CONSTRUCTION MANAGEMENT
By Name
Course
Instructor
Institution
Location
Date

Task one A (Pile construction)
The first challenging problem that normally confronts the designer of any foundation is to
determine whether or not the conditions of the site are such that there is need for using the pile
system. The principle situation in which the piling system of the foundation may be needed have
been comprehensively illustrated. The most common cases that call for the use of the piling
system of the foundation is when the sub- soil is too much compressible or are just too weak to
provide support to the heavy vertical reactions. The transmission of the vertical reaction is from
the superstructure. In this particular case, the piles will serve as the extension of the columns or
the piers that aid in carrying the load to very deep substratum which is also very rigid. In cases
where such similar stratum does not exist, the transfer of the loads can be done gradually by the
system of the friction (Fernández, Torrens, Morales, and Martínez 2012).
The requirements for the use of the pile is because of the relative inability of the shallow footings
to aid in the transmission of the forces that are considered inclined and are basically
characterized by the overturning moments. Such situations are common features of the earth
retaining structures design with tall structures which are suspected to be subjected to high
earthquake or just very strong winds. The operation of the shaft is such that they resist the
upward forces by the use of the negative friction found around the shaft itself. The horizontal
forces are also getting resistance by either the vertical or the battered piles which normally
function as the structural system which combines the lateral resistance and the axial group of
forces (Tay, Panda, Paul, Noor, Tan and Leong 2017).

Figure 1: Construction of pile (Tay, Panda, Paul, Noor, Tan, and Leong 2017).
Although the use of the foundation is normally linked to the presence of some weak strata in the
profile of the soil, it is by no means restricted to the similar conditions. The type of the soil for
this site is actually alluvial one whose depth is almost 18 metres. This basically implies that
safety of the structure can only be guaranteed by the use of the pile system. The structure will
actually protect the building by ensuring that there is proper limitation of the movement of the
foundation. In this particular project, the end bearing pickles would be preferred for the use. The
bottom end of the pile rests on a layer of very strong soil or just the rock. The transmission of the
load of the building is through the system of the pile onto the strong layer (Masters 2012).
The construction of this kind of the pile foundation is by the use of the pile driver. This is
basically a machine component that holds the pile perfectly vertical and then hammers it down
into the ground blow by blow. Each of the blows is achieved by the lifted heavy weight and then
having it dropped on top of the pile. In this process the pile is temporarily covered by the steel

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Civil Engineering Technology
|15
|4482
|49

Research Paper on Analysis of Screw Piles
|8
|1307
|231