska-Górna, M., Czekała, W., Jóźwiakowski, K., Lewicki, A., Dach, J., Marzec, M., ... &
Listosz, A. (2016). The possibility of using plants from hybrid constructed wetland
wastewater treatment plant for energy purposes. Ecological Engineering, 95, 534-541.
He, W., Wallack, M. J., Kim, K. Y., Zhang, X., Yang, W., Zhu, X., ... & Logan, B. E. (2016).
The effect of flow modes and electrode combinations on the performance of a multiple
module microbial fuel cell installed at wastewater treatment plant. Water research, 105,
351-360.
Hicks, K. A., Loomer, H. A., Fuzzen, M. L., Kleywegt, S., Tetreault, G. R., McMaster, M. E., &
Servos, M. R. (2017). δ 15 N tracks changes in the assimilation of sewage-derived
nutrients into a riverine food web before and after major process alterations at two
municipal wastewater treatment plants. Ecological Indicators, 72, 747-758.

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
20
Conceptual Design of a Wastewater Treatment Plant
Kurzbaum, E., Kirzhner, F., & Armon, R. (2016). Performance comparison of plant root biofilm,
gravel attached biofilm and planktonic microbial populations, in phenol removal within a
constructed wetland wastewater treatment system. Water SA, 42(1), 166-170.
Matamoros, V., Rodríguez, Y., & Bayona, J. M. (2017). Mitigation of emerging contaminants by
full-scale horizontal flow constructed wetlands fed with secondary treated wastewater.
Ecological Engineering, 99, 222-227.
Oon, Y. L., Ong, S. A., Ho, L. N., Wong, Y. S., Dahalan, F. A., Oon, Y. S., ... & Thung, W. E.
(2016). Synergistic effect of up-flow constructed wetland and microbial fuel cell for
simultaneous wastewater treatment and energy recovery. Bioresource technology, 203,
190-197.
Oon, Y. L., Ong, S. A., Ho, L. N., Wong, Y. S., Dahalan, F. A., Oon, Y. S., ... & Nordin, N.
(2017). Role of macrophyte and effect of supplementary aeration in up-flow constructed
wetland-microbial fuel cell for simultaneous wastewater treatment and energy recovery.
Bioresource technology, 224, 265-275.
Pascual, A., de la Varga, D., Arias, C. A., Van Oirschot, D., Kilian, R., Álvarez, J. A., & Soto,
M. (2017). Hydrolytic anaerobic reactor and aerated constructed wetland systems for
municipal wastewater treatment–HIGHWET project. Environmental technology, 38(2),
209-219.
Saggaï, M. M., Ainouche, A., Nelson, M., Cattin, F., & El Amrani, A. (2017). Long-term
investigation of constructed wetland wastewater treatment and reuse: Selection of
adapted plant species for metaremediation. Journal of Environmental Management, 201,
120-128.
Vymazal, J., & Březinová, T. (2016). Accumulation of heavy metals in aboveground biomass of
Phragmites australis in horizontal flow constructed wetlands for wastewater treatment: A
review. Chemical Engineering Journal, 290, 232-242.
Wang, W., Ding, Y., Wang, Y., Song, X., Ambrose, R. F., Ullman, J. L., ... & Gong, J. (2016).
Treatment of rich ammonia nitrogen wastewater with polyvinyl alcohol immobilized
nitrifier biofortified constructed wetlands. Ecological Engineering, 94, 7-11.
Document Page
21
Conceptual Design of a Wastewater Treatment Plant
Wu, H., Lin, L., Zhang, J., Guo, W., Liang, S., & Liu, H. (2016). Purification ability and carbon
dioxide flux from surface flow constructed wetlands treating sewage treatment plant
effluent. Bioresource technology, 219, 768-772.
Document Page
22
Conceptual Design of a Wastewater Treatment Plant
Appendices
Appendix 1: Aeration Tank Design Specifications
Appendix 2: Secondary Clarifier design Specifications
Appendix 3: Chlorination Design Tank Specification

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
23
Conceptual Design of a Wastewater Treatment Plant
Screen Chamber Checking area
Minimum Area = 0.48 m2
Depth of Flow during peak flow, D = 2h = 2 * (0.16) = 0.32
Bars inclined length = 2D = 2 * (0.32) = 0.64
Screen Opening submerged area = 0.64 m x 1.0 m = 0.64 m2
Since, the screen opening submerged area is greater than minimum area that is 0.64>0.48.
Hence, the system is OK.
1 out of 23
[object Object]

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]