This document discusses the important aspects of construction management, including time management, quality management, and health and safety measures. It also explores the problems faced in the construction of the Golden State Bridge and provides recommended solutions. The case study focuses on the construction project of the Golden State Bridge in San Francisco.
tabler-icon-diamond-filled.svg

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Document Page
Construction
management
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Table of Contents
INTRODUCTION ..........................................................................................................................3
TASK...............................................................................................................................................3
Important aspects related to the construction management........................................................3
TASK2 ............................................................................................................................................9
Identification of problem within project.....................................................................................9
Raising cost of raw material problem:........................................................................................9
Analyse the source of problem..................................................................................................10
Recommended solutions for problem.......................................................................................11
CONCLUSION .............................................................................................................................13
REFERENCES..............................................................................................................................14
Document Page
INTRODUCTION
Construction management is referred as a professional services which utilised various
specialisation, project management techniques in order to develop effective and appropriate
planning, specific designs and construction of project from the beginning to the end point of
specific project. Management is important part of very project and handle its all aspects as well
as resources in order to complete it in defined manner. The main purpose of construction
management is to control all aspects such as cost as well as quality of construction, time of
delivery and resources in effective and most efficient manner so, the project is completed on
same manner that is planned. In construction project, skilled and experienced employees and
managers are required who are able to handle all public safety aspects, time and cost
management, take proper decisions regarding situation, calculate all problems and challenges as
well as formulates effective strategies to overcome them in efficient manner. In this report the
case study of golden state bridge in San Francisco has been chosen which is a suspension of
bridge that connect San Francisco Bay and the Pacific Ocean. The construction of the respective
bridge is starts on January5, 1933 with the measurement of 90ft. Width and 746ft height. The
construction project is maintained by Golden Gate Bridge, highway and Transportation District
located in San Francisco, California and Marin country, United State. In this report time
management, cost and quality management and construction methods and equipments are
covered. Apart from that problems in projects and their solutions are being discussed in this
project report.
TASK
Important aspects related to the construction management
In order to complete the construction project in defined manner, managers have to
handle and manage all resources in efficient manner, develop various effective strategies in order
to achieve defined objectives with time. There are various aspects that are related to construction
management are such as managing the project on time with in defined cost and resources
(Barbudo, 2020). Apart from that quality management, health and safety, construction methods
and equipment as well as effective leadership strategies with in all level of project that help
managers to complete the respective task on time with defined quality measures. In Golden state
bridge construction project, construction managers evaluate all market trends, resources and
Document Page
other parameters in order to develop effective strategies to accomplish the construction before
dead line with having all safety parameters (Brioso, Aguilar and Calderón-Hernandez, 2019).
Some of important factors that plays important role in construction management are being
discussed below:
Time management:
Time management is determined as the process of organising, managing as well as
implementing various strategies in specific manner with time constraint that is required to
complete the respective work activity in project. Effective time management is help the
organization to complete the defined task in successful and efficient manner through meeting
defined budget and targets. It facilitates the management team to achieve high profitability goals
and objectives. In the construction project time management is very important, managers allocate
all construction activities according to time, a proper plan is being prepared that mention all dead
lines and other important informations those are required to complete the project on time. These
time lines are communicated at all level of employees in order to make them aware about project
as well as enables them to complete the project on time with having all quality constraint. In
Golden state bridge construction project all time measurement are being decided, as the bridge
take four years to complete the construction in the way which is decided. Delay in allocating
resources, formulating policies and understanding these policies take too much time which affect
the fluency of project completion. In order to avoid these time delays construction managers
conduct proper market environment research, set all priorities as well as non priorities and
establish all goals and objectives of each department as well as communicate them to the
employees. So, they complete their defined task on time with more efficiency.
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Importance of time management in construction
Construction organisations required professional and skilled employees that have all
competencies to fulfil all clients desired building through its quality work. These professionals
take their salary on the bases of hours that is the biggest expenditure of the construction project.
So, it is necessary to utilise these resources efficiently in order to maintain the project. Time
management within Golden state bridge construction project assures that these professional put
their time in doing right thing that enhance overall quality of bridge (Bröchner, 2018). As the
time management is the essential thing that organise all construction activities as well as
implement them on defined time frame in order to enhance overall proficiency as well as
productivity of workers. In order to strategies all work with respective time, the project manager
assign all project members schedule . All these schedules are aligned with respective master plan
to accomplish it most desirable manner. Time management is the responsibility of project
manager, on the working site it is not possible to manage all working efficiency of every one but
because of time management tools and techniques facilitates managers to use various
management software, aligned all these activities to the builders' schedule. Planning, scheduling
as well as prioritizing is the most important part of time management (Burgett, Perrenoud and
Smith, 2018). Effective planning is formulated after measuring all factors such as resources,
market trends and many more after that these planning is communicates to the higher as well as
lower level employees in systematic manner in order to get things done in efficient manner.
