About This Document

This study explores the processes and obligations in construction projects, including tender documentation and dispute resolution. It discusses the implications of client issues and the advantages and limitations of various options. The subject is Construction Law, Contracts and Dispute Resolution.

Construction Law, Contracts and Dispute Resolution

Prepare a professional report on contractual remedies and practical solutions for a substantial delay in a construction project.

   Added on 2023-04-20

ShareRelated Documents
Running head: CONSTRUCTION LAW, CONTRACTS AND DISPUTE RESOLUTION
Construction Law, Contracts and Dispute Resolution
Student Name:
Construction Law, Contracts and Dispute Resolution_1
1CONSTRUCTION LAW, CONTRACTS AND DISPUTE RESOLUTION
Table of Contents
1. 0 Introduction...............................................................................................................................4
2.0 Consideration of the Issues and Obligations.............................................................................4
2.1 Integration of the issues and obligations...................................................................................5
2.2 Disputes.....................................................................................................................................6
2.2.1 Staff and equipment removal..................................................................................................6
2.2.2. Staged access.........................................................................................................................6
2.2.3 Joint Contracts Tribunal.........................................................................................................6
2.2.4 Power and it disruption...........................................................................................................6
2.2.6 Building fire safety.................................................................................................................7
2.2.7 Student safety..........................................................................................................................7
2.2.8 Asbestos..................................................................................................................................7
3.0 Tender documentation...............................................................................................................8
3.2 Challenges..................................................................................................................................8
4.0 Equipment for disposal..............................................................................................................8
4.1 Enabling service and facilities...................................................................................................9
5.0 Comparison of JCT 2011 and 2016 with quantities................................................................10
5.1 Changes....................................................................................................................................11
5.2 Tender stage.............................................................................................................................11
6.0 Evaluation of advantages of several options...........................................................................16
Construction Law, Contracts and Dispute Resolution_2
2CONSTRUCTION LAW, CONTRACTS AND DISPUTE RESOLUTION
6.1 Advantages of various options.................................................................................................16
6.2 Disadvantages of several options.............................................................................................17
7. Conclusion.................................................................................................................................17
8. References..................................................................................................................................19
Construction Law, Contracts and Dispute Resolution_3
3CONSTRUCTION LAW, CONTRACTS AND DISPUTE RESOLUTION
Executive Summary
It is essential in construction projects to have proper processes like preliminaries, tender
documents, and tender stage that are discussed in the study. The obligations are imposed by law
imposed from the contract or negligence of the parties. Scope or specification and plans of work:
There are the possibilities that disputes may be raised in contrast of the scope of work
considering the possible modifications or amendments considering particular areas of the
construction project. The building structure for the new floor and the conflicting utilities are the
possible matter of disputes. The structural units interfering with the communication systems, life
safety, electrical, and mechanical are the conflicting stakeholders in this scenario. The
management needs resulting from the issues as well as recommends appropriate access to
dispute. The implications of client issues, advantages and limitations are discussed in the present
study.
Construction Law, Contracts and Dispute Resolution_4

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Construction Law - Assignment
|11
|3231
|419

Tender and Contract Management for Construction of a Large Thermal Solar Power Plant in NSW
|15
|4198
|493

Business Procurement and Contractual Practice
|13
|4288
|1

Methods of procurement and types of contract
|12
|3975
|1

Concepts and Theories of Contract and Dispute Management Techniques in Modern Commercial Construction Environment
|6
|1070
|336

PPMP20011 Construction Contract Variations Report
|4
|1058
|181