Construction Information Production
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Contents Introduction:....................................................................................................................................3 LO1 Evaluate different types of construction information in the context of diverse project types.4 (a)Explain the use of construction information in the context of the given project....................4 (b) Describe the different types of construction information and their uses. What type of construction information will you use for the current scenario and justify their use?................5 (c) Compare different types of construction information to identify their suitability in specific contexts........................................................................................................................................6 LO2 Develop construction drawings, details, schedules and specifications in support of a given construction project.........................................................................................................................6 (a)Prepare a set of general arrangement drawings, selected details and door/window schedules......................................................................................................................................7 (b)Produce an outline bill of quantities.......................................................................................7 (c)Compose a schedule of works...............................................................................................10 LO3 Interpret different types of construction information in order to explain a construction project............................................................................................................................................11 LO4Assesswaysinwhichconstructionprofessionalscollaborateintheproductionof construction information................................................................................................................11 (a)Assess the types of information produced by different participants in a construction project. Using the current project as a case study...................................................................................11 (b)Examine the relationship between different bodies of information and how they work in conjunction................................................................................................................................11 (c)Compare the roles of CAD and BIM in the collaborative production of construction information................................................................................................................................12 Conclusion:....................................................................................................................................13 References......................................................................................................................................14
Introduction: Construction information is one of the most important and essential document in the construction work which is clearly stating the objective, scope of the project, cost involved in the project along with safety issues, health and hazard issues involved in the project and it is required by the client. In this project, the initial conceptual design is made for the office consisting of high specification office rooms and conference rooms. This office is located in an industrial park near the expressway linking international airport and major city in the U.K. Different types of construction information are explained and their uses in the construction process. The bill of quantity and schedule of work is made for the same project. The role computer aided design and BIM in the construction information are also discussed. The CAD designs are made for the building floor in AUTOCAD software and specific information are mentioned. LO1 Evaluate different types of construction information in the context of diverse project types. (a)Explain the use of construction information in the context of the given project. Construction information is set of information which client expects and is generated in the possessionoftheclientandcontainstheappropriateinformationanddetailsaboutthe constructionproject.Themajordetailscontainedintheconstructioninformationorpre construction information is the information about the construction, management of the project, planning of the project, safety hazards and health hazards. Construction hazards and design hazard is also included in the construction information along with the precautions and the measures to avoid them. Construction information plays a vital role in the process of construction and it has wide range of uses in the construction. Some of the primary and major uses of construction information in this project are: ï‚·Construction information helps in effectively managing the construction process as planning and making lists of resources required assist in making them available on time without any delay and hindrance in construction process. ï‚·It is used to avoid delay in construction project and prevent uneconomical operations or unavailability of the required requirement. ï‚·The construction information is used to identify the problems before and in the early stage of the construction which helps in arranging the alternative operators and suppliers before the requirement occurs. ï‚·Quality control records ï‚·Quality assurance records