Strategies of time management
Illustra
tion 1: Time management, (2021)
Document Page
Golden state bridge construction project managers are formulates various strategies to
manage all time of each activities such as planning the overall project before starting it, all plans
delegate among all project members, avoid any destructions, organise all data is sequential
manner, implement various time saving tools and techniques, prepare effective strategical notes,
allot extra time for sudden urgencies, conduct various meetings to solve issues and create
advanced policies as well as implement them in better manner to complete task on time with
efficiency (Effective time management tips and importance in construction,2021). In order to
complete all construction work on time all strategies must communicated at all level of
employees in order to enhance their knowledge about their roles and responsibilities. Effective
strategies help construction company to complete the projects within time line.
Quality management:
Quality management is referred as the activity that overseeing all task and functions in
order to accomplish as well as maintain in desirable manner. There are various elements are
included such as quality policies, developing as well as implementing quality planning and
strategies in effective and efficient manner, control over quality and add some improvements if
required. It is also termed as the total quality total quality management.
In construction project, quality is the most important constraint that must be followed by
the Golden state bridge construction project in order to assure the all quality measurements. In
modern construction practices quality management has become the essential part that implement
all quality management principles as well as initiates all activities in efficient manner. Quality
management system such as ISO 9000 is standards that are implemented in respective
construction project. Construction company use quality materials and other things like steels to
ensure the quality of bridge. There are various tools and techniques are occur in Golden state
bridge construction project that provides various opportunities in order to improve all issues
related to the cost and timeline (Importance of Quality Management Systems in Construction
Industry,2020). Different brainstorming sessions, Pareto analysis and fishbone diagrams are
implemented to resolve various problems and issue to enhance the quality of construction
project. There are different type of methods are used in respective construction project that are
discussed below:
Document Page
Gantt chart: Gantt chart is the most important tool of project management that represent
the various project activities against to the time constraint and each activity is represented in the
form of bar that reflects the time of starting project, its duration as well as closing time. In
Golden state bridge construction project, it is used to scheduling as well as monitoring all
defined task within project, communicate all plan or status at all project level, all sequence and
their durations as well as defined the dependencies of task upon each other. All these measures
help to achieve the high quality objective in construction of bridge.
Construction quality management tools: Quality in Golden state bridge is very
important factor that ensure the safety and security of peoples who pass through it. In order to
assure about quality measurement, construction companies use various quality management tools
and techniques such as Scatter diagram, flowchart, control chart and brainstorming that provide
the information of quality constraints (Ghanbaripour, Sher and Yousefi,2020). All these tools
and techniques are implemented by the construction organisation to build Golden state bridge in
defined manner. These techniques defined the time as well as quality measures in order to
complete the construction projects on tome with estimated quality.
Importance of quality management in construction:
Quality management system is being utilised in Golden state bridge construction by
implementing various effective quality planning, assurance as well as control measures. It helps
Illustration 2: Quality mangement , (2021)
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
the construction company to achieve all defined objectives with time frame. It assure the
respective construction organisation to complete the project on defined time line with minimum
possible cost. There should be maintained the balance between cost quality and time. Effective
quality management system ensures the smooth as well as trouble free transactions with
minimum defects. Quality management facilitates to meet all requirement of client as well as
enhance their satisfaction level (Ghodrati, Yiu and Wilkinson, 2018). Construction company set
various quality measures according to the requirement of clients. It also help to ensure the
durability as well as sustainability of respective construction for long time. Quality of bridge is
very important that ensures the safety perspective also.
Health and Safety:
Maintaining health and safety is a major challenge for every construction company, it is
also important for a company to give utmost priority to health and safety of workers. In
construction of The Golden Gate Bridge, there was deployment of a heavy workforce. There was
also involvement of various heavy materials related to construction, this could lead to cause
casualty in its construction management. To ensure health and safety of various workers in a
construction company, there is a need of deployment of a health and safety management team.
By doing deployment of health and safety team in construction of sea gate bridge, life threat for
various employees could be saved. In construction of a bridge, it is also essential to make a
Dispensary at the construction site as well as there should be feeling sense in the mind of labour
to perform operations with precautions. It is majorly the role of Health and safety management to
provide a safe environment for the construction works. In the construction of this bridge there
must be an ambulance, so that in case of any emergency, it acts with optimum efficiency. There
is an importance of health and safety management at the Golden Gate Bridge which is explained
below:
Safe environment- It is the major function of Health and safety management to develop a
safe and precise working environment in a business (Ghodrati, Yiu and Wilkinson, 2018). If
there is a safe environment at the construction site, labour will not be hesitated while performing
various task and activities. This will also increase efficiency of the labour force, it will also lead
to formation of a dynamic workplace for the labour activities.
Increase potential- With the application of health and safety management in a business,
it is also possible to increase the present potential in the labour. Increase in potential of
Document Page
employees will also save time of the whole construction work as it will lead to formation of cost
saving environment. Increase in potential of the employees will also lead to formulate various
techniques and tools of labour motivation.
Protection equipments- There is a need of all the necessary protection equipments in
order to protect the body of labours from damage. There are various protection equipments
which are applied to the whole body before starting construction work. With the help of
protection equipments there will be a safety management deployment at Golden Gate Bridge.
Risk Free operations- The operations related to construction work should be risk free, in
order to maintain smooth operations at construction site. Every construction company should
ensure risk free operations in order to increase maximum efficiency from its operations. The
health and safety management can bring various dynamic solutions related to protection of
labour force (Gluch and Svensson, 2018). There is a huge involvement of risk and in order to
make construction work for such a long bridge in California, San Francisco. The Health
management department should also make a list of persons who are vulnerable to construction
site and provide them extra safe working environment. It should be the utmost priority of a
health and safety to function according to current working needs of labour force.
All health and safety measurements are required to be maintained as well as followed
because construction projects are includes various harmful activities as well that may harm
employees and other one. So, it is assure by the construction organisation that all safety
parameters must be followed in appropriate manner.
TASK2
Identification of problem within project
Construction industry face various problems in order to build the specific building, bridge
and any other thing such as time, cost as well as quality management, health and safety
measures, leadership, procurement strategies and selection the best construction methods. All
problems affect the profitability as well as productivity of the construction. In order to remove
all these problems construction organisation research all current market trends and requirement.
In the process of building Golden state bridge face various market related problems. The main
problem that affect the construction is the raising cost material. Material is very important factor
from that bases the bridge is constructed (Strategies to Offset the Rising Material Costs in
Document Page
Construction,2017). In construction of Golden state bridge steel is major material that is used.
From various different internal as well as external affect the price of raw materials regularly
increased that enhance the overall cost of construction.
Raising cost of raw material problem:
Materials are important factor that help in construction to attain all desirable goals and
objectives in effective and efficient manner. Increment in the cost of raw material is the biggest
problem for the construction of Golden state bridge that enhance the overall cost and affect the
quality as well. There are various factors that are able to raise the cost of material such as
different tariff charges and trade issues as per various environment regulations as well as change
in demand. In the construction of Golden state bridge various materials such as steel, fuel and
iron which prices are increasing at very fast rate that affect the overall cost of construction. In
some years, it is analysed that construction material rates are continuously increased that prices
also affect the development cost of construction. As the Golden state bridge is the longest
suspension bridge world which is build across the golden gate or from the opening of San
Francisco bay that is situated in the Pacific Ocean. In the construction of respective bridge huge
amount of raw material is required. Increase in the prices of material affect the construction in
various manner as well as enhance the overall cost (Rising material prices are hurting many
construction companies,2017). The construction industry spend the amount in the protecting the
employees from any hazardous situation and material prices as well as shipping delays that is
very hard to cope up. High priced materials affect the completion of the construction project
within defined time period.
Analyse the source of problem
Raising prices of raw materials affect the construction process as well as enhance the
overall cost of manufacturing the bridge. As the Golden state bridge is the longest bridge width
is 24 meters and hight is approximately 67 meters that required variety of raw material with huge
amount. Mainly the material is used in the constructing bridge is steel. The scarcity of material
raises the prices that affect the contractors as well as quality of the bridge. Expensive
construction materials leads towards the high construction and labour cost. There are various
reasons that enhance the prices of materials (Ibrahim, Hanna and Kievet, 2018). These sources
are discussed below:
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Raising fuel prices: There are various transportation mediums are being used to transport
the material from one destination to another and transportation vehicle needs fuel to carry these
materials. Enhancement in the fuel rates or prices enhance the cost of contractor to to get the
material. As the Golden state bridge is required the huge amount of raw material that is
transported from different countries as well as it needs to high technological factors to implement
various features that are bring by the vehicles (Sanchez and Haas, 2018). High fuel rates enhance
the overall construction cost and well as take too much time to gel material also affect the
construction of bridge.