ï‚·Legal documents like contracts and other important legal files ï‚·Planning the entire construction process ï‚·Designing the layout, schedules ï‚·Details of cash flow (b) Describe the different types of construction information and their uses. What type of construction information will you use for the current scenario and justify their use? There are various types of pre-construction information which is used to plan and clearly provide the definition of the project, harmful issues that can occur in the construction, analysis of the construction, scope and schedule of the project. Construction information can be categorized as follows: 1.Construction project information 2.Planning and management information 3.Safety information 4.Health and hazards information Construction Project information:Information regarding the construction project is included in this category. Basic details of the construction are mentioned in this type of information. The description of initial to final stage of the construction is included in construction project information. The dates and the entire schedule of the construction process are also mentioned. The contact information of every member of the person involved in the project of construction along with the arrangements of the project is included. Planning and management information:In planning and management information, details regarding the planning of the entire construction are done. How the management task of the construction will be implemented during the construction is planned and documented to avoid confusions and delays in the work. If any other alternatives required during the project, then it is also decided and mentioned. The security issues, site hoarding, emergency fire prevention, transportation, restriction on smoking, restrictions on parking, solutions to escape from site during the emergency conditions are also included. Safety Information:Issues concerned with the construction site and equipment that will be used are put into consideration in the safety information. The details of the existing structures if any, ground conditions, access, issues related to the nearby land or adjacent land and boundaries information are included. Risks are identified initially and preventive measures are set up and documented in the safety information of the construction information.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Health and hazard information:In this information, details that deals with the hazardous materials and things related to construction are included. The asbestos, contaminated land is the part of the health and hazard information. The issues relating to the storage and use of hazardous raw materials and if toxic material used in the construction are included are included in it. The safety measures and precautions are also suggested in this document. In this project majorly all the above mentioned construction information will be used in varying proportions. As this building will be used for an official purpose, so it will be used by lot of people of office and from outside the office, therefore safety information must be included along with the hazards and health information. The project information should also be included like scope of the project, cost of the project. Schedules of major phases of the project should be mentioned to make the entire process planned systematically. Agreements and legal contacts if any present and required must be included in this construction information. (c) Compare different types of construction information to identify their suitability in specific contexts The construction information is categorized on different basis and can be compared on the basic of their applications. The project information is used for giving the basic and major details of the project while planning and management information is used to make the layout of the construction process. In planning phase all tasks relating to the entire construction is decided as well as the management tasks are planned, schedule of the every construction phase so that progress at each stage can be recorded. The basic difference between safety information and hazard information is that if any hazardous material is used in the construction is identified and precautions are developed while in safety information the issues relating to the safety of the equipment and constructional site are mentioned along with the risks in the project if identified.
LO2 Develop construction drawings, details, schedules and specifications in support of a given construction project. (a)Prepareasetofgeneralarrangementdrawings,selecteddetailsand door/window schedules.
(b)Produce an outline bill of quantities Table1: Bill of quantity for wooden frames S.NODescriptionQuantityRate (in $) Amount (in $) 1Plain wooden base4035014000 2Plainwoodenside base 133504550 3Wooden wall stand33501050 4Wooden bottom side base 3435011900 5Wooden roof base3335011550 6Wooden pillars5035017, 500 7Wooden side base for doors and windows 4035014000 8Woodenbasefor doors 63502100 9Woodenbasefor windows 123504200 Total cost of wood: $80, 850 Table2: Bill of quantity for labor and other material S.NODescriptionQuantityRate (in $) Amount (in $) 1Cement bags9038034200
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
2Steel used for roof:10 bundle350035000 3Bamboo120 Pieces404800 4Nut bolts150659750 58 tractor stones8 tractors40000320000 6Sandstones small size1035000350000 7Rodforground foundation 50 kg502500 8sand5 tractors250012500 9Hardware for window and doors --25 10Laborcostand concrete engineer 1000 11Woodenengineer cost 800 Total cost: $ 770,575
(c)Compose a schedule of works. Table3: Schedule of work (d) Justify the use of specific types of construction information in Task 1 & Task 2 in support of the project. The construction information mentioned in the task 1 and task 2 is appropriate as per the project. The information of the project like cost of the project and schedules of the project is appropriate as it very important while starting any project. Information regarding the cost of the project is essential it helps in calculating the budget. Schedule information helps in planning the entire process from initial to final stage. Hazard information is totally useful in this project as it can clearly identify the hazardous issues in the project while the safety information identifies the risk in the project and the equipment. All the information depicted in the CAD drawing are appropriate according the requirement of the office building. Unit DescriptionCompletion Duration Pour foundation5 days Rough framing30 days Rough plumbing, electrical5 days Installation of insulation2 days Interior trim finishing5 days Exterior driveways and walkways5 days Finish mechanical trims2 days Install mirrors, doors10 days Final walkthrough building2days