Increment in tariff: Increment in tariff charges is the major source of enhancement of
material prices. Steel and aluminium tariff charges increase the overall bid prices as a result, the
cost of construction of Golden state bridge is increased. The main material of building bridge is
steel and the increment in the steel tariff enhance the prices of steel. In construction the material
is being imported from various countries that charge the taxes and tariff on evert slot of import as
a result the cost of construction is being enhanced. If the total cost of construction is formally
decided by the contractor with client then the enhancement in the raw materials impose the huge
risk and losses to the contractor.
Shortage of skilled Craftsmen: In the construction of Golden state bridge, skilled,
experienced employees are required who have professional in this field and have various
analytical, technical as well as theoretical knowledge perform all function in effective as well as
efficient manner. Construction companies offers the attractive and appropriate compensation,
wages and salaries to its employees in order to sustain with organization and provide it various
competitive advantages. Shortage of skilled labour is determine as the less people are available
to complete the construction project. Human resource plays important role in the
accomplishment of constructing bridge in efficient but insufficiency of these resources enhance
the overall cost of building bridge.
Outdated equipment: Increment in the prices of materials affect the investment of
contractor within construction of bridge. That means construction companies do not purchase the
new technologies and equipments; instead of they using the outdated equipment that affect the
efficiency as well as take long time to construct bridge on the other hand, consume the high
material. Golden state bridge is the biggest bridge that links the different areas so, outdated
Document Page
equipment affect the efficiency as well as productivity level (Sheng, 2018Sun, 2017). On the
other hand, new technologies and equipment enhance the overall cost of construction of bridge.
Hence, all these sources enhanced the cost of raw material that are used in the
construction process of Golden state bridge in San Francisco.
Recommended solutions for problem
As the cost of material is regularly increasing that affect the overall cost of construction.
There are various strategies are formulated, theories are implemented that facilitates the
organisation to use the available resources in effective and efficient manner. As resources are
very important factors that are responsible for accomplishment of project in defined manner. In
the construction of Golden state bridge faces various problems related to high price of materials.
Respective project team conduct the proper market research to identify the problems that affect
the efficiency constructing the bridge (Sundquist,Gadde and Hulthén, 2018). Various models
and theories also applied to know about various other market trends in order to find the solutions
of the high rated materials problems that enhance the overall efficiency as well as reduce the cost
of construction effectively. These solutions are discussed below:
Embrace Prefabrication: Construction companies use embrace prefabrication theories in
order to reduce the waste as well as enhance the overall efficiency of project. The traditional
sources of construction enhance the waste materials and cost of construction also. By using the
prefabrication component in constructing bridge reduce waste because the materials are designed
off-site by the different company. All designs are co-ordinated in advance manner that facilitates
the construction companies to only purchase and use them effectively. Off site building reduce
the cost of labour that help the companies to balance high cost of material as well as enhance the
productivity of construction project.
Plan with Building information modelling: Building information modelling is the
combination of various construction designs and graphics technologies as well as it is related to
the computer aided designs. It provide the more comprehensive visualisation of Golden state
bridge at every level of process. In this respective model various concepts are included such as
conceptual designs, construction logistics and operations. Implementation of BIM model help to
evaluate the final result of construction. It enhance the ability to estimate the requirement of
materials as well as reduce overall cost of construction. ]
Document Page
Lean construction: In the process of lean design and construction various aspects are
included such as planning the whole construction in order to increase the productivity level as
well as reduce the wastage of materials. Lean construction reduces the safety hazards as well as
facilitates the contractor as well as client to improve the cost saving. It is analysed that by using
lean construction in organisation reduce the material waste by 64 percent. It increase the
accountability of employee for their performance that enhance overall efficiency level in
construction.
Construction field management software: In current competitive market environment,
technologies are used on job sites. Incorporation of field management software enhance the
ability to manage the construction project in right manner. It provides the best solution for the
problems as well as challenges that are faced by the construction company. These management
software applications work for all applicable parties such as general contractor, property owner
and designing team. In order to save the data, cloud based storage that could be accessed from
every location (Tam, 2019). All these software help to manage all construction work in efficient
manner. These construction management software supports operating systems such as MacOS
and windows 8. It reduce the overall cost of construction as well as it ensures the better
communication through out the process to reduce the waste of material or assure the optimal
utilisation of resources.
All these models and theories help the construction company to construct Golden state
bridge with all safety and quality measurements. All problems that are faced by company like
raising cost of materials, these solutions facilitates to reduce the cost as well as wastage of
materials that ensures the high performance and effective construction.
CONCLUSION
As per the above report, it can be concluded that management is required in any field to
manage all activities, functions and task efficiently and effectively. In the construction field,
construction effective planning, strategy formulation, resource allocation and control is required
in order to complete the construction on time with having all safety as well as quality parameters.
There are various factors such as time management, cost management, quality management,
health and safety as well as construction methods that are necessary to implement in construction
project in order to complete it on time with having all parameter. Effective management help to
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
attain all determined goals and objectives in efficient manner. In process of constructing building
company faced various problems related to availability, cost as well as quality of material. There
various sources that are the reason of raising such problem. There are various models and
theories that facilitate the organisation to find the suitable solutions to resolve the problems in
effective manner.
Document Page
REFERENCES
Books and Journals
Barbudo, A., and et. al., 2020. Recommendations for the management of construction and
demolition waste in treatment plants. Environmental Science and Pollution
Research. 27(1). pp.125-132.
Brioso, X., Aguilar, R. and Calderón-Hernandez, C., 2019. Synergies Between Lean
Construction and Management of Heritage Structures and Conservation Strategies-A
General Overview. Structural Analysis of Historical Constructions.pp.2142-2149.
Bröchner, J., 2018. Construction economics and economics journals. Construction management
and economics. 36(3). pp.175-180.
Burgett, J. M., Perrenoud, A. and Smith, J. P., 2018. Identification and prioritization of critical
subject matter within mechanical systems curriculum in construction management
education. International Journal of Construction Education and Research.14(4).pp.295-
312.
Ghanbaripour, A. N., Sher, W. and Yousefi, A., 2020. Critical success factors for subway
construction projects–main contractors’ perspectives. International Journal of
Construction Management. 20(3). pp.177-195.
Ghodrati, N., Yiu, T. W. and Wilkinson, S., 2018. Unintended consequences of management
strategies for improving labor productivity in construction industry. Journal of safety
research. 67. pp.107-116.
Ghodrati, N., Yiu, T. W. and Wilkinson, S., 2018. Unintended consequences of management
strategies for improving labor productivity in construction industry. Journal of safety
research. 67. pp.107-116.
Gluch, P. and Svensson, I., 2018. On the nexus of changing public facilities management
practices: purposive and co-creative actions across multiple levels. Construction
management and economics. 36(5). pp.259-275.
Ibrahim, M., Hanna, A. and Kievet, D., 2018. Comparative analysis between project delivery
systems through quantitative assessment of project performance. In Construction
Research Congress 2018 (pp. 670-680).
Sanchez, B. and Haas, C., 2018. Capital project planning for a circular economy. Construction
Management and Economics. 36(6). pp.303-312.
Document Page
Sheng, Z., 2018. Fundamental Principles Behind the Theory of Mega Infrastructure Construction
Management. In Fundamental Theories of Mega Infrastructure Construction
Management (pp. 135-183). Springer, Cham.
Sun, C., and et. al., 2017. A literature review of the factors limiting the application of BIM in the
construction industry. Technological and Economic Development of Economy. 23(5).
pp.764-779.
Sundquist, V., Gadde, L. E. and Hulthén, K., 2018. Reorganizing construction logistics for
improved performance. Construction management and economics. 36(1). pp.49-65.
Tam, V.W., and et. al., 2019. A review on international ecological legislation on energy
consumption: greenhouse gas emission management. International Journal of
Construction Management. pp.1-12.
Online:
Effective time management tips and importance in construction.2021 [Online] Available
through :<https://www.procrewschedule.com/effective-time-management-tips-and-
importance-in-construction/>
Importance of Quality Management Systems in Construction Industry.2020 [Online] Available
through :<http://www.auraqualitymanagement.com/blog/importance-quality-management-
systems-construction-industry/>
Strategies to Offset the Rising Material Costs in Construction.2017 [Online] Available
through :<https://blog.plangrid.com/2018/05/4-strategies-to-offset-the-rising-material-costs-in-
construction/>
Rising material prices are hurting many construction companies.2017 [Online] Available
through :<https://azbigmedia.com/real-estate/rising-material-prices-are-hurting-many-
construction-companies/>
Time management.2021 [Online] Available
through:<https://corporatefinanceinstitute.com/resources/careers/soft-skills/time-
management-list-tips/>
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Quality management.2021 [Online] Available through
:<https://asq.org/quality-resources/quality-management-system>
Document Page
Document Page
chevron_up_icon
1 out of 19
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]