LO3 Interpret different types of construction information in order to explain a construction project (a)Relate a set of construction drawings to a specification. Evaluate construction drawings and details to identify errors and clashes. (c)Critique a body of construction information, identifying errors and discrepancies. (d) Propose corrections to construction drawings and specifications using industry standard forms of notation. LO4 Assesswaysin which construction professionalscollaborate in the production of construction information. (a)Assessthetypesofinformationproducedbydifferentparticipantsina construction project. Using the current project as a case study. The different information provided in this project of construction is up to the mark. The needed information like cost of the project, schedule of the project is properly planned and estimated. Along with it, the materials required for the entire construction as well as the human resources and their cost are mentioned correctly. (b)Examine the relationship between different bodies of information and how they work in conjunction. In present scenario, different body of information works in collaboration with each other in construction projects as it is an interdisciplinary work and large number of complex information n are integrated with the other construction information and systems. It is most widely as construction project having simple client contractor relationship to complex projects with financial agreements, supply chain and design of supplier is involved.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Various details in the construction information is dependent on each other. The design of the project is directly related with the requirement of the client. The design is also related to the budget of the client and the final design is implemented by considering the estimated cost. The schedule information is directly related with the design and the duration of the project. Other essential systems and bodies of information which are working in conjunction with each other are: BIM, CAD, document management system, safety i9mnformation as well as health and hazard information. (c)ComparetherolesofCADandBIMinthecollaborativeproductionof construction information. CAD is used in designing electrical and mechanical components included in the construction project. CAD is used by the civil engineers, architects to make designs of the building to be constructed. Accurate drawings and new plans for the building in two dimensions and three dimensions is also a part of CAD in the construction. This is also used to prepare the draft the building. It is also used to create the initial designs and layouts of the building, calculations related to the construction of the building, details of the design, making new drawings if required and linking all these applications to the analysis and manufacturing. It assists the constructing by generatingthedetaileddesignof the projectbuildingin 2 dimensionaldiagramsand 3 dimensional diagrams. It also decrease the time required for designing as it provides simulation instead of testing the physical prototype or build structure. BIM is used designing the buildings which are used for commercial purposes (like airport, schools, office buildings, etc.). It is nowadays becoming the standard of the industry. BIM of the buildings also helps in detecting the collision and major issues relating to the construction are also identified. BIM is used to showcase the building project in the digital form which will be utilized for taking decisions during the construction process. Various information are part of BIM which is helpful in the construction information like geometry of the building, details regarding the geographical information & lidar , specifications, features, visual appearance, acoustic and thermal characteristics. The three dimensional design of the building is also connected and linked with the schedules of the construction process. Budget of the construction project can also be calculated by linking it with the 3d model.. Also cost per head is calculated by using 3d models of the BIM.
Conclusion: The construction information for 5 floor framed building which will be used for the office is designed in CAD along with different type’s construction information and their uses. The bill of quantity and schedule of work is prepared and the role BIM & CAD in construction explained. The drawing is evaluated and corrections are suggested as per the requirement.
References designbuilding. (2019). Collaborative practices for building design and construction - Designing Buildings Wiki. Retrieved from https://www.designingbuildings.co.uk/wiki/Collaborative_practices_for_building_desi gn_and_construction designbuildings. (2019). Pre-construction information - Designing Buildings Wiki. Retrieved fromhttps://www.designingbuildings.co.uk/wiki/Pre- construction_information newhomesource. (2019). Steps in the Home Building Process | 10 Step Home Build | NHS. Retrieved fromhttps://www.newhomesource.com/guide/articles/a-step-by- step-guide-to-the-home-building-process onelanic. (2019). What is PreConstruction? An O'Neal Perspective : O'Neal Inc. Retrieved from http://www.onealinc.com/news22.php Clevenger, C.M., Ozbek, M., Glick, S. and Porter, D., 2010, February. Integrating BIM into construction management education. InEcoBuild Proceedings of the BIM- Related Academic Workshop(Vol. 8